| 2001-01-08 00:00:00 | BUILDING PLAN REVIEW |
| | 1): FRONT ENTRY / VESTIBULE 6" CHANGE IN |
| | GRADE. FL. ACCESSIBILITY CODE 4.3.2 |
| | THERE WILL BE AT LEAST ONE ACCESSIBLE |
| | ROUTEPROVIDED FROM PUBLIC TRANSPORTA- |
| | TION STOPS, ACCESSIBLE PARKING, LOADING |
| | ZONES AND TO THE ACCESSIBLE BUILDING |
| | ENTRRANCE THEY SERVE. |
| | 2).W P B ADMIN.CODE 104.2.2/1606SBC |
| | SPECIFIC WINDOW AND DOOR BUCK DETAILS. |
| | 3).S.B.C. 1606.2.6.2 COMPONENTS & CLADD- |
| | ING.PRODUCT APPROVAL REPORTS FOR WINDOWS |
| | EXT DOORS,GLASS BLOCK & ROOFING MATERIAL |
| | 4).SBC 1606.4.1/ 1707.4.1 STORM SHUTTERS |
| | REQUIRED FOR GLAZED OPENINGS NOT PASSING |
| | LARGE MISSLE IMPACT TESTING, A SBCCI OR |
| | DADE COUNTY REPORT REQUIRED. A SCHEDULE |
| | AND KEY INSTALLATION PLAN WILL BE |
| | REQUIRED, SEE ATTACHED POLICY. |
| | 5). 104.2.2 ADD INFO REQUIRED ON THE |
| | STRUCTURAL MEMBER THAT WILL BE BETWEEN |
| | THE ARCHED WINDOWS AND WITHER WINDOWS |
| | BELOW. ATTACHMENT OF WINDOWS AND ATTACH- |
| | MENT TO THE BLOCK OR COLUMNS. |
| | 6). 104.22 ADD INFO REQUIRED, WINDOWS |
| | WITH RADIUS HEADS HOW WILL THE INFILL |
| | OCCUR WHEN USING DETAIL WINDOW A-A? |
| | 7).ENERGY CALCULATIONS |
| | 8).SOILS TEST REPORT 1804.2 GIVING |
| | BEARING VALUE. |
| | 9). F102.2.4 (FIRE ZONE) FIRE RESISTANT |
| | ROOF COVERINGS CLASS A OR B AS DEFINED |
| | IN 1503.2. |
| | 10).ARCH DETAILS PAGE A-6 (FIRE ZONE) |
| | ARCH TRIM-APPROVED NON COMBUSTIBLE |
| | MATERIAL OR FIRE RESISTANT TREATED WOOD. |
| | 11). THESE SAME DETAILS WILL REQUIRE ADD |
| | INFO, THE BOTTOM DETAIL DOESN'T GIVE ANY |
| | FASTENING TO THE TOP PLATE OR LEDGER. |
| | THE UPPER DETAIL ALSO DOESN,T GIVE HOW |
| | TO ATTACH THE TOP LEDGER OR HOW THE LOOK |
| | OUTS ARE TO FASTENED TO THE LEDGERS. |
| | |
| | BUILDING PLAN REVIEW |
| | JIM WITMER |
| | (561) 659-8096 EX 8412 |
| | |
| | PLEASE RETURN THE REVIEWED PAGES AFTER |
| | THE CORRECTIONS ARE COMPLETED, THIS WILL |
| | EXPEDITE THE REVIEW PROCESS,IF YOU HAVE |
| | ANY QUESTIONS PLEASE CALL, THANK YOU. |