| 2001-01-08 00:00:00 | CHECKLIST: |
| | 1-REVISE LOCATION OF KITCHEN RANGE TO |
| | COMPLY WITH THE CLEAR SPACE REQUIRED |
| | IN FRONT OF IT. SEESECTION 7A OF |
| | FAIR HOUSING ACT. |
| | 2-BATHROOM #2 AT UNIT MDL 1409 DOESN'T |
| | COMPLY WITH FAIR HOUSING ACT SEC. 7B: |
| | A)DOOR FROM BEDROOM #2 TO HAVE 32" MIN. |
| | CLEAR OPENING. |
| | B)LENGTH OF BATHROOM DOESN'T HAVE THE |
| | DIMENSION REQUIRED FOR A TYPE A BATH |
| | WHEN APPROACHED FROM THE BEDROOM. |
| | 3-SHOWER AT MASTER BATH TO COMPLY WITH |
| | THE CLEAR FLOOR SPACE REQUIRED. SEE |
| | FAIR HOUSING ACT SEC 7B. |
| | 4-OPTIONAL SLIDING GLASS DOORS AT MASTER |
| | BEDROOM TO HAVE 32" MIN. CLEAR OPENING |
| | 5-ENTRY DOOR SPACE TO COMPLY W/ANSI 4.13 |
| | 6-ROOF FRAMING PLAN AND TRUSS DRAWINGS: |
| | -CLARIFY CONSTRUCTION AT RIGHT AND LEFT |
| | ENDS OF BUILDING. TRUSS DRAWINGS SHOW |
| | BEARING WALLS, BUT ARCHITECTURAL DWGS |
| | DON'T. SEE PLANS FOR COMMENTS. |
| | -CLARIFY WHO REVIEW THE TRUSS DRAWINGS. |
| | STAMP SAYS "OUR OFFICE HAS REVIEW..." |
| | WHAT OFFICE IS THIS? |
| | -SEE TRUSS LAYOUT FOR MORE COMMENTS. |
| | -CLARIFY WHY THE MAIN TRUSSES RUNNING |
| | FROM FRONT TO BACK ARE DESIGNED |
| | WITHOUT THE RIDGE LINE. WHY IS THIS |
| | AREA TO BE DONE BY BUILDER?. |
| | -REVISE ENGINEERED TRUSSES SO THAT THEY |
| | CLEARLY MATCH THE ROOF TRUSS LAYOUT. |
| | -UPDATE ALL GENERAL TRUSS DETAILS. ASCE |
| | 7-95 AND SEAL (RAISED SEAL), DATE AND |
| | SIGN THEM. |
| | -ENGINEERED TRUSSES TO BE DESIGNED AS |
| | PER ASCE 7-95 FOR 145 MPH WIND, NOT AS |
| | ASCE 7-93 FOR 140 MPH WIND. ALSO ALL |
| | TRUSSES TO BE DESIGN AT THE SAME MEAN |
| | ROOF HEIGHT. |
| | -REVISE TRUSS ANCHOR SCHEDULE TO RESIST |
| | THE UPLIFT AND LATERAL LOADS SHOWN ON |
| | THE ENGINEERED TRUSSES. |
| | 7-PRODUCT APPROVALS: |
| | -PROVIDE PRODUCT APPROVAL FOR 2 HOUR |
| | CONCRETE BLOCK. |
| | -SLIDING GLASS DOORS AND WINDOW PRODUCT |
| | APPROVAL TO BE SIGNED, SEALED AND DATE |
| | BY THE PROFESSIONAL DESIGNER OF RECORD |
| | AND FILL IN THE SPECIFIC JOB LOCATION. |
| | 8-STORM PANELS: |
| | -PROVIDE A COMPLETE INSTALLATION SCHED. |
| | (AS PER CITY SAMPLE) AND KEY PLAN. |
| | ALSO, HIGHLIGHT SPECIFIC MOUNTING |
| | CONDITIONS AND ANCHOR SPACING. |
| | 9-ENERGY CALCULATIONS TO BE SIGNED AND |
| | DATED BY THE OWNER/AGENT. ALSO, REVISE |
| | THE OWNER INFORMATION ON TOP OF FORM. |
| | -# OF BEDROOMS ON UNIT 1527 IS 3, NOT |
| | 2. SEE FLOOR PLANS. REVISE AS REQUIRED |
| | 10-PROVIDE CALCULATIONS FOR ATTIC CROSS |
| | VENTILATION AT EACH UNIT.SBC/97 2309.7 |
| | NOTE: TAKE INTO ACCOUNT FIREPROOF DET. |
| | ON WALL SECTION 1 OF SHEET DT. |
| | 11-PROVIDE COMPLETE DETAIL AND SPECS FOR |
| | CEILING CONSTRUCTION AT FRONT AND BACK |
| | PORCHES OF EACH UNIT. INCLUDE FASTENER |
| | TYPE AND SPACING. SECTION 2504 SBC/97. |
| | 12- DRAWING #4:CLARIFY HOW DOES THE 2 HR |
| | "PARTY WALL" GOES TO THE BOTTOM OF |
| | ROOF SHEATHING IF THE BEAM HEIGHT IS |
| | 12'-11". SEE SECTIONS AND ELEVATIONS. |
| | 13-DETAIL SC-2: HOW DOES THIS DESIGN |
| | MAINTAINS THE STRUCTURAL STABILITY AND |
| | FIRE RESISTANCE IF THE MAIN GIRDER |
| | FAILS. SEC. 704.4.2(3) SBC 1997. |
| | 14-NEED TO HAVE A PERMIT APPLICATION FOR |
| | EACH TOWNHOUSE. |
| | NOTE: NO NEED FOR INDIVIDUAL DRAWINGS. |
| | 2 SETS SUBMITTED FOR ENTIRE BUILDING. |
| | 15-PAY $750 TO THE CITY OF WEST PALM BCH |
| | FOR WESTERN EXPANSION FEES FOR EACH |
| | TOWNHOUSE. |
| | 16-CONSTRUCTION VALUATION DECLARED IN |
| | THE APPLICATION IS TOO LOW. THE |
| | CALCULATED VALUE FOR EACH TOWNHOUSE IS |
| | AS FOLLOWS: |
| | $107,877 FOR MODEL 1409 AND |
| | $115,660 FOR MODEL 1527. THEREFORE, |
| | PERMIT FEES WILL NEED TO BE ADJUSTED |
| | FOR EACH PERMIT APPLICATION. |
| | 17-PROVIDE SAFETY GLASS AT AREAS MARKED |
| | ON PLANS. SECTION 2405.2 SBC 1997. |
| | 18-SEE ADDITIONAL COMMENTS MARKED ON THE |
| | PLANS AND PLEASE RETURN REVIEWED SET |
| | AFTER CORRECTIONS ARE DONE ON ORIGINAL |
| | DRAWINGS IN ORDER TO EXPEDITE THE |
| | REVIEW PROCESS. |