| Plan Review Stops For Permit 99100045 |
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2000-03-20 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-03-20 |
Time |
10:16 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-03-20 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
1999-10-04 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
1999-10-04 |
Time |
13:59 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-03-16 |
Time |
09:34 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | REJECTED; | | | 1.DOLLAR VALUE OF WORK NOT HIGH ENOUGH. | | | EQUIPMENT, DUCTS, AND LABOR COSTS MUST | | | BE COMBINED F0R TOTAL COST OF JOB. | | | 2.TWO SETS OF DRAWINGS ARE REQUIRED | | | SHOWING AS SMC 104.2.1 | | | A.MODEL NUMBERS OF CONDENSOR AND | | | AIR HANDLER. | | | B.SEER VALUE OF THE CONDENSOR. | | | C.ALL DUCT WORK MUST BE SIZED | | | WITH VENT SIZES. | | | D.CFM (CUBIC FEET OF AIR PER. | | | MINUTE) FOR EACH DROP. | | | 03-13-00 I CLYDE LEFT MESSAGE THAT MECH. | | | PLANS REQUIRED. | | | 03-16-00 SPOKE TO ANTONIO PIERRE INFORM | | | HIM OF THE NOTES AND HE NEEDS | | | GET IT YO THE DEPARTMENT. | | | *******INFORMED BILL STAPLES OF THIS | | | SITUATION AND HE TOLD ME TO | | | GET A LETTER TO ANTONIO, THAT | | | HE HAS TEN(10) DAYS TO COMPLY | | | TO THE CODE. |
|
|
|