| 2001-01-08 00:00:00 | PASSED WITH PROVISOS: |
| | STORMWATER: |
| | PLAN SHEET S1, STATES THAT THREE CAR |
| | GARAGE WILL BE BUILT "ON GRADE" AND |
| | GIVES THE GRADE OF 16.40 FOR THE GARAGE |
| | FLOOR (SEE SHEET C1).THE CITY ALLEY |
| | (LOOK AT SHEET C1) HAS A GRADE OF 17.33 |
| | STARTING AT THE BACK OF SIDEWALK AT |
| | QUADRILLE AND DROPS 1.77 FEET TO 15.56 |
| | JUST EAST OF THE GARAGE.YOU NEED TO |
| | INSURE THAT THE GARAGE WILL NOT BE |
| | FLOODED BY RUN OFF FROM THE ALLEY, THE |
| | CITY WILL NOT BE RESPONSIBLE FOR |
| | CHANGING THE GRADE OF THE ALLEY AND THE |
| | WEST END OF THE GRADE CAN NOT BE |
| | CHANGED. ADDITIONALLY IT IS DOUBTFUL |
| | THAT A CAR WILL BE ABLE TO MAKE A 90 |
| | DEGREE TURN INTO THE GARAGE IN A 14' |
| | WIDE ALLEY. |
| | PRIOR TO THE START OF CONSTRUCTION THE |
| | FOLLOWING STORM WATER REQUIREMENTS MUST |
| | BE MET. |
| | SUBMIT COPIES OF THE INFORMATION LISTED |
| | BELOW TO BE ADDED TO DEAN LAUDERMILK FOR |
| | REVIEW AND INCLUSION WITH THE BUILDING |
| | PLANS.IF THIS IS NOT DONE THE CITY |
| | WILL NOT ALLOW THE WORK TO PROCEED: |
| | FOUR COPIES OF THE FOLLOWING MUST BE |
| | SIGNED AND SEALED BY A FLORIDA |
| | PROFESSIONAL ENGINEER (PE). |
| | 1.CONSTRUCTION PLANS (SHEET C-3) |
| | 2.DETAILS AND SPECIFICATIONS SHEET C-3), |
| | 3.HYDRAULIC COMPUTATIONS AND SUPPORTING |
| | DOCUMENTATION (NOT SUPPLIED) |
| | 4.IMPERVIOUS AREA COMPUTATIONS (NOT |
| | SUPPLIED) |
| | |
| | 5.POLLUTION PREVENTION PLAN.(NOT |
| | SUPPLIED) THE POLLUTION PREVENTION PLAN |
| | SHALL BE KEPT ON SITE AT ALL TIMES |
| | DURING CONSTRUCTION. THE PLAN SHALL BE |
| | INSTALLED IN THE FIELD PRIOR TO ANY |
| | EARTHWORK. THE ENGINEER OF RECORD SHALL |
| | CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| | THAT THE PLAN IS WORKING PROPERLY AND AS |
| | DESIGNED. THE ENGINEER OF RECORD IS |
| | RESPONSIBLE TO CERTIFY IMPLEMENTATION OF |
| | THE PROVISIONS OF CITY ORDINANCE NO. |
| | 3132-98 OF THE CITY CODE AT SUCH TIME |
| | THE PERMITTEE APPLIES FOR A CERTIFICATE |
| | OF OCCUPANCY FROM THE CITY BUILDING |
| | OFFICIAL. |
| | 6.EVERY SIX MONTHS AFTER CONSTRUCTION A |
| | PE SHALL CERTIFY THAT THE PERMANENT |
| | POLLUTION PREVENTION STRUCTURES, DRY-WET |
| | WATER DETENTION FACILITIES, AND |
| | EXFILTRATION SYSTEMS ARE WORKING AS |
| | DESIGNED AND ARE IN GOOD OPERATING |
| | CONDITION. ALL CERTIFICATIONS MUST BE |
| | SUBMITTED TO: |
| | STORM WATER UTILITY ENGINEER |
| | CITY OF WEST PALM BEACH PUBLIC UTILITIES |
| | DEPARTMENT |
| | P.O. BOX 3366, WEST PALM BEACH, FL |
| | 33402. |
| | THE CERTIFICATION MUST INCLUDE THE |
| | BUILDING PERMIT NUMBER, THE ADDRESS OF |
| | THE PROPERTY AND THE NAME OF THE |
| | ESTABLISHMENT/PROJECT CONSTRUCTED. |
| | WATER AND SANITARY: |
| | 1.THE METERS FOR THE BUILDING (1-1/2") |
| | AND IRRIGATION (1") MUST BE LOCATED IN |
| | THE CITY SIDEWALK, AT THE POINT WHERE |
| | THE PLUMBING EXITS THE BUILDING (SEE |
| | SHEET P-1) NOT WHERE IT IS SHOWN ON C-1 |
| | OR I-1. THE LOCATION AT THE EAST END OF |
| | THE PROPERTY IS TOO CLOSE TO THE NEXT |
| | PROPERTY LINE.THE LOCATION WEST OF THE |
| | ENTRANCE CAN ALLOW FOR THE BACKFLOW |
| | PREVENTERS TO BE HIDDEN WITH |
| | LANDSCAPING. |
| | 2. THE DETAIL ON SHEET C-3 FOR THE NEW |
| | WATER LINE IS WRONG ALSO.THE TAP WILL |
| | BE 1-1/2 BY 2", THE COPPER AND ANGLE |
| | VALVE WILL BE 2" WHICH WILL ALLOW FOR A |
| | 1-1/2" METER TO BE SET ON IT. SEE THE |
| | DETAIL ON SHEET C-6. |
| | 3.A CLEAN-OUT WILL NEED TO BE INSTALLED |
| | IN THE SANITARY SEWER LATERAL, ON THE |
| | PROPERTY, AT THE EDGE OF THE ALLEY. |
| | THIS IS NOT SHOWN ON SHEET C-1 BUT THERE |
| | IS A DETAIL ON SHEET C-4. |
| | 4.THE DETAILS USED FROM THE UTILITIES |
| | DEPARTMENT IS OLD ALL PIPE IN THE ROW ON |
| | THE SANITARY MUST BE SDR 26. |
| | 5.A COPY OF THE WATER AND SANITARY AS- |
| | BUILTS WILL BE SUBMITTED TO ENGINEERING |
| | FOR THIER RECORDS. |
| | SEE NEXT REVIEW FOR REST OF COMMENTS. |