| 2001-01-08 00:00:00 | *****************PROVISO**************** | | | | | | 1)DETAILS AND CALCULATIONS SHALL BE | | | SUBMITTED FOR SECONDARY ROOF DRAINAGE | | | SYSTEM.COMPLY W/SPC SECX.1109.1-1109.3 | | | AND APPENDIX"A".INCLUDE 1/2 THE AREA OF | | | THE PARAPET WALL PER SPC SEC.1108.3. | | | SHOW THE CALCULATIONS PER THE ABOVE | | | NOTED CODE SECTIONS AND SIZE THE | | | SCUPPERS ACCORDINGLY.THE SCUPPERS FOR | | | THE HIGH ROOF ARE DRAINING ONTO THE LOW | | | ROOF.WHERE IS THE SECONDARY DRAINAGE | | | FOR THE LOW ROOF?PROVIDE CALCULATIONS | | | THAT THE 2-4" ROOF DRAINS WILL HANDLE | | | THE ADDITIONAL LOAD.PLANS SHALL BE | | | SUBMITTED FOR REVIEW WITHIN 7 DAYS. |
|