| 2001-01-08 00:00:00 | ************* PROVISO **************** |
| | |
| | 1)NOTE: NOW THAT NEW SERVICE IS BEING |
| | INSTALLED. PLEASE SUBMIT NEW RISER |
| | DIAGRAM SHOWING SERVICE. TO INCLUDE ALL |
| | OF THE FOLLOWING: METER, MAIN DISC/MCB. |
| | ALL CONDUIT SIZES, WIRE SIZES FOR FEEDER |
| | -S, PLANS SHOW MAIN INSIDE AS EXISTING,, |
| | IS THIS GOING TO REMAIN? ART;215-5 |
| | |
| | 2)NOTE: PLANS/PANEL SCHEDULE SHOWS 20KW |
| | OF HEAT BEING FIGURED INTO THE LOAD.??? |
| | PANEL SCHEDULE ONLY SHOW ONE(1) A/C COMP |
| | AND AIR HANDLER?? IF THERE IS GOING TO |
| | BE TWO A/C UNITS THEN THEY BOTH NEED TO |
| | BE ON PANEL SCHEDULE. REQ`D BY NEC ART; |
| | 215-5 |
| | |
| | 3)NOTE:PLEASE LIST THE REQD` DEDICATED |
| | CIRCUT(S) FOR BATH(S) ON PANEL SCHEDULE. |
| | AS REQ`D BY 210-52D/ 215-5 |
| | |
| | 4)NOTE: PLEASE CHECK ALL WIRE SIZES FOR |
| | OVER CURRENT PROTECTION,,, |
| | A/C COMP AT 2P50 AND HAS #10 AWG,#8 FOR |
| | AHU MAY NOT BE PROTECTED AT 60 AMPS,THE |
| | WIRE AMPACITIES MAY ONLY BE USED FROM |
| | THE 75 DEGREE COLUMN IN ART;310-16 |
| | THE OTHER LOADS FOR POOL PUMP AND HOT |
| | TUB ARE MOTOR LOADS BUT NAMEPLATE RATING |
| | SHOULD BE CHECKED FOR MAX. OVERCURRENT |
| | PROTECTION. |
| | |
| | PLEASE HAVE THE ABOVE INFORMATION |
| | SUBMITTED FOR REVIEW AND APPROVAL BEFORE |
| | FIRST ROGH ELECTRICALINSPECTION IS |
| | CALLED IN. IF THERE ARE ANY QUESTIONS |
| | PLEASE CALL; 659-8096 EXT 8372 |