Review Stop E ELECTRICAL
Rev No 1 Status P Date 1999-12-14 Cont ID  
Sent By dpalmer Date 1999-12-14 Time 07:37 Rev Time 0.00
Received By dpalmer Date 1999-12-14 Time 07:37 Sent To  
Notes
2001-01-08 00:00:00*******PROVISO****************
  
 1)NOTE: NEED TO SUBMIT AIC RATING OF ALL
 EQUIPMENT , MAIN DISC`S AND BRANCH BRKRS
 AIC RATING IS FIGURED FROM FAULT CURRENT
 CALCULATUIONS. REQ`D AS PER 110-9/215-5
  
 2) NOTE:AS PER 250-81/215-5 NEED TO SHOW
 COMPLETE GROUNDING ELECTRODE SYSTEM.
 TO INCLUDE BLDG.STEEL
  
 3)NOTE:NO EQUIPMENT GROUNDING CONDUCTOR
 BWTWEEN METER AND FIRST MEANS OF DISC.
  
 4)NOTE:AS PER 210-52D/215-5 PLEASE LIST
 DEDICATED BATH(S) CIRCUT ON PANEL
 SCHEDULE. MUST BE 20AMP #12 AWG.
  
 5)NOTE: AS PER 1993/1996 NFPA-72
 2-2-.1.1.1 SMOKE DETECTORS ARE REQ`D
 INSIDE AND OUTSIDE ALL SLEEPING ROOMS
 AND ROOMS ABLE TO CONVERT TO SLEEPING
 ROOMS.W/CLOSET SPACE.
  
 PLEASE SUBMIT ALL THE ABOVE INFORMATION
 FOR REVIEW AND APPROVAL BEFORE FIRST
 ROUGH ELECTRICAL INSPECTION IS CALLED IN
 IF THERE ARE ANY QUESTIONS PLEASE CALL
 659-8096 EXT.8372

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2001-07-25 Cont ID  
Sent By pkrauss Date 2001-07-25 Time 13:35 Rev Time 0.45
Received By pkrauss Date 2001-07-25 Time 13:35 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-09-27 Cont ID  
Sent By jleech Date 2000-09-27 Time 17:45 Rev Time 0.50
Received By jleech Date 2000-09-27 Time 17:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 1999-12-09 Cont ID  
Sent By cthirben Date 1999-12-09 Time 15:23 Rev Time 1.50
Received By cthirben Date 1999-12-09 Time 15:21 Sent To  
Notes
2001-01-08 00:00:00PROVISO: SECONDARY DRAIN PROTECTION
 REQUIRED. SMC: 304.8.6.1

Review Stop P PLUMBING
Rev No 2 Status P Date 2000-02-05 Cont ID  
Sent By tlarge Date 2000-02-05 Time 07:19 Rev Time 0.50
Received By tlarge Date 2000-02-05 Time 07:19 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2000-02-05 Cont ID  
Sent By tlarge Date 1999-12-09 Time 07:29 Rev Time 0.33
Received By tlarge Date 1999-12-09 Time 07:29 Sent To  
Notes
2001-01-08 00:00:00LOCATION OF FIXTURES ON SANITARY RISER
 SHALL MATCH FLOOR PLAN.CITY OF WPB
 AMENDMENTS TO SPC SEC.104.2.1.
  
 MAIN VENT THRU ROOF REQD.PER SPC 904.3.
  
 FIXTURES DOWNSTREAM OF WATER CLOSET
 SHALL BE VENTED 913.2.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2000-01-12 Cont ID  
Sent By fknapp Date 2000-01-12 Time 15:01 Rev Time 4.00
Received By fknapp Date 2000-01-12 Time 10:27 Sent To  
Notes
2001-01-08 00:00:00 
  
 *****************PROVISO****************
  
 SBC 104.2.2
  
 1)PROVIDE ENGINEERING FOR BUTT GLASS
 OPENINGS.
  
 2)PROVIDE MISSILE IMPACT PROTECTION
 INFORMATION FOR ALL NON-IMPACT OPENINGS
 UNDER SEPERATE PERMIT.
  
 3)PROVIDE PRODUCT APPROVALS FOR FRONT
 ENTRY DOOR UNIT.
  
 4)PROVIDE PRODUCT APPROVAL FOR UL LISTED
 FIREPLACES.
  
 5)PROVIDE SAFETY GLASS IN LOCATIONS AS
 REQUIRED.
  
 PLEASE SUBMIT PRIOR TO INSTALLATION
  
 6)PROVIDE SOIL REPORT PRIOR TO FIRST
 INSPECTION.

Review Stop Z ZONING
Rev No 2 Status P Date 2000-02-16 Cont ID  
Sent By gjoyce Date 2000-02-16 Time 11:16 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2000-02-16 Cont ID  
Sent By gjoyce Date 1999-12-08 Time 11:50 Rev Time 0.75
Received By gjoyce Date   Time   Sent To  
Notes
2001-01-08 00:00:00STRUCTURE TOO HIGH