Plan Review Details - Permit 99120627
Plan Review Stops For Permit 99120627
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2000-07-11 Cont ID  
Sent By dpalmer Date 2000-07-11 Time 12:14 Rev Time 0.00
Received By dpalmer Date 2000-07-11 Time 12:14 Sent To  
Notes
2001-01-08 00:00:00REV FOR SERVICE FROM OVERHEAD TO UNDER-
 GROUND.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-05-17 Cont ID  
Sent By dpalmer Date 2000-05-17 Time 08:50 Rev Time 0.00
Received By dpalmer Date 2000-05-17 Time 08:50 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-01-05 Cont ID  
Sent By dpalmer Date 2000-01-05 Time 13:23 Rev Time 0.00
Received By dpalmer Date   Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 1999-12-17 Cont ID  
Sent By jleech Date 1999-12-17 Time 15:26 Rev Time 0.35
Received By jleech Date 1999-12-17 Time 15:26 Sent To  
Notes
2001-01-08 00:00:00NO A/C SHOWN A/C PLAN TO BE SUBMITED
 BY A/C CONTRACTOR WITH APPLICATION.

Review Stop P PLUMBING
Rev No 1 Status P Date 1999-12-23 Cont ID  
Sent By tlarge Date 1999-12-23 Time 06:38 Rev Time 0.33
Received By tlarge Date 1999-12-23 Time 06:38 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2000-01-21 Cont ID  
Sent By fknapp Date 2000-01-21 Time 08:13 Rev Time 2.00
Received By fknapp Date 2000-01-20 Time 16:49 Sent To  
Notes
2001-01-08 00:00:00 
  
 ****************PROVISO*****************
  
 SBC 104.2.2
  
 1)PROVIDE PRODUCT APPROVAL FOR WINDOWS.
  
 2)PROVIDE MISSILE IMPACT PROTECTION
 INFORMATION FOR ALL NON-IMPACT GLAZING
 COMPLETE WITH INSTALLATION SCHEDULE AND
 SPECIFIC ANCHORS TO BE USED.
  
 3)PROVIDE SPACING OF TAPCONS ON BUCK
 DETAIL FOR WINDOWS AND DOORS.
  
 PLEASE SUBMIT PRIOR TO INSTALLATION.
  
 4)PROVIDE PRODUCT APPROVAL FOR ROOF
 COVERING UNDER SEPERATE PERMIT.
  
 5)PROVIDE MECHANICAL DRAWINGS AND MANUEL
 J WITH MECHANICAL PERMIT APPLICATION.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-01-05 Cont ID  
Sent By fknapp Date 2000-01-05 Time 15:07 Rev Time 3.00
Received By fknapp Date 2000-01-05 Time 13:13 Sent To  
Notes
2001-01-08 00:00:00 
 ****************DENIED******************
  
 SBC 104.2.2
  
 1)PROVIDE 2 CURRENT COPIES OF PRODUCT
 APPROVALS FOR:
 WINDOWS AND DOORS
 ROOF COVERING
  
 2)PROVIDE MISSILE IMPACT PROTECTION
 INFORMATION FOR ALL NON-IMPACT GLAZING
 COMPLETE WITH INSTALLATION SCHEDULE AND
 SPECIFIC ANCHORS TO BE USED.
  
 3)PROVIDE ENERGY CALCULATIONS
  
 4)PROVIDE WINDOW AND DOOR BUCK
 CONNECTION DETAILS FOR WINDLOAD
 RESISTANCE.97SBC-1606
  
 5)PROVIDE SIGNATURE AND RAISED SEAL ON
 SHEETS A-3
  
 6)BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED,IMPACT FEES MUST BE PAID TO PALM
 BEACH CO., THE PERMIT PLANS STAMPED BY
 THEM AND THE RECIEPT ATTACHED TO THE
 PERMIT APPICATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-01-05 Cont ID  
Sent By gjoyce Date 2000-01-05 Time 15:27 Rev Time 0.21
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***