| 2001-01-08 00:00:00 | APPROVED WITH PROVISO: |
| | 1-FLOOD ZONE "AO". WILL NEED TO PROVIDE |
| | ELEVATION CERTIFICATE. |
| | 2-REVISE/UPDATE ALL ORIGINAL DRAWINGS |
| | SHOWING THE DESIGN PRESSURES FOR |
| | EXTERIOR OPENINGS AS CALCULATED BY THE |
| | PROFESSIONAL ENGINEER OF RECORD. SHOW |
| | CALCULATIONS. SEE PLANS FOR COMMENTS. |
| | ALSO, CLEARLY WRITE NAME, ADDRESS AND |
| | LICENSE NUMBER OF ENGINEER ON DRAWINGS |
| | 3-CLEARLY SPECIFY CEILING CONSTRUCTION |
| | AT FRONT AND BACK PORCHES. INCLUDING |
| | FASTENER TYPE AND SPACING. SECTION |
| | 2504 SBC 1997. |
| | 4-PRODUCT APPROVALS: |
| | -PROVIDE PRODUCT APPROVAL FOR DOUBLE |
| | ENTRY DOORS, WINDOW MULLIONS.PLEASE |
| | MAKE SURE DRAWINGS ARE LEGIBLE. |
| | 5-NORANDEX PRODUCT APPROVALS: |
| | -PROFESSIONAL ENGINEER OF RECORD TO |
| | WRITE SITE SPECIFIC LOCATION; SPECIFY |
| | WHICH PRODUCTS ARE TO BE USED IN THIS |
| | PROJECT; CLEARLY WRITE HIS NAME, |
| | ADDRESS AND LICENSE NUMBER AND SIGN, |
| | SEAL AND DATE THIS SITE SPECIFIC |
| | PRODUCT APPROVAL. |
| | -NOTE: NEED COPIES OF TESTS RESULTS FOR |
| | SLIDING GLASS DOORS AS PER ASTM |
| | E-330. (SEC. 1706 SBC 1997). |
| | 6-STORM PANELS: |
| | -PROVIDE A COMPLETE INSTALLATION SCHED. |
| | AND KEY PLAN (ONE SUBMITTED IS FOR |
| | ANOTHER MODEL) AND CLEARLY INDICATE |
| | MOUNTING METHOD TO BE USED; ANCHOR TO |
| | BE USED ACCORDING TO DESIGN PRESSURES |
| | (MEAN ROOF HEIGHT 15'-6" PLUS/MINUS), |
| | STORM PANEL SPAN, EDGE DISTANCE AND |
| | BUILDING CONSTRUCTION (MASONRY). |
| | 7-SOIL TEST REPORT NEEDS ORIGINAL |
| | SIGNATURE AND DATE WHEN DOCUMENT IS |
| | SEALED. |
| | |
| | NOTE: ALL ITEMS ON PROVISO TO BE |
| | RE-SUBMITTED TO THIS OFFICE PRIOR |
| | TO CONSTRUCTION OR INSTALLATION OF |
| | REFERENCED ITEMS. |