| 2001-01-08 00:00:00 | SECOND CHECKLIST: |
| | 1-PERCENTAGE OF OPENINGS ALLOWED BY |
| | TABLE 600 OF SBC 1997 ISEXCEEDED AT |
| | RIGHT ELEVATION. DWGS WERE NOT REVISED |
| | 2-DETAIL/SECTION AT COLUMN C8 IS |
| | INCOMPLETE. IT DOESN'T SPECIFY BOTTOM |
| | PLATE AND ANCHORS. |
| | SECTION 104.2.2 CITY AMENDMENTS. |
| | 3-PROVIDE A COMPLETE WALL SECTION AT TWO |
| | STORY CBS WALL. INCLUDE DETAIL/SPECS |
| | OF HOW IS SECOND FLOOR FRAMING |
| | ANCHORED TO THIS WALL. SECTION 104.2.2 |
| | CITY AMENDMENTS TO SBC 1997. |
| | 4-PROVIDE SAFETY GLASS AT BEDROOM #4. |
| | SECTION 2405.2 SBC 1997. |
| | 5-STAIRS SECTION/DETAIL: |
| | -NOT ENOUGH INFORMATION IS GIVEN TO |
| | DETERMINE THE STAIRWAY CONSTRUCTION AS |
| | PER SECTION 1007 OF SBC 1997. |
| | -INDICATE FIREBLOCKING. SEC 2305 SBC/97 |
| | -TREAD AND RISER RATIO DOESN'T COMPLY |
| | WITH SECTION 1007.3 SBC 1997. |
| | 6-SPECIFY DRAFSTOPPING TYPE AND LOCATION |
| | AT SECOND FLOOR FRAMING PLAN. SECTION |
| | 2305.2.2 SBC 1997. |
| | 7-STORM PANELS: |
| | -INSTALLATION SCHEDULE IS INCORRECT. |
| | ANCHOR SPECIFIED IS FOR CONCRETE OR |
| | MASONRY INSTALLATION ONLY. WHAT ABOUT |
| | SECOND FLOOR WOOD FRAMED WALLS? |
| | REVISE TYPE AND SPACING OF ANCHOR AS |
| | REQUIRED. |
| | -PROVIDE AN UPDATED PRODUCT APPROVAL. |
| | 8-PROVIDE SPECIFICATIONS/DETAILS FOR |
| | CEILING CONSTRUCTION AT ENTRY AND REAR |
| | PORCHES. SPECIFY ANCHOR TYPES AND |
| | SPACING. SECTION 2504 SBC 1997. |
| | 9-PROVIDE PRODUCT APPROVALS FOR TWO HOUR |
| | FIRE RATED CONCRETE BLOCK, WINDOW |
| | MULLIONS, OVAL WINDOW, ROOF TILE AND |
| | SLIDING GLASS DOORS. |