| Date |
Text |
| 2001-01-08 00:00:00 | SECOND CHECKLIST: |
| | (SAME ITEMS REQUESTED ON 1ST CHECKLIST) |
| | |
| | 1-PAY IMPACT FEES TO PALM BEACH COUNTY. |
| | BRING RECEIPT AND STAMPED DRAWINGS. |
| | 2-REVISE LOAD REQUIREMENTS FOR ATTIC |
| | STORAGE. 30 PSF LIVE LOAD. SEE TABLE |
| | 1604.1 SBC 1997. |
| | 3-PROVIDE SAFETY GLASS AT FAMILY ROOM, |
| | LIVING ROOM AND MASTER BATH. SEE PLANS |
| | AND SECTION 2405.2 SBC 1997. |
| | 4-PROVIDE COMPLETE AHU HANGING DETAILS. |
| | INCLUDE FASTENERS TYPES AND SIZES. |
| | DETAIL SHOWN ON SHEET A5 DOESN'T APPLY |
| | 5-PROVIDE COMPLETE SPECIFICATIONS/DETAIL |
| | FOR CEILING CONSTRUCTION AT ENTRY AND |
| | REAR PORCHES. INCLUDE FASTENER TYPES |
| | AND SPACING. SECTION 2504 SBC 1997. |
| | 6-FOOTING F2 TO HAVE 16" MINIMUM DEPTH |
| | AS PER SECTION 1804.1.9 OF CITY |
| | AMENDMENTS AND SEC 1804.1.3 SBC 1997. |
| | 7-ROOF FRAMING PLAN: SOME TRUSS GIRDERS |
| | ARE SHOWN WITHOUT A SUPPORTING POST TO |
| | TRANSFER THE LOAD TO THE FOOTING. |
| | SPECIFY POSTS AND TOP AND BOTTOM |
| | CONNECTORS. ALSO, VERIFY IF CONCRETE |
| | PAD WILL BE REQUIRED TO SUPPORT THE |
| | LOAD. SEC 104.2.2 CITY AMENDMENTS. |
| | 8-PROVIDE DETAIL/SPECS SHOWING HOW ARE |
| | OPENINGS DESIGNED TO RECEIVE STORM |
| | PANELS. DRAWINGS SHOW PRECAST LINTELS, |
| | BUT WHAT ABOUT WINDOW SILLS? |
| | THIS WILL DETERMINE THE TYPE OF ANCHOR |
| | AND SPACING REQUIRED TO INSTALL THE |
| | STORM PANEL. |
| | 9-PROVIDE COMPLETE CONSTRUCTION DETAILS |
| | FOR ARCHED OPENINGS. |
| | SECTION 104.2.2 CITY AMENDMENTS. |
| | 10-REVISE SOIL TEST REPORT. WE FOLLOW |
| | THE 1997 SBC, NOT 1994. |
| | -ALSO, PROVIDE COPIES OF THE TESTS |
| | PERFORMED AS PER TABLE 1804.2.7.3 OF |
| | CITY AMENDMENTS. |
| | 11-PROVIDE COMPLETE BUCK DETAILS FOR |
| | INSTALLATION OF DOORS AND WINDOWS. |
| | INCLUDING THE STRUCTURAL BUCK DETAIL |
| | TO SUPPORT THE GARAGE DOORS AND THE |
| | POCKET TYPE SLIDING GLASS DOORS. |
| | NOTE: SEE PRODUCT APPROVALS FOR THE |
| | SIZE OF BUCK REQUIRED. |
| | 12-STORM PANELS: |
| | -PROVIDE COMPLETE INFORMATION FOR THE |
| | INSTALLATION OF STORM PANELS,INCLUDING |
| | PRODUCT APPROVAL, ATTACHED SAMPLE OF |
| | INSTALLATION SCHEDULE AND KEY PLAN AND |
| | PROPER IDENTIFICATION OF MOUNTING |
| | CONDITIONS AND ANCHORS TO BE USED. |
| | NOTE:THIS INFORMATION MAY BE SUBMITTED |
| | LATER UNDER A SEPARATE APPLICATION. |
| | 13-PROVIDE CURRENT PRODUCT APPROVAL FOR: |
| | -BUTT GLAZING SYSTEM AS SHOWN ON PLANS. |
| | -POCKET SLIDING GLASS DOORS. |
| | -FIXED WINDOWS OF SIZES AS SHOWN LIVING |
| | ROOM AND FAMILY ROOM. |
| | -WINDOW MULLIONS. |
| | -ARCHED WINDOWS. |
| | -ENTRY DOORS. |
| | 14-SEE ADDITIONAL COMMENTS ON PLANS, |
| | INCLUDING COMMENTS BY THE OTHER TRADES |
| | 15-HIGHLIGHT FASTENING METHOD AND SYSTEM |
| | TO BE USED IN ROOF TILE PRODUCT |
| | APPROVAL. |
| | 16-APPLICATION FOR PERMIT MUST BE FILLED |
| | COMPLETELY AND SIGNED BY THOSE SUBS |
| | WHO APPLY IN THE ORIGINAL APPLICATION. |
| | 17-GENERAL CONTRACTOR TO UPDATE LICENSE |
| | AND INSURANCE. |
| | |
| | NOTES: |
| | -IT LOOKS LIKE THE ARCHITECT REVIEWED |
| | OUR MARKED SET AND EVEN MADE SOME |
| | COMMENTS. BUT, UNFORTUNATELY THE SETS |
| | THAT WERE RE-SUBMITTED AREN'T THE |
| | REVISED ONES. PLEASE RE-SUBMIT THOSE |
| | DRAWINGS AND DON'T FORGET TO INCLUDE |
| | THIS MARKED SET IN ORDER TO EXPEDITE |
| | THE REVIEW PROCESS. |
| | -IF YOU HAVE ANY QUESTIONS, PLEASE FEEL |
| | FREE TO CONTACT JULIO GOMEZ AT 659-8096 |