| Date |
Text |
| 2001-01-08 00:00:00 | 1)THE TOILET ROOM IN THE TMA SHOW ROOM |
| | AND THE RECEIVING TOILET ROOM SHALL BE |
| | HANDICAP ACCESSIBLE PER FACBC SEC. |
| | 4.1.3(11).CLEARLY SHOW COMPLIANCE ON THE |
| | PLANS.SHOW GRAB BAR HEIGHT,LOCATION, |
| | HEIGHT OF FIXTURES,CLEARANCES,ETC. |
| | COMPLY W/FACBC OCT.1997 ED. |
| | |
| | 2)WATER SUPPLY CONTROL SHALL COMPLY W/ |
| | SPC SEC610.4.2. |
| | |
| | 3)SIZE ALL WASTE,VENT AND WATER LINES ON |
| | THE DIAGRAM.COUNTYWIDE AMENDMENTS TO SPC |
| | SEC.104.2.1. |
| | |
| | 4)INDIRECT WASTES SHALL DISCHARGE INTO |
| | A FLOOR SINK,NOT FLOOR DRAIN.SPC SEC. |
| | 807.1. |
| | |
| | 5)A CHECK AND GATE VALVE ARE REQD.ON THE |
| | SUMPS DISCHARGE PER SPC SEC.717.2.SUMPS |
| | SHALL BE VENTED PER 717.6.CONNECTION TO |
| | DRAINAGE SYSTEM SHALL COMPLY W/SPC SEC. |
| | 717.11. |
| | |
| | 6)FLOOR DRAINS SHALL BE IN FULL VIEW AT |
| | ALL TIMES PER SPC SEC.409.4.1.2. |
| | |
| | 7)CONTACT R.COMPO W/CITY OF WPB CENTRAL |
| | WASTEWATER TREATMENT FACILITY REGARDING |
| | EFFLUENT FROM FILM PROCESSOR.SUBMIT |
| | APPROVAL OF SYSTEM W/O NEUTRALIZATION |
| | TANK FROM R.COMPO. |
| | |
| | 8)PHOTOLAB RISER-FIXTURES SHALL BE |
| | VENTED PER SPC 717.4. |
| | |
| | 9)AN AIR GAP IS REQD.ON THE RTU COND. |
| | DRAIN PIPING PER SPC SEC.806. |
| | |
| | |
| | CALL 561-659-8096,EXT.8377 IF YOU HAVE |
| | ANY QUESTIONS. |
| | TIMOTHY LARGE |
| | PLUMBING PLANS EXAMINER. |