| Date |
Text |
| 2001-01-08 00:00:00 | |
| | |
| | *************BUILDING UNSAT************* |
| | |
| | SBC 104.2.2 |
| | |
| | 1)PROVIDE 2 CURRENT COMPLETE COPIES OF |
| | SBCCI OR METRO DADE PRODUCT APPROVALS |
| | FOR: |
| | ALL SH WINDOWS |
| | MULLIONS |
| | FRENCH DOORS WITH SIDELITES |
| | ALL EXTERIOR SWING DOORS |
| | GARAGE DOORS |
| | ROOF COVERING UNDER SEPARATE PERMIT |
| | |
| | 2)PROVIDE STORM PANEL INSTALLATION |
| | SCHEDULE AND KEY PLAN WITH SPECIFIC |
| | MOUNTING AND ANCHORS TO BE USED. |
| | |
| | 3)PROVIDE ENERGY CALCULATIONS |
| | |
| | 4)PROVIDE 2 CURRENT SIGN AND SEALED |
| | SURVEYS WITH ALL IMPROVEMENTS TO BE MADE |
| | SHOWN ON SURVEY. |
| | |
| | 5)PROVIDE 1 BATHROOM DOOR WITH 29" NET |
| | CLEAR OPENING ON HABITABLE GRADE LEVEL |
| | FACBC 4.22.2 |
| | |
| | 6)PROVIDE CEILING HEIGHT TO COMPLY WITH |
| | 1997 SBC 1203.2 CLARIFY +- 7'BOT OF BEAM |
| | HABITABLE SPACES CEILING HEIGHT SHALL BE |
| | 7'6" |
| | |
| | 7)PROVIDE DETAILS OF NEW WALL CONNECTION |
| | TO EXISTING WALLS. |
| | |
| | 8)PROVIDE ROOF SHEATHING NAILING ZONES |
| | THAT COMPLY WITH CITY AMENDMENTS FIG. |
| | 2306.1 SBC 1606 |
| | |
| | 9)PROVIDE SPECIFIC WINDOW,EXTERIOR DOORS |
| | AND GARAGE DOORS BUCK CONNECTION DETAILS |
| | FOR WINDLOAD COMPLIANCE. SBC 1606 |
| | |
| | 10)PROVIDE A5 FLOOD ZONE ELEVATION |
| | CERTIFICATE WITH NEW CONSTRUCTION FLOOR |
| | ELEVATION OF 7.5' |
| | |
| | 11)PROVIDE NOC RECORDED WITH CLERK OF |
| | COURT BEFORE BUILDING PERMIT CAN BE |
| | ISSUED. |
| | |
| | 12)PROVIDE PAID IMPACT FEE RECEIPT. |
| | |
| | 13)PROVIDE DRIVE UNDER SEPARATE PERMIT. |
| | |
| | ANY QUESTIONS PLEASE CALL |
| | FRANK KNAPP |
| | BUILDING PLAN REVIEW |
| | CITY OF WEST PALM BEACH |
| | 659-8096 EXT 8392 |