| Date |
Text |
| 2001-01-08 00:00:00 | 1)SHT.A0-THE APPLICABLE PLUMBING CODE |
| | IS THE 1994 EDITION OF THE STANDARD |
| | PLUMBING CODE,NOT 1997. |
| | |
| | 2)SHOW THE CLEAR INSIDE DIMENSIONS(LXW) |
| | OF THE HANDICAP STALLS.COMPLY W/FACBC |
| | SEC.4.17.3,& FIG.30. |
| | |
| | 3)SUBMIT CALCULATIONS FOR COMBUSTION AIR |
| | FOR THE WATER HEATERS.SGC SEC.402.4., |
| | 402.4.4. |
| | |
| | 4)SUBMIT DETAIL OF GAS VENT.SHOW TYPE, |
| | TERMINATION AND SIZE.SEE ATTACHED REQS. |
| | SUBMIT DETAILS FOR THE AIR INTAKE AND |
| | EXHAUST SYSTEMS FOR THE WATER HEATERS. |
| | COMPLY W/SGC CHAPT.6.SEE SHT.P-3. |
| | |
| | 5)CONTROLS FOR GAS EQUIPMENT SHALL |
| | COMPLY W/NFPA 5.5.4.,SGC SEC.310.1.A |
| | MANUAL SHUT-OFF VALVE AND UNION SHALL BE |
| | INSTALLED AT CONTROLS FOR REMOVAL AND |
| | REPLACEMENT.VALVES SHALL BE LOCATED |
| | BELOW CEILING. |
| | |
| | 6)WATER SUPPLY CONTROL SHALL COMPLY W/ |
| | SPC SEC.610.4.2.(S.O.V.IS REQD.ON WATER |
| | SUPPLY BRANCH FROM MAIN.) |
| | |
| | 7)CONTACT R.COMPO W/CITY OF WPB |
| | UTILITIES FOR CHANGES TO THE GREASY |
| | WASTE SYSTEM.(SUBMIT APPROVAL FROM |
| | UTILITIES FOR GREASE TRAP.) |
| | |
| | 8)A FLOOR SINK IN LIEU OF THE FLOOR |
| | DRAIN SHALL BE INSTALLED TO RECEIVE THE |
| | DISCHARGE FROM THE P & T VALVE FROM THE |
| | WATER HEATER.SPC SEC.804.1,807.1.3. |
| | |
| | 9)A VACUUM RELIEF VALVE IS REQD.ON |
| | BOTTOM FED WATER HEATERS PER SPC.507.1.2 |
| | |
| | 10)SHT.P-4-NOT MORE THAN 2 FIXTURES |
| | SHALL BE SUPPLIED BY 1/2" CW LINE. |
| | COUNTYWIDE AMENDMENTS TO SPC SEC.607.7. |
| | |
| | 11)SHT.P-4-THE APPLICABLE GAS CODE IN |
| | EFFECT IN THE CITY OF WPB IS THE 1997 |
| | STANDARD GAS CODE,NOT HTE 1994 EDITION. |
| | |
| | 12)SHT.P-4-CLARIFY PSI FOR THE GAS |
| | SYSTEM.PLANS NOTE 25 PS1.THIS CANNOT BE |
| | CORRECT AS DESIGNED.COUNTYWIDE AMENDMENT |
| | TO SPC SEC.104.2.1. |
| | |
| | 13)DISCHARGE OF EFFLUENT TO SANITARY |
| | SYSTEM SHALL NOT EXCEED 140 DEGREES |
| | UNLESS PROPER COOLING METHODS ARE |
| | INCORPORATED.SPC SEC.717.8. |
| | |
| | 14.)DISHWASHER CANNOT DISCHARGE TO THE |
| | GREASY WASTE SYSTEM PER LOCAL ORDINANCE. |
| | DISCHARGE SHALL BE TO THE SANITARY |
| | SYSTEM. |
| | |
| | 15)SHT.A-8-MEN'S TOILET ROOM-THE DOOR ON |
| | THE HANDICAP STALL SHALL NOT SWING INTO |
| | THE CLEAR FLOOR SPACE REQD.FOR THE LAV. |
| | COMPLY W/FACBC SEC.4.22.2.(SEE SHT.P-2 |
| | ALSO). |
| | |
| | 16)SIZE THE GAS LINES TO THE APPLIANCE. |
| | COMPLY W/TABLE 305.4(A). |
| | |
| | 18)SUBMIT MANUF.SHEETS FOR GAS EQUIPMENT |
| | EQUIPMENT SHALL BE LISTED PER SGC SEC. |
| | 402.1. |
| | |
| | CALL 561-659-8096,EXT.8377 IF YOU HAVE |
| | ANY QUESTIONS. |
| | TIMOTHY LARGE |
| | PLUMBING PLANS EXAMINER. |