Plan Review Details - Permit 99121449
Plan Review Stops For Permit 99121449
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-08-02 Cont ID  
Sent By dpalmer Date 2000-08-02 Time 17:56 Rev Time 0.00
Received By dpalmer Date 2000-08-02 Time 17:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-08-08 Cont ID  
Sent By cthirben Date 2000-08-08 Time 11:56 Rev Time 1.00
Received By cthirben Date 2000-08-08 Time 11:54 Sent To  
Notes
2001-01-08 00:00:00PROVISO:
 PROVIDE EXHAUST FAN IN BATHROOMS ON 1ST
 FLOOR AS PER 1997 SMC 503.3.1....
 *REQUIRE SUPPLY AIR IN THE NOOK AREA....

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-08-02 Cont ID  
Sent By tlarge Date 2000-08-02 Time 06:20 Rev Time 0.30
Received By tlarge Date 2000-08-02 Time 06:14 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status F Date 2001-01-12 Cont ID  
Sent By jgomez Date 2001-01-12 Time 09:24 Rev Time 0.50
Received By jgomez Date 2001-01-12 Time 09:19 Sent To  
Notes
2001-01-12 00:00:00TRUSS DRAWINGS CHECKLIST:
 1-WHERE IS THE ENGINEERING FOR THE
 PARALAM BEAM?
 2-GENERAL DETAILS AND SPECS NEED TO BE
 COORDINATED AND UPDATED. DETAILS TOO
 OLD AND REFERENCING OLD CODES.
 -WHY IS ENGINEER SIGNING AND SEALING
 DOCUMENTS WITH THE NAME OF ANOTHER
 ENGINEER?
 -ENGINEER TO FOLLOW CHAPTER 471 FLORIDA
 STATUTES WHEN SUBMITTING DOCUMENTS FOR
 PUBLIC RECORDS.
 -ENGINEER TO DATE DOCUMENTS AT TIME OF
 SEALING THEM. FL STATUTES 471.
 3-SUPPORT REPORT INDICATES THAT TRUSSES
 WERE DESIGNED USING SBC 1991.
  
  
  
 JULIO GOMEZ, EXT. 8232.

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2000-08-29 Cont ID  
Sent By rmcdouga Date 2000-08-29 Time 10:46 Rev Time 2.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-01-08 00:00:00PROVISO
 PROVIDE FLOOD ELEVATION CERTIFICATE

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2000-08-10 Cont ID  
Sent By rmcdouga Date 2000-08-10 Time 10:20 Rev Time 3.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-01-08 00:00:00DENIED
  
 1)FLOOD ELEVATION CERTIFICATE WILL BE
 REQUIRED.
  
 2)SPECIFY WHICH ELEVATION,DRAWING A-4A
 OR A-4B,WILL BE USED.
  
 3)THE VALUES LISTED IN THE WIND PRESSURE
 SCHEDULES ON SHEETS A-4A AND A-4B DO NOT
 CORRESPOND WITH THE PRESSURES LISTED ON
 THE DRAWING FOR WINDOWS J,S & T ON A-4A
 AND J,R & S ON 4B. PLEASE CORRECT.
  
 4)GARAGE DOOR SPECIFICATIONS FOR 16'X 7'
 DOOR LISTS NEGATIVE DESIGN PRESSURE OF
 -33PSF ENGINEER HAS CALCULATED NEGATIVE
 DESIGN PRESSURE OF GARAGE DOOR ON
 STRUCTURE AT -34PSF. PROVIDE PRODUCT
 APPROVAL FOR GARAGE DOOR THAT IS DESIGN-
 ED TO WITHSTAND THE PRESSURES.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-06-20 Cont ID  
Sent By lsmith Date 2000-06-20 Time 15:41 Rev Time 0.50
Received By lsmith Date   Time   Sent To  
Notes
2001-01-08 00:00:00FAILED PER TM 6/19/00

Review Stop Z ZONING
Rev No 1 Status P Date 2000-02-10 Cont ID  
Sent By gjoyce Date 2000-02-10 Time 15:53 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***