| Date |
Text |
| 2001-01-08 00:00:00 | ***************DENIED******************* |
| | |
| | 1. PROVIDE OUTSIDE AIR SCHEDULE PER |
| | ASHRAE 62-89. |
| | 2. PROVIDE AIR BALANCE SCHEDULE SHOWING |
| | COMPLIANCE WITH 1997 SMC 501.2. |
| | 3. 1997 SMC 610 REQUIRES LOCATION OF ALL |
| | FIRE DAMPERS ETC. TO BE CLEARLY SHOWN |
| | ON PLAN ALONG WITH THE INSTALLATION |
| | DETAILS BY DESIGNER. NO FIRE DAMPERS |
| | SHOWN ESP. AT SHAFT WALL PENETRATION. |
| | 4. CLEAR UP CONFLICT BETWEEN EQUIPMENT |
| | SCHEDULE AND REFRIGERANT PIPE SCHEMATIC |
| | ON AC-3. |
| | 5. SHOW CFM VALUE OF DROP IN FRONT OF |
| | BEER COOLER. |
| | 6. INDICATE LOCATIONS OF RETURN AIR |
| | GRILLS INTO CEILING PLENUM. |
| | 7. NOTE: NO COMBUSTIBLES ALLOWED IN |
| | RETURN AIR PLENUM ABOVE CEILING AREA. |
| | PER 1997 SMC 609.1.1 (INCLUDING NO PVC) |
| | 8. DUCT SMOKE DETECTOR TO BE TIED TO |
| | BUILDING FIRE ALARM SYSTEM. |
| | 9. PROVIDE ELEVATION SHOWING HOOD |
| | EXHAUST DUCT PITCH REQUIRED 1" PER FOOT |
| | SLOPE BACK TO HOOD.(BOTH HOODS). |
| | 10. REQUIRED ENCLOSURE FOR GREASE |
| | EXHAUST DUCT TO BE FOR A SINGLE EXHAUST |
| | DUCT AND FOR NO OTHER PURPOSE PER 1997 |
| | SMC 505.9. PLAN SHOWS OTHER DUCTS AND |
| | PIPING IN SHAFT. CLEARANCE FROM DUCT TO |
| | INSIDE OF ENCLOSURE TO BE MIN. 6" PER |
| | 1997 SMC 505.9.1. |
| | 11. ACCESS TO AHU TO BE PROVIDED FOR |
| | SERVICE AND CLEANING PER 304.3. PROVIDE |
| | MANUFACTURES REQUIRED CLEARANCE AREA |
| | TO BE DEDICATED FOR SERVICE AND CLEANING |
| | 12. NOTE: SEPARATE PERMITS ARE REQUIRED |
| | FOR WALK IN COOLERS/FREEZERS AND HOOD |
| | SYSTEMS INCLUDED ASSOCIATED DUCT WORK. |
| | COMPLETE PLANS ARE REQUIRED AT TIME OF |
| | MECHANICAL PERMIT APPLICATION FOR THESE |
| | SYSTEMS PRIOR TO ANY WORK BEING DONE ON |
| | THEM. |