| Date |
Text |
| 2001-01-08 00:00:00 | |
| | |
| | **************BUILDING UNSAT************ |
| | |
| | SBC 104.2.2 |
| | |
| | 1)PROVIDE**2**CURRENT COMPLETE COPIES OF |
| | SBCCI OR METRO DADE PRODUCT APPROVALS |
| | FOR: |
| | ALL EXTERIOR DOORS AND WINDOWS |
| | MULLIONS |
| | TRANSOMS |
| | ROOF COVERING UNDER SEPARATE PERMIT |
| | STORM PANELS FOR ALL NON IMPACT GLASS |
| | |
| | 2)PROVIDE COMPLETE ENERGY CALCULATIONS |
| | WITH MANUEL J FORM AND OWNER/AGENT |
| | SIGNATURE. |
| | |
| | 3)PROVIDE NOTES THAT REFERENCE 1997 SBC |
| | SFBC NOT APPLICABLE ON PAGE T-1 |
| | |
| | 4)PROVIDE PNEUMATIC FASTENER LEGEND ON |
| | A-6 THAT DOES NOT REFERENCE SFBC. |
| | |
| | 5)PROVIDE DETAILS FOR NEW FRONT DOORS. |
| | |
| | 6)PROVIDE FLOOD ZONE ELEVATION |
| | CERTIFICATE. |
| | |
| | 7)PROVIDE SOIL REPORT. |
| | |
| | 8)PROVIDE DETAIL OF FRAMING SUPPORTING |
| | AHU IN ATTIC. |
| | |
| | 9)PROVIDE RAISE SEAL AND SIGNATURE OF |
| | ENGINEER ON BOTH COPIES OF 2 FLOOR |
| | FRAMING PLAN. |
| | |
| | 10)PROVIDE DETAIL OF ATTIC VENTING WITH |
| | CALCULATIONS THAT COMPLIES WITH SBC |
| | 2309.7 |
| | |
| | 11)WALL SECTION ON PAGE D-1 SHOWS 4' |
| | OF CONCRETE FOR FOOTING? REVISE |
| | |
| | 12)BEFORE A PERMIT TO CONSTRUCT CAN BE |
| | ISSUED, IMPACT FEES MUST BE PAID TO PALM |
| | BEACH CO.,THE PERMIT PLANS STAMPED BY |
| | THEM AND THE RECEIPT ATTACHED TO THE |
| | PERMIT APPLICATION. |