Plan Review Details - Permit 99120664
Plan Review Stops For Permit 99120664
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2000-09-27 Cont ID  
Sent By jleahy Date 2000-09-27 Time 09:36 Rev Time 1.30
Received By jleahy Date 2000-09-27 Time 09:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-03-06 Cont ID  
Sent By dpalmer Date 2000-03-06 Time 10:23 Rev Time 0.00
Received By dpalmer Date 2000-03-06 Time 10:23 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2000-01-22 Cont ID  
Sent By dpalmer Date 2000-01-22 Time 09:53 Rev Time 0.00
Received By dpalmer Date 2000-01-22 Time 09:53 Sent To  
Notes
2001-01-08 00:00:00*************NO REVIEW ****************
  
 ELECTRICAL PLANS TO BE SUBMITTED WITH
 SEPARATE PERMIT APPLICATION,.

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2000-08-22 Cont ID  
Sent By mgonzale Date 2000-08-22 Time 14:19 Rev Time 1.00
Received By mgonzale Date   Time   Sent To  
Notes
2001-01-08 00:00:00PASSED -
 REVISIONS RESOLVING ALL ROW ISSUES
 OF HOME DEPOT, HANK AARON DRIVE AND
 CONGRESS AVENUE.

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2000-03-28 Cont ID  
Sent By dlauderm Date 2000-03-28 Time 10:49 Rev Time 2.00
Received By dlauderm Date 2000-03-28 Time 10:49 Sent To  
Notes
2001-01-08 00:00:00PASSED WITH PROVISOS:
 1.STREET LIGHTS ON THE EAST SIDE OF HANK
 AARON DRIVE NEED TO BE IN THE SHOPPING
 CENTER PROPERTY, NOT IN THE ROAD.
 CHANGE THE PLAN ACCORDANTLY.
  
