| Date |
Text |
| 2002-01-25 00:00:00 | REVISION CHECKLIST: |
| | 1-EXTERIOR STAIRS AT SOUTH ELEVATION |
| | DON'T COMPLY WITH RATIO OF SECTION |
| | 1007.3.1 SBC 1997. REVISE AS REQ'D. |
| | 2-STAIRS AT GARAGE DON'T COMPLY WITH |
| | STAIR RATIO. REVISE AS REQUIRED. |
| | 3-NEED TO PROVIDE A LANDING AT OUTSIDE |
| | DOORS FROM FAMILY ROOM AS REQUIRED BY |
| | SECTION 1012.1.6 SBC 1997. REVISE. |
| | 4-NEED TO PROVIDE RAILINGS AT ENTRY |
| | STEPS. SEC. 1007.5.1. ALSO, SEE SEC. |
| | 1007.5.7 FOR LOCATION OF RAILINGS. |
| | 5-PROVIDE SMOKE DETECTORS AT EACH STORY |
| | BY THE STAIWAY. SEC. 905.2.2 SBC 1997. |
| | 6-CLARIFY WHERE IS THE LAUNDRY CHUTE |
| | GOING TO. PROVIDE DETAIL/SECTION. |
| | 7-REVISE SIZE OF ATTIC ACCESS IN BEDROOM |
| | #2 CLOSET. SEC. 2309.6 SBC 1997. |
| | 8-BALCONY RAILINGS TO HAVE BOTTOM RAIL'G |
| | THAT WILL NOT ALLOW A 2" SPHERE TO |
| | PASS THRU. SEE SEC. 1015.3 SBC AND |
| | REVISE DRAWINGS AS REQUIRED. |
| | 9-WHERE IS DRAWING A-7.2? |
| | 10-ENLARGED MASTER BEDROOM PLANS AND |
| | ELEVATIONS ON SHEET A-7.3. |
| | 11-DATE WHEN ALL ARCHITECTURAL DRAWINGS |
| | WERE SIGNED IS INCOMPLETE. WHAT YEAR |
| | WERE THEY SIGNED? FOLLOW CHAPTER 481 |
| | FL. STATUTES REQUIREMENTS. |
| | 12-NEED TO PROVIDE ATTIC ACCESS AT ROOF |
| | ABOVE GARAGE. SEC. 2309.6 SBC 1997. |
| | 13-PROVIDE FRAMING DETAILS AND SPECS AT |
| | ROOF AREA ABOVE GARAGE TO ALLOW FOR |
| | ACCESS TO NEW SUNDECK. SEC. 104.2.2 |
| | CITY AMENDMENTS TO SBC 1997. |
| | -PROVIDE FRAMING AND SPECIFICATIONS FOR |
| | NEW SUNDECK. NOTE THAT FRAMING WAS |
| | DESIGNED FOR A FLAT ROOF. NOW, THE USE |
| | WAS CHANGED FOR A SUNDECK. THEREFORE, |
| | LIVE LOADS CHANGE. SEE TABLE 1604.1 |
| | SBC 1997 AND REVISE DWGS AS REQ'D. |
| | 14-SHEET S.2.0 IS VERY CONFUSING. IS IT |
| | 1ST OR 2ND FLOOR FRAMING? |
| | -IS THIS THE FRAMING PLAN USED TO RAISE |
| | HOUSE TO THE MIN. FIN. FLOOR REQ'D?. |
| | -PROVIDE SEPARATE FRAMING PLANS FOR |
| | EACH FLOOR. |
| | 15-PROVIDE INFORMATION FOR ENTRY GATES |
| | UNDER A SEPARATE PERMIT. |
| | 16-SEE COMMENTS ON PLANS AND RETURN |
| | REVIEWED SET AFTER REVISIONS ARE DONE |
| | TO ORIGINAL DRAWINGS IN ORDER TO |
| | EXPEDITE THE REVIEW PROCESS. |
| | -SEE ELECTRICAL COMMENTS. |