| 2001-01-08 00:00:00 | ***************PROVISO***************** |
| | |
| | 1)NOTE:NEED TO SUBMIT AIC RATING OF |
| | EQUIPMENT MAINS AND BRKRS. AIC RATING IS |
| | FIGURED FROM FAULT CURRENT CALCULATIONS. |
| | AS PER ART; 110-9/215-5 |
| | |
| | 2)NOTE:AS PER 1993/1996 NFPA-72 2-2.1.1 |
| | .1 SMOKE DETECTORS ARE REQ`D INSIDE AND |
| | OUTSIDE ALL SLEEPING ROOMS OF NEW |
| | DWELLINGS. |
| | |
| | 3)NOTE:AS PER 210-52D PLEASE INCLUDE |
| | BATH(S) GFI CIRCUT ON PANEL SCHEDULE. |
| | 20 AMP,#12 AWG. DEDICATED. |
| | |
| | 4)NOTE:AS PER 210-8-A-6 ALL RECEPTS. |
| | SERVING KITCHEN COUNTERSPACE ARE TO BE |
| | GFI/GFI PROTECTED. |
| | |
| | 5)NOTE: PLANS SHOW MAIN DISCONNECT NEXT |
| | TO METERCAN,,,,,POWER RISER SHOWS NO |
| | MAIN?? WHICH IS IT? ALSO IF 200 AMP |
| | SERVICE IS GOING TO BE AN OPTION THEN |
| | DRAW SECOND RISER WITH WIRE SIZES, |
| | CONDUIT SIZE, AND APPRO. GROUND. |
| | |
| | 6)NOTE: AS PER 250-81/215-5 PLEASE INCL. |
| | COLD WATER PIPE AS PART OF THE GROUNDING |
| | SYSTEM. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW AND APPROVAL BEFORE FIRST ROUGH |
| | ELECTRICAL INSPECTION IS CALLED IN. THIS |
| | WOULD INCLUDE GROUND ROUGH IF ANY. |