| 2001-01-08 00:00:00 | |
| | APPROVED WITH PROVISO: |
| | 1-PROVIDE A SIGNED, SEALED AND DATED |
| | SURVEY. |
| | 2-UPDATE TRUSS DRAWINGS: |
| | -SBC 1997 OR ASCE 7-95. |
| | -ENGINEER OF RECOR TO REVIEW ALL TRUSS |
| | DRAWINGS PRIOR TO SUBMITTAL. |
| | 3-REVISE FOOTING F2. SOIL TEST REPORT |
| | CALLS FOR AN 18" MIN WIDTH OF FOOTING. |
| | 4-REVISE ENTRY DOOR. CLEAR OPENING PER |
| | LEAF TO BE 32" MIN. TABLE 1004 SBC/97. |
| | 5-REVISE ALL ORIGINALS SHOWING ALL |
| | CORRECTIONS/CLARIFICATIONS AS REQUIRED |
| | 6-PROVIDE COMPLETE DETAIL SHOWING |
| | INSTALLATION OF WINDOWS TO STEEL |
| | COLUMN AT BREAKFAST AREA. |
| | NOTE: SPECIFICATIONS MUST MEET THE |
| | PRODUCT APPROVAL REQUIREMENTS OR |
| | SPECIFIC ENGINEERING ANALYSIS WILL BE |
| | REQUIRED. |
| | 7-PROVIDE COMPLETE SET OF PRODUCT |
| | APPROVALS, INCLUDING ENTRY DOORS, |
| | SLIDING GLASS DOORS WITH TRANSOM ABOVE |
| | ASSEMBLY, ROUND AND OVAL WINDOWS, ETC. |
| | 8-PROVIDE CALCULATIONS TO CLARIFY WHY |
| | THE DESIGN PRESSURES FOR GOLFCART DOOR |
| | ARE LOWER THAN THOSE FOR THE REGULAR |
| | GARAGE DOOR. |
| | 9-STORM PANELS: |
| | -PROVIDE COMPLETE INSTALLATION SCHEDULE |
| | (AS PER CITY SAMPLE) AND KEY PLAN. |
| | -HIGHLIGHT SPECIFIC MOUNTING CONDITIONS |
| | AND ANCHORS SPACING. |
| | 10-SEE ADDITIONAL COMMENTS ON PLANS AND |
| | REVISE/CLARIFY AS REQUIRED. |