| Plan Review Notes For Permit 00030212 |
| Permit Number |
00030212 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2001-01-08 00:00:00 | CHECKLIST: | | | 1-TRUSS DRAWINGS: | | | | | | -CLARIFY WHY THERE ARE SOME DETAILS AND | | | LETTERS SEALED BY DIFFERENT ENGINEERS. | | | WHO'S THE ONE RESPONSIBLE FOR THE | | | DOCUMENT. | | | -WHY IS LETTER FROM SIMPSOM STRONG TIE | | | SEALED BY ANOTHER ENGINEER. | | | -UPDATE ALL GENERAL DETAILS AND LETTERS | | | USING SBC 1997 OR ASCE 7-95. | | | SIGNATURE AND DATE SHALL BE THE ONE | | | WHEN DOCUMENT IS SEALED. | | | 2-REVISE CONNECTORS FOR TRUSS FGT1 TO | | | RESIST THE LOADS CALCULATED BY THE | | | ENGINEER. | | | 3-LETTER FROM ROYAL PALM ALUMINUM | | | MANAGER OF ENGINEERING REFERING TO THE | | | ARCHITECTURAL WINDOWS TO BE SIGNED, | | | SEALED AND DATED. | | | | | | | | | NOTE: PLEASE SEE OTHER COMMENTS ON | | | PROVISO DATED 4-10-00. |
|