| 2001-01-08 00:00:00 | 1) PROVIDE SEQUENCE OF OPERATION FOR |
| | STAIRWAY PRESSURIZATION. NOTE: |
| | ACCEPTANCE TEST PER NFPA 92A REQUIRED |
| | BY CERTIFIED TEST AND BALANCE COMPANY IN |
| | PRESSENCE OF CITY INSPECTORS |
| | 2) M101 SHOW RETURN AIR PATH FOR HP-1 |
| | 20 MIN. RATED DOOR, NO FIRE DAMPER SHOWN |
| | AT DUCT LEAVING ROOM WITH HP-1 |
| | 3) M101 DUCT PENETRATING VALET ROOM WALL |
| | TO HAVE FIRE DAMPER AT PENETRATION IF |
| | WALL IS RATED (DOOR IS RATED TO ROOM) |
| | 4) SHOW AIR BALANCE SCHEDULE AND AIR |
| | EXCHANGE CALCULATIONS FOR GARAGE AS |
| | REQUIRED BY CODE |
| | 5) M102 NO FIRE DAMPER SHOWN AT DUCT |
| | PENETRATION OF ELEVATOR VESTIBULE AREA |
| | 6) M107 ALL CHWSR RISERS IN GARAGE TO |
| | PROTECTED FROM DAMAGE |
| | 7) PROVIDE SPECS FOR DRYER BOOSTER FANS |
| | 8) DRYER EXHAUST DUCT TO BE RUN AS |
| | STRAIGHT AS POSSIBLE TO LIMIT 90 AND 45 |
| | DEGREE BENDS |
| | 9) SEVERAL BATH EXHAUST FANS (EF-A) HAVE |
| | NO DUCT SHOWN ATTACHED 1997 SMC 501.3 |
| | REQUIRES ALL EXHAUSTED AIR TO BE DIS- |
| | CHARGED OUTDOORS |
| | 10) NO DUCT RUNS SHOWN FOR LOFT DRYERS, |
| | PROVIDE INFORMATION ON PLAN |
| | 11) PROVIDE RATING/SPECS ON HOSES FOR |
| | HEAT PUMPS |
| | 12) OVERFLOW PROTECTION REQUIRED FOR ALL |
| | AHU AND HP (VERTICAL OR HORIZONTAL) PER |
| | 1997 SMC 304.8.6 |
| | 13) PROVIDE INFORMATION WHERE AUX DRAIN |
| | TERMINATES (NOT FOUND ON PLUMBING PLANS) |
| | 1997 SMC REQUIRES AUX DRAIN LINE TO TERM |
| | INATE IN A CONSPICUOUS LOCATION TO SERVE |
| | AS AN ALARM THAT THE REGULAR DRAIN IS |
| | RESTRICTED |
| | 14) PROVIDE INFORMATION ON LOCATION OF |
| | EXHAUST DUCT AND FAN LOCATION FOR FUTURE |
| | KITCHEN HOODS |