| Date |
Text |
| 2001-01-08 00:00:00 | SUBMIT THE FOLLOWING INFORMATION FOR | | | THE GAS INSTALLATION: | | | 1)SUBMIT A COPY OF/OR REFERENCE THE | | | APPLICABLE GAS SIZING TABLE USED IN THE | | | SIZING OF THE GAS SYSTEM.SGC 305.4. | | | | | | 2)SHOW ALL CUT SECTIONS OF PIPE,TYPE OF | | | PIPING MATERIAL,PIPE SIZES,TYPE OF GAS, | | | | | | 3)DISTANCE TO MOST REMOTE OUTLET. | | | | | | 4)DELIVERY PSI | | | | | | 5)CALCULATIONS FOR COMBUSTION AIR PER | | | NFPA 54 SEC.5.3.5 AND SGC SEC.402.4. | | | | | | 6)DELIVERY PSI. | | | | | | 7)TYPE LOCATION AND SIZE OF GAS VENTS. | | | | | | 8)MANUF.SHEETS FOR ALL GAS EQUIPMENT. | | | | | | 2)ONE MAIN VENT THRU ROOF IS REQD.PER | | | SPC SEC.904.3.1. | | | | | | 3)RISER S/1-WATER CLOSETS NOT PERMITTED | | | ON WET VENTS PER COUNTYWIDE AMENDMENTS | | | SEC.911.1.1. | | | | | | 4)RISER S/1-DRY VENTS ARE NOT PERMITTED | | | PER SPC SEC.906.2.1. | | | | | | 5)RISER S/2-ONE MAIN VENT THRU ROOF IS | | | REQD.PER SPC SEC.904.3.1. | | | | | | 6)SHT.P100-GAS LINE FOR UNIT 1634 SHOWS | | | A 3/4"LINE SUPPLYING A 1 1/2" LINE. | | | COMPLY W/SGC SEC.305.4. | | | | | | 7)SIZE THE WATER RISERS. | | | | | | 8)WATER HEATERS SHALL BE READILY ACESS- | | | IBLE PER SPC SEC.501.7. | | | | | | 9)THE APPLICABLE PLUMBING CODE IS THE | | | 1994 EDITION,NOT THE 1995. |
|