 2.ALL LIGHTS ARE TO BE MAINTAINED BY
 THE ASSOCIATION AND NOT THE CITY.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By dlauderm Date 2000-03-28 Time 10:48 Sent To  
Notes
2001-01-08 00:00:00D. CONTINUED:
 A BLANK ROW PERMIT HAS
 BEEN ATTACHED FOR YOUR USE.
 3.FOR CLARIFICATION, THE NEW SANITARY
 MAIN IN PALM BEACH LAKES BOULEVARD, FROM
 THE EXISTING MANHOLE TO MANHOLE #11
 BELONGS TO THE CITY.FROM THERE ONTO
 THE SITE IT IS PRIVATE.
 4.ON HANK AARON DRIVE ALL OF THE
 SANITARY MAIN BELONGS TO THE CITY.
 5.THE IRRIGATION PLANS ARE NOT
 APPROVED FOR THE FOLLOWING REASONS:
 5A. YOU DO NOT HAVE PERMISSION TO PLACE
 IRRIGATION PUMP ON CITY PROPERTY (CANAL
 ROW) AND PUMP OUT OF OUR DRINKING WATER
 SUPPLY (LAKE).
 5B.SEE COMMENT B2.
 6.THE PLANS WERE NOT LOOKED AT FOR
 SIGNAGE, STRIPPING OR CONSTRUCTION ON
 THE PARKING LOTS.
 THE FOLLOWING ARE COMMENTS THAT RICHARD
 PITTMAN HAS MADE:
 THERMOPLASTIC PAVEMENT MARKINGS SHALL BE
 PLACED IN THE PUBLIC ROAD RIGHT-OF-WAYS.
 WHO OWNS AND MAINTAINS IRRIGATION PUMP
 NO. 3?
 DEVELOPER TO COORDINATE AND PAY FOR
 TRAFFIC SIGNAL ADJUSTMENTS.
 RAMPS FOR THE H/C REQUIRED AT
 INTERSECTIONS.
 STREET LIGHTS ARE NOT APPROVED AS THE
 PLAN SET DOES NOT INCLUDE THE PLANS AND
 DETAILS.
 THERE ARE TIMES WHEN THE GROUND WATER
 TABLE WILL BE CLOSE TO ELEVATION 14.5.
 THE TRUCK WELL WILL EXPERIENCE WATER AND
 THE SUMP PUMP SHOULD BE HEAVY DUTY.
 THE PUBLIC ROADWAYS SHALL BE CONSTRUCTED
 FROM EITHER 6" THICK ASPHALT BASE COURSE
 TYPE III OR 8" THICK LIME ROCK.THE USE
 OF COQUINA ROCK IS NOT APPROVED.
 ALL 4-WAY AND 3-WAY STOP INTERSECTION
 SHALL BE SIGNED 4-WAY OR 3-WAY.
 TYPE "F" CURB AND GUTTER SHALL BE USED
 ON HANK AARON DRIVE WHERE THERE ARE LONG
 STRETCHES WITHOUT PARKING ON THE SIDE.
 SEE SHEET IT HAS FIVE.
 EXPANSION AND CONTRACTION JOINTS IN CURB
 AND SIDEWALK SHALL BE INSTALLED PER FDOT
 REQUIREMENTS.
 PAGE R-I - SPELLING OF ASPHALTIC.
 THERE IS A DISCREPANCY ON PLANS
 REGARDING IRRIGATION PUMP STATION NO. 3.
 THE SOUTH TERMINUS OF HANK AARON DRIVE
 (STATION 30+10) SHOULD BE SIGNED 3 OR 4-
 WAY.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2000-02-09 Cont ID  
Sent By dlauderm Date 2000-02-09 Time 08:16 Rev Time 4.00
Received By dlauderm Date 2000-01-14 Time 10:03 Sent To  
Notes
2001-01-08 00:00:00PASSED WITH PROVISOS:
 1. PHASE II OF THE ROAD IS NOT APPROVED
 FOR CONSTRUCTION.SINCE THE WATER,
 SANITARY AND ROAD HAS NOT BEEN APPROVED
 THEY CAN NOT BE BUILT. SEE PAGE HA1,THRU
 HA7, HA-L1, AND HA-IR1 SERIES:
 2. THE PUBLIC ROADWAYS SHALL BE
 CONSTRUCTED FROM EITHER 6" THICK ASPHALT
 BASE COURSE TYPE III OR 8" THICK LIME
 ROCK.THE USE OF COQUINA ROCK IS NOT
 APPROVED.
 3. ALL 4-WAY AND 3-WAY STOP INTERSECTION
 SHALL BE SIGNED 4-WAY OR 3-WAY.
 4. TYPE "F" CURB AND GUTTER SHALL BE
 USED ON HANK AARON DRIVE WHERE THERE ARE
 LONG STRETCHES WITHOUT PARKING ON THE
 SIDE.
 5. EXPANSION AND CONTRACTION JOINTS IN
 CURB AND SIDEWALK SHALL BE INSTALLED PER
 FDOT REQUIREMENTS.
 6.STREET LIGHTS PLANS HAVE NOT BEEN
 FINALIZED AND ARE NOT PART OF THIS
 REVIEW.SUBMIT THEM FOR PLAN REVIEW
 WITH NUMBER 1.
 7. THE IRRIGATION SYSTEM AND LANDSCAPING
 WILL BE PRIVATELY MAINTAINED IN THE
 ROAD ROW.
 8. THE PRODUCT LIST ON PAGE C-11 IS NOT
 BELONGS TO THE CITY.FROM THERE ONTO
 APPROVED.SUBMIT SHOP DRAWINGS AT THESP
 TIME OF CONSTRUCTION.UTILITIES WILL
 ONLY APPROVE CITY OWNED MATERIALS.O THE
 9. HOME DEPOT SITE PLAN:NT MARKINGS SHAL
 A. WENDY'S, THE FUTURE FAST FOODPAY FOR
 RESTAURANT SOUTH OF WENDY'S (BOTH WEST
 SIDE OF HANK AARON) ARE NOT PART OF THIS
 REVIEW EXCEPT FOR THE STORMWATER LINE.
 B.BESIDES THE STORMWATER LINE ON THE
 HOME DEPOT ONLY THE STORMWATER LINES TO
 THE OTHER OUT PARCELS ARE APPROVED.ALL
 OUT PARCELS MUST BE PART OF SEPARATED
 PERMITS, SUCH AS MOBIL'S "ON THE RUN"
 STORE.ILDING PERMIT.
 10. A BLANK ROW PERMIT HAS BEEN ATTACHED
 FOR YOUR USE..
 11.FOR CLARIFICATION, THE NEW SANITARY
 MAIN IN PALM BEACH LAKES BOULEVARD, FROM
 THE EXISTING MANHOLE TO MANHOLE #11ROM
 BELONGS TO THE CITY.FROM THERE ONTOED
 THE SITE IT IS PRIVATE AND SHALL BE
 INSPECTED BY B&Z.FLOW PREVENTER OFF OF
 12.ON HANK AARON DRIVE ALL OF THEOWNED
 SANITARY AND WATER MAINS BELONGS TO THE
 CITY.NSTALL DOUBLE VALVING AND A PIG
 13. THERMOPLASTIC PAVEMENT MARKINGSHE
 SHALL BE PLACED IN THE PUBLIC ROAD
 RIGHT-OF-WAYS.HE SANITARY RUN FROM PHASE
 14. DEVELOPER TO COORDINATE AND PAY FOR
 TRAFFIC SIGNAL ADJUSTMENTS.HE MANHOLE
 15.RAMPS FOR THE H/C REQUIRED AT OUT
 INTERSECTIONS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2000-01-31 Cont ID  
Sent By rturnque Date 2000-01-31 Time 16:37 Rev Time 0.50
Received By rturnque Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-01-31 Cont ID  
Sent By tlarge Date 2000-01-31 Time 14:55 Rev Time 1.50
Received By tlarge Date 2000-01-31 Time 14:55 Sent To  
Notes
2001-01-08 00:00:00*****************PROVISO****************
 A WATER USE PERMIT IS REQD.FROM SFWMD
 FOR THE IRRIG.SYSTEM PER F.S.373.219.
  
 THE CHECK AND GATE VALVES SHALL BE
 LOCATED ABOVE THE SUMP PER SPC SEC.717.2
  
 A DEP PERMIT IS REQD.FOR THE WATER AND
 SANITARY SYSTEMS.PROVIDE DOCUMENTATION
 FROM DEP FOR APPROVAL OF THESE SYSTEMS.
 A PERMIT MAY ALSO BE REQD.FROM PB COUNTY
 HEALTH DEPT.FOR THE WATER SYSTEM.