| Date |
Text |
| 2001-03-30 00:00:00 | BUILDING PLAN REVIEW |
| | PERMIT# 00100684 |
| | 460 S ROSEMARY AV # 184 |
| | CONT: ? L. DAVIS OR SCHIAPPA |
| | |
| | 1)- DETERMINE WHO IS GOING TO BE THE |
| | CONTRACTOR OF RECORD, IF SCHIAPPA CONST |
| | IS TO BE THE CONTRACTOR OF RECORD, THEY |
| | ARE REQUIRED TO RECEIVE A NOTIRIZED |
| | LETTER FROM L. DAVIS CO. INC., THE |
| | QUALIFIER OF THE COMPANY IS TRANSFERRING |
| | PERMIT, PLANS & FEES. THERE IS A $100.00 |
| | TRANSFER FEE. SCHIAPPA CONSTRUCTION IS |
| | TO FINISH FILLING OUT THEIR APPLICATION. |
| | |
| | 2)- STOREFRONT ASSEMBLY: SBC 1606.4/ |
| | 1707.4.1: REQUIRE TESTING FOR WIND AS |
| | WELL AS LARGE MISSLE IMPACT RESISTANT |
| | TESTING. |
| | A)- SBC 1707.4 (WIND) A 10 SECOND TEST |
| | WITH THE LOAD EQUAL TO 1.5 THE DESIGN |
| | LOAD. |
| | B)- SBC 1606.4.1 AMEND. IMPACT FROM |
| | WINDBORN DEBRIS: GLAZED UNITS REQUIRE |
| | APPROVED TESTING FOR LARGE MISSLE IMPACT |
| | RESISTANCE OR STORM SHUTTERS WITH |
| | APPROVAL FROM SBCCI OR DADE COUNTY PRO- |
| | DUCT APPROVAL. |
| | |
| | 3)- SBC 104.2.2:ADDITIONAL INFORMATION |
| | REQUIRED: SHEET A-4 DETAIL "A" NOTES |
| | MMETAL STUD FRAMING SEE DETAIL 2, THIS |
| | SHEET? NO DETAIL! REQUIREMENTS FOR FAST- |
| | ENING THE TOP TRACK TO THE STRUCTURE |
| | ABOVE, STUD SPACING, SPAN, ETC? |
| | |
| | 4)- SHEET A-5 CLARIFY THAT THE GLASS |
| | SHELVING DETAIL SEC."C" WILL NOT BE LET |
| | INTO THE TENANT SEPERATION WALL. |
| | |
| | BUILDING PLAN REVIEW |
| | JIM WITMER |
| | (561) 659 -8096 EX 8412 |