Plan Review Details - Permit 99080933
Plan Review Stops For Permit 99080933
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 1999-09-23 Cont ID  
Sent By hpiskura Date 1999-09-23 Time 10:05 Rev Time 1.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2000-01-13 Cont ID  
Sent By dpalmer Date 2000-01-13 Time 07:14 Rev Time 0.00
Received By dpalmer Date 2000-01-13 Time 07:14 Sent To  
Notes
2001-01-08 00:00:00************* UNSAT ******************
  
 1)NOTE:PLEASE NOTE THAT IN RISER DIAGRAM
 WHERE CONDUCTORS ARE BEING RUN IN PARA-
 -LLEL.THIS MEANS THERE MUST BE THE SAME
 AMOUNT AND SIZE CONDUCTORS IN EACH RISER
 2)NOTE: ALSO AS PER NEC ART;310-4 THE
 SMALLEST CONDUCTOR ALLOWED TO BE RUN IN
 PARALLEL IS 1/0.SUBMIT NEUTRAL CALC.!!
 3)NOTE:YOU SHOW #2 BEING FED TO PANELS
 C'AND 'A'. #2 IS NOT TO BE PROTECTED AT
 200 AMPS.! ALSO #2 IS TOO SMALL TO BE
 RUN IN PARALLEL 310-4.
 4)NOTE:PLEASE NOTE ,YOU SHOW EQUIPMENT
 GROUNDING CONDUCTOR GOING FROM METER TO
 DISCONNECT. ONLY AFTER FIRST MEANS OF
 DISC.
 5)NOTE:WIRE SIZE GOING TO PANEL 'D' IS
 TOO SMALL. 2/0 IS RATED FOR 175AMPS
 PER ART;310-16. LOAD YOU SHOW IS 180AMPS
 6)NOTE: STILL NEED TO SUBMIT NEUTRAL
 LOAD CALCULATION. 215-5
  
 PLEASE HAVE THE ABOVE CORRECTED AND
 SUBMITTED FOR REVIEW AND APPROVAL.
 IF THERE ANY QUESTIONS PLEASE CALL;
 561-659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 1 Status P Date 1999-10-04 Cont ID  
Sent By lmartine Date 1999-10-04 Time 12:55 Rev Time 0.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 1999-10-04 Cont ID  
Sent By lmartine Date 1999-10-04 Time 12:55 Rev Time 0.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 1999-09-02 Cont ID  
Sent By ndenmark Date 1999-09-02 Time 11:02 Rev Time 0.33
Received By ndenmark Date 1999-09-02 Time 11:02 Sent To  
Notes
2001-01-08 00:00:00PROVIDE OUTSIDE AIR CALCULATIONS PRIOR
 TO PERMIT ISSUE

Review Stop P PLUMBING
Rev No 2 Status P Date 1999-09-30 Cont ID  
Sent By tlarge Date 1999-09-30 Time 13:17 Rev Time 0.00
Received By pschmitz Date 1999-10-02 Time 07:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 1999-10-02 Cont ID  
Sent By tlarge Date 1999-09-24 Time 16:43 Rev Time 1.00
Received By pschmitz Date 1999-10-02 Time 08:00 Sent To  
Notes
2001-01-08 00:00:00INDICATE TYPE OF PIPING MATERIAL TO BE
 INSTALLED FOR GAS SYSTEM.COMPLