| 2001-01-08 00:00:00 | *************** UNSAT ****************** |
| | |
| | 1)NOTE: PLEASE SHOW CLARIFICATION OF NEW |
| | PANEL BEING INSTALLED. YOU SHOW MLO AND |
| | 60A ? IS THIS GOING TO HAVE A 60 AMP |
| | BRKER FOR THE MAIN? IF NOT THEN A MAIN |
| | IS REQ`D AT DETACHED STRUCTURE. |
| | |
| | 2)NOTE: PLEASE SHOW GROUNDING ATTACHMENT |
| | AT THE DETACHED STRUCTURE. BLDG/SLAB |
| | STEEL AND COLD WATER BOND. PER 250-50 |
| | |
| | 3)NOTE: PLEASE SEE CONDUCTOR SIZE SHOWN |
| | AS EXISTING FOR 200AMP SERVICE??? #1 IS |
| | NOT LARGE ENOUGH FOR 200A SERVICE. |
| | PLEASE SUBMIT CLARIFICATION. IF #1 THEN |
| | MAIN SERVICE CONDUCTORS WILL BE REQ`D TO |
| | BE BROUGHT UP TO CODE. |
| | |
| | 4)NOTE: PLEASE SEE NFPA-72 2-2.1.1.1 |
| | SMOKE DETECTORS ARE REQ`D INSIDE AND |
| | OUTSIDE ASLL SLEEPING ROOMS.THIS INCLUDE |
| | -S CABANA, AS IT HAS A CLOSET AND BATH |
| | FOR SLEEPING ROOM CONVERSION. |
| | ALL MUST BE WIRED INLINE. |
| | |
| | 5)NOTE; PLEASE PROVIDE PANEL SCHEDULES |
| | FOR EXISTING AND NEW PANEL. PLEASE LIST |
| | THE REQ`D BATH(S) CIRCUIT(S) PER 210-52D |
| | AND 210-11-C-3. MUST BE #12 AWG AND 20A. |
| | |
| | 6)NOTE: PLEASE NOET MISSING OUTLET FOR |
| | NEW SECOUND FLOOR BATH REQ`D BY 210-52D |
| | |
| | 7)(NOTE: PLEASE NOTE MISSING EGRESS |
| | LIGHT REQ`D FOR CABANA PER 210-70. |
| | |
| | 8)NOTE: PLEASE NOTE ELECTRICAL PANEL |
| | SHOWN IN CABANA CLOSET. THIS IS NOT |
| | PERMITTED IN CLOSET SPACE PER 110-26F |
| | AND 384-7 FOR ELECTRICAL EQUIPMENT BEING |
| | INSTALLED AROUND IGNITABLE MATERIALS. |
| | |
| | 9)NOTE: PLEASE CLARIFY 240/1%%C SHOWN ON |
| | BOTTOM OF LOAD CALCULATIONS. (TYPE-O)??? |
| | |
| | 10)NOTE: SPACE HEATER SHOWN ON LOAD |
| | CALCULATIONS FOR CABANA? NOT SHOWN ON |
| | ELECTRICAL FLOOR PLAN???? PLEASE CALRIFY |
| | |
| | |
| | PLEASE SUBMIT ALL THE ABOVE INFORMATION |
| | FOR REVIEW. IF THEREARE ANY QUESITONS |
| | PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |