|
 |
 |
 |
 |
 |
Plan Review Details - Permit 99111499
| Plan Review Stops For Permit 99111499 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
1999-12-06 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
1999-12-06 |
Time |
11:31 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
1999-12-06 |
Time |
11:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
1999-12-06 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
1999-12-06 |
Time |
11:49 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
1999-12-06 |
Time |
11:47 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | MECH. DRGS. TO BE PROVIDED BY A/C | | | CONTRACTOR |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2000-01-06 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-01-06 |
Time |
10:00 |
Rev Time |
2.00 |
| Received By |
fknapp |
Date |
2000-01-06 |
Time |
09:59 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | *****************PROVISO**************** | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE 2 CURRENT COPIES OF PRODUCT | | | APPROVALS FOR: | | | EXTERIOR DOORS AND WINDOWS | | | ROOF COVERING UNDER SEPERATE PERMIT | | | | | | PLEASE SUBMIT PRIOR TO INSTALLATION |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
1999-12-06 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
1999-12-06 |
Time |
16:02 |
Rev Time |
3.00 |
| Received By |
fknapp |
Date |
1999-12-06 |
Time |
14:40 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ****************DENIED****************** | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE 2 CURRENT COPIES OF PRODUCT | | | APPROVALS FOR: | | | ALL NEW EXTERIOR DOORS AND WINDOWS | | | ROOF COVERING | | | | | | 2)PROVIDE 2 CURRENT SURVEYS SIGN AND | | | SEALED | | | | | | 3)PROVIDE SIGNATURE OF OWNER ON ENERGY | | | CALCULATIONS | | | | | | 4)PROVIDE DESIGN PARAMETERS AND | | | ASSUMPTIONS FOR SBC 1997 | | | | | | 5)PROVIDE SOIL REPORT | | | | | | 6)PROVIDE MISSILE IMPACT PROTECTION INFO | | | | | | ADDITION IN FLOOD ZONE A5 MINIMUM ELEV | | | 7.5 REQUIRES FLOOD ZONE CERTIFICATE | | | | | | BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED,IMPACT FEES MUST BE PAID TO PALM | | | BEACH CO., THE PERMIT PLANS STAMPED BY | | | THEM AND THE RECIEPT ATTACHED TO THE | | | PERMIT APPLICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
1999-12-02 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
1999-12-02 |
Time |
15:21 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |