| 2001-01-08 00:00:00 | PASSED WITH PROVISOS: |
| | |
| | SHEET P-1: |
| | A CLEAN-OUT IS REQUIRED AT THE TIE-IN TO |
| | THE CITY SYSTEM AT THE PROPERTY LINE. |
| | THIS IS NOT SHOWN ON THE DRAWINGS. |
| | |
| | THE SANITARY SEWER LATERAL RUNS OUT THE |
| | EAST SIDE OF THE BUILDING.THERE IS NO |
| | SANITARY MAIN IN OLIVE.THE SANITARY |
| | MAIN IS IN THE ALLEY ON THE NORTH SIDE |
| | OF THE PROPERTY.HAVE THE PLUMBER CALL |
| | 659-8079 AND HAVE THE MAINTENANCE CREW |
| | CHECK TO SEE IF THERE IS AN EXISTING |
| | LATERAL TO THE PROPERTY, IF THERE IS |
| | THEN RUN THE SANITARY LINE OUT TO THE |
| | EXISTING LATERAL (WHICH MAY BE WEST OF |
| | THE PROPOSED BUILDING).IF THERE IS NO |
| | EXISTING LATERAL THE CONTRACTOR WILL |
| | NEED TO TIE INTO THE EXISTING MAIN WITH |
| | A WYE, TWO FERNCOS USING SDR 26 PVC PIPE |
| | AND FITTINGS.THE EXISTING MAIN IN THE |
| | ALLEY IS 12" CLAY AND THE LATERAL WILL |
| | NEED TO BE 6". |
| | |
| | |
| | THE WATER LINE RUNS OUT THE WEST SIDE OF |
| | THE BUILDING.THERE IS A 3" TRANSITE |
| | WATER MAIN IN THE ALLEY THAT CAN BE USED |
| | FOR THE SERVICE. |
| | |
| | THE PLAN DOES NOT SHOW THE SIZE OF THE |
| | WATER METER REQUIRED AND IT DOES NOT |
| | SHOW A REDUCED PRESSURE PRINCIPLE |
| | BACKFLOW ASSEMBLY AT THE METER, ONE WILL |
| | BE REQUIRED. |
| | |
| | IT IS SUGGESTED THAT A SEPARATE |
| | IRRIGATION METER BE INSTALLED, THE |
| | SAVINGS WILL BE IN WATER USED.ALL |
| | WATER USED FOR THE BUILDING METER WILL |
| | BE CHARGED AGAINST THE SEWER CHARGES |
| | ALSO, DOUBLING THE WATER BILL FOR THE |
| | WATER USED TO IRRIGATE. |
| | |
| | NO DUMPSTER IS SHOWN.HOW WILL GARBAGE |
| | BE PICKED UP?WE HAVE INCLUDED A |
| | DUMPSTER DETAIL IF ONE NEEDS TO BE |
| | BUILT.THE RECYCLE SECTION IS ONLY A |
| | SUGGESTION.THE ENCLOSURE WILL NEED TO |
| | BE PLACED WHERE A TRUCK CAN PULL RIGHT |
| | UP TO THE OPEN GATES TO PICK UP THE |
| | DUMPSTER. |
| | |
| | A RIGHT OF WAY PERMIT APPLICATION IS |
| | INCLUDED FOR THE WORK INVOLVED WITH |
| | REMOVING THE SIDEWALKS AND DRIVEWAY ON |
| | EIGHTH STREET AND FOR THE NEW DRIVEWAY. |
| | A DRIVEWAY DETAIL DRAWING IS ALSO |
| | INCLUDED.THE DRIVEWAY APPROACH DETAIL |
| | MUST BE FOLLOWED. |
| | |
| | A FDOT PERMIT MAY BE REQUIRED TO TIE |
| | INTO THE CATCH BASIN ON OLIVE.CHECK |
| | WITH FDOT PRIOR TO DOING ANY WORK ON |
| | THIS BOX. |