| 2001-01-08 00:00:00 | CHECKLIST: |
| | 1-PAY IMPACT FEES TO PALM BEACH COUNTY |
| | AND BRING STAMPED DRAWINGS AND RECEIPT |
| | 2-LEFT SIDE ELEVATION EXCEEDS THE MAX. |
| | PERCENTAGE OF OPENINGS ALLOWED BY |
| | TABLE 600 OF SBC 1997. |
| | 3-PROVIDE ONE HOUR FIRE RATED ASSEMBLY |
| | AT ZERO LOT LINE. INCLUDING AREA AT |
| | TRANSITION FROM CONCRETE BLOCK TO WOOD |
| | FRAMING. THE FIRE RESISTANCE FOR |
| | EXTERIOR WALLS AT ZERO LOT LINE SHALL |
| | BE UPON BOTH INTERIOR & EXTERIOR FIRE |
| | EXPOSURE. TABLE 600, NOTE I. SBC/97 |
| | ALSO, SEE SECTION 709.6.2.2 SBC 1997. |
| | 4-SURVEY TO BE SIGNED, SEALED AND DATED |
| | CHAPTER 471 FLORIDA STATUTES. |
| | 5-PROVIDE SOIL TEST REPORT PERFORMED AS |
| | PER SECTION 1804.2.7.2 OF CITY |
| | AMENDMENTS. |
| | 6-ARCHITECTURAL DRAWINGS NEED ORIGINAL |
| | SIGNATURE. CHAPTER 481 FL. STATUTES. |
| | 7-GENERAL NOTES SHEET TO BE UPDATE AS |
| | REQUIRED. CITY OF WEST PALM BEACH HAS |
| | ADOPTED THE SBC 1997 AND FLORIDA |
| | ENERGY EFFICIENCY CODE FOR BUILDING |
| | CONSTRUCTION, 1997 EDITION. REVIEW ALL |
| | DIVISIONS (EG: CONCRETE, MASONRY, ETC) |
| | AND REFERENCE THE APPROPRIATE STANDARD |
| | ACCORDING TO SBC AND THE ENERGY CODE |
| | RESPECTIVELY. |
| | 8-COMPLETELY SPECIFY CEILING CONSTRUCT'N |
| | AT ENTRY AND REAR PORCHES. INCLUDING |
| | FASTENERS TYPE AND SPACING. SECTION |
| | 2504.2 SBC 1997. |
| | 9-ATTIC ACCESS IN MASTER BEDROOM CLOSET |
| | TO BE 22"X36" MIN. SEC. 2309.6 SBC/97. |
| | SPECIFY SIZE FOR SECOND FLOOR ROOF. |
| | 10-PROVIDE DRAFSTOPPING AT SECOND FLOOR |
| | FRAMING PLAN. SPECIFY LOCATION AND |
| | TYPE OF MATERIAL. SEC. 2305.2.2 SBC/97 |
| | 11-REVISE THE DESIGN CERTIFICATION FOR |
| | BUILDING CODE COMPLIANCE FORM: |
| | -IMPORTANCE FACTOR IS INCORRECT. SEE |
| | TABLE 1606 SBC 1997. |
| | -BASIC VELOCITY PRESSURE IS INCORRECT. |
| | SEE TABLE 1606.2A SBC 1997. |
| | -FORM IS NOT LEGIBLE. |
| | 12-PROVIDE PRODUCT APPROVAL FOR: |
| | -ENTRY DOUBLE DOORS. |
| | -HORIZONTAL SLIDERS (MISSING DRAWINGS). |
| | -SLIDING GLASS DOORS (LEGIBLE DRAWINGS) |
| | -ARCHED WINDOWS (LEGIBLE DRAWINGS). |
| | -WINDOW MULLIONS (NOTE: TO BE USED WITH |
| | WINDOWS W/ CURRENT PRODUCT APPROVAL). |
| | -ONE HOUR FIRE RATED GLASS BLOCK. |
| | 13-PROVIDE BUCK DETAILS SHOWING 2X SIZE |
| | OF BUCK. SEE PRODUCT APPROVAL FOR |
| | FIXED AND ARCHED WINDOWS. |
| | 14-SEE PLANS FOR ADDITIONAL COMMENTS. |
| | INCLUDING THOSE BY THE OTHER TRADES. |
| | 15-STORM PANELS: |
| | -SPECIFY ANCHORS FOR WOOD FRAMING. |
| | -WHAT'S AN ANCHOR D?. |
| | -HIGHLIGHT SPECIFIC MOUNTING CONDITIONS |
| | ON PAGE 2 OF 5. |
| | |
| | NOTES: |
| | |
| | 1-CONTRACTOR NEEDS TO UPDATE LICENSE. |
| | PLEASE CONTACT MICHELLE MCLEAN AT |
| | 659-8096 EXT. 8242 OR ANGIE NEIL AT |
| | EXT. 8289 FOR INFORMATION REQUIRED. |
| | 2-VALUE DECLARED ON THE APPLICATION WAS |
| | TOO LOW. THIS VALUE WILL BE ADJUSTED |
| | AND ADDITIONAL FEES WILL BE DUE, |
| | INCLUDING RADON FEES. |
| | 3-PLEASE RETURN REVIEWED SET OF DRAWINGS |
| | IN ORDER TO EXPEDITE THE REVIEW |
| | PROCESS. |