| Date |
Text |
| 2001-01-08 00:00:00 | CHECKLIST: |
| | |
| | 1-ARCHITECT DIDN'T SIGN, SEAL AND DATED |
| | THE DRAWINGS. CHAPTER 481 FL. STATUTES |
| | |
| | 2-PROVIDE REVISED ENERGY CALCULATIONS. |
| | |
| | 3-NEW ELEVATOR: |
| | -PROVIDE COMPLETE SECTION DETAIL THRU |
| | ELEVATOR SHAFT. SECTION 104.2.2 OF |
| | CITY AMENDMENTS TO SBC 1997. |
| | -PROVIDE COMPLETE SPECIFICATIONS FOR |
| | ELEVATOR CONFORMING TO ANSI/ASME A17.1 |
| | |
| | 4-SPECIFY NUMBER OF CEILING FANS AS |
| | REQUIRED BY TABLE 6-6 FLORIDA ENERGY |
| | EFFICIENCY CODE FOR BUILDING CONST., |
| | 1997 EDITION. SEE COMMENTS ON PLANS. |
| | |
| | 5-CORRECT AREA TABULATIONS AS REQUIRED |
| | WITH NEW ENCLOSED AREA. SEE SHEET R1. |
| | |
| | 6-SECOND FLOOR WINDOWS AT MASTER BEDRM |
| | DON'T COMPLY WITH EGRESS REQUIREMENTS |
| | SECTION 1005.4.4 SBC 1997. REVISE |
| | WINDOW SCHEDULE AS REQUIRED. |
| | |
| | 7-SEE COMMENTS ON PLANS. INCLUDING |
| | COMMENTS BY THE OTHER TRADES. |
| | |
| | 8-SECTION THRU NEW STAIRS SHOW HEADROOM |
| | CLEARANCE OF 6'-3" +/-.IT IS NOT |
| | ALLOWED. MIN. HEADROOM CLEARANCE IS |
| | 6'-8" AS PER SECTION 1007.7 SBC 1997. |
| | REVISE STAIRS AS REQUIRED. |
| | |
| | 9-NEED TO OBTAIN A PERMIT FOR MECHANICAL |
| | WORK. THERE IS NONE APPLIED FOR. |
| | |
| | 10-ADDITIONAL FEES OF $101.00 ARE DUE |
| | FOR REVISION UPGRADES. ADDITIONAL |
| | CONSTRUCTION. |
| | |
| | |
| | NOTES: |
| | -IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ AT 659-8096 EXT. 8232. |
| | -PLEASE RETURN REVIEWED SET AFTER |
| | CORRECTIONS ARE DONE TO ORIGINAL DWGS |
| | IN ORDER TO EXPEDITE THE REVIEW. |