Plan Review Details - Permit 99100932
Plan Review Stops For Permit 99100932
Review Stop E ELECTRICAL
Rev No 1 Status P Date 1999-10-21 Cont ID  
Sent By dpalmer Date 1999-10-21 Time 05:38 Rev Time 0.00
Received By dpalmer Date 1999-10-21 Time 05:38 Sent To  
Notes
2001-01-08 00:00:00**************PROVISO******************
  
 1)NOTE:PAGE E-19 ALL PANELS AT DETACHED
 STRUCTURES,,G2,CW,G1,,,ARE TO HAVE
 GROUND RODS,FOOTER STEEL AND COLD WATER
 BOND (IF ANY).AS PER 250-24/250-81
 2)NOTE:SERVICE TO TC SHOWS EQUIPMENT
 GROUNDS BEING INSTALLED FROM METER/GUTT-
 -ER TO FIRST MEANS OF DISC!!!??
 EQUIPMENT GROUND IS ONLY TO BE INSTALLED
 AFTER FIRST MEANS OF DISC.
 3)NOTE:AS PER 215-5 ELECTRICAL RISER
 FOR G-2 AND PANEL FOR G-2 NEED TO MATCH
 FOR CONDUIT SIZE FEEDING PANEL CW!!
 4)NOTE:PAGE E-20 GATE HOUSE SERVICE....
 GROUNDING ELECTRODE CONDUCTOR IS TO GO
 TO COLD WATER BOND (IF ANY).
 5)NOTE,NOTE:ALL DISC.MEANS AT DETACHED
 STRUCTURES SHALL BE CLEARLY LABELED AS
 TO WHERE FEEDS ARE FROM!!!
  
 NEED TO SUBMIT THE ABOVE INFORMATION
 FOR REVIEW AND APPROVAL BEFORE FIRST
 ROUGH ELECTRICAL INSPECTION IS CALLED IN

Review Stop P PLUMBING
Rev No 1 Status P Date 1999-10-23 Cont ID  
Sent By tlarge Date 1999-10-23 Time 07:45 Rev Time 0.33
Received By tlarge Date 1999-10-23 Time 07:45 Sent To  
Notes
***NONE***