| Plan Review Notes For Permit 00080910 |
| Permit Number |
00080910 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2001-01-08 00:00:00 | DENIED | | | RESUB | | | | | | 1)PROVIDE 2 CURRENT COPIES OF METRO-DADE | | | OR SBCCI PRODUCT APPROVALS FOR ROOF | | | COVERING MATERIAL, EXTERIOR DOORS AND | | | WINDOWS THAT WILL BE INSTALLED ON NEW | | | ADDITION. | | | | | | 2)PROVIDE PRODUCT APPROVALS, KEY PLAN | | | AND INSTALLATION SCHEDULE WITH TYPE OF | | | ANCHORS BEING USED OR APPLY UNDER A | | | SEPARATE PERMIT. | | | | | | 3)HAVE OWNER OR THEIR AGENT (CONTRACTOR) | | | SIGN THE ENERGY FORMS. | | | | | | 4)HAVE THE ARCHITECT HAND SIGN EACH PAGE | | | OF THE PLANS. | | | | | | 5)PROVIDE SAFETY GLASS IN BATHROOM | | | WINDOWS.97SBC 2405.2 | | | | | | 6)HAVE ARCHITECT CORRECT CHECK HELTA 20 | | | ON SHEET S-1. | | | | | | 7)HAVE DESIGNER OF RECORD PROVIDE | | | ADDITIONAL INFORMATION DETAILING THE | | | CONNECTION OF THE NEW ADDITION TO THE | | | EXISTING STRUCTURE AT FOOTINGS, WALL | | | AND TIE BEAM. |
|