Plan Review Details - Permit 99091003
Plan Review Stops For Permit 99091003
Review Stop E ELECTRICAL
Rev No 1 Status P Date 1999-10-14 Cont ID  
Sent By dpalmer Date 1999-10-14 Time 07:15 Rev Time 0.00
Received By dpalmer Date 1999-10-14 Time 07:15 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 1999-11-02 Cont ID  
Sent By jleech Date 1999-11-02 Time 14:55 Rev Time 0.50
Received By jleech Date 1999-11-02 Time 14:55 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 1999-11-02 Cont ID  
Sent By jleech Date 1999-10-12 Time 15:23 Rev Time 0.35
Received By jleech Date 1999-10-12 Time 15:23 Sent To  
Notes
2001-01-08 00:00:00DENIED;
 NO A/C PLAN.

Review Stop P PLUMBING
Rev No 1 Status P Date 1999-10-02 Cont ID  
Sent By tlarge Date 1999-10-02 Time 06:09 Rev Time 0.33
Received By tlarge Date 1999-10-02 Time 06:08 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 1999-10-25 Cont ID  
Sent By jgomez Date 1999-10-25 Time 15:21 Rev Time 1.50
Received By jgomez Date 1999-10-25 Time 15:21 Sent To  
Notes
2001-01-08 00:00:00 
 APPROVED WITH PROVISO:
 1-PROVIDE ATTIC ACCESS AT MAIN ROOF AND
 AT GUEST SUITE. SEC 2309.6 SBC 1997.
 2-PROVIDE PRODUCT APPROVAL FOR
 HORIZONTAL SLIDERS,ENTRY DOORS.
 3-CEILING FAN IN LIBRARY IS NOT OPTIONAL
 BECAUSE CREDIT WAS TAKEN FOR CEILING
 FANS IN THE ENERGY CALCULATIONS.
 REVISE PLANS AS REQUIRED.
 4-PROVIDE COMPLETE INSTALLATION SPECS
 FOR CEILINGS AT FRONT AND REAR PORCHES
 NOTE: FRONT CEILING CALLS FOR STUCCO
 CEILING AND REAR PORCH CALLS FOR
 DRYWALL CEILING. SEC 2504 SBC 1997.
 5-UPDATE ALL TRUSS DRAWINGS:
 -DESIGN CRITERIA TO BE EITHER SBC 1997
 OR ASCE 7-95. DESIGN CRITERIA MUST BE
 SPECIFIED ON ENGINEERED DRAWINGS.
 -TRUSS DRAWINGS TO BE REVIEWED BY
 DESIGNER OF RECORD PRIOR TO SUBMITTAL.
 -TRUSS LAYOUT TO BE SIGNED, SEALED AND
 DATED BY TRUSS ENGINEER.
 -PROVIDE TWO COPIES OF ENGINEERED
 DRAWINGS, SIGNED, SEALED AND DATED.
 -UPDATE ALL SUPPORTING DETAILS USING
 SBC 97 OR ASCE 7-95.
 6-REVISE THE DESIGN CERTIFICATION FOR
 BUILDING CODE COMPLIANCE FORM. MEAN
 ROOF HEIGHT AND BASIC VELOCITY
 PRESSURE ARE INCORRECT.
 TABLE 1606.2A SBC 1997.
 CLARIFY WHAT RESPONSIBILITY IS ROBERT
 AGSTEN, THE ENGINEER, ASSUMING.
 NONE OF THE DRAWINGS ARE SIGNED AND
 SEALED BY HIM, EXCEPT FOR THE DESIGN
 CERTIFICATION FOR BUILDING CODE
 COMPLIANCE FORM.
 7-STORM PANELS:
 -PROVIDE INSTALLATION SCHEDULE AND KEY
 PLAN. HIGHLIGHT SPECIFIC MOUNTING
 CONDITIONS AND ANCHORS TO BE USED.

Review Stop Z ZONING
Rev No 1 Status P Date 1999-09-30 Cont ID  
Sent By gjoyce Date 1999-09-30 Time 16:32 Rev Time 0.50
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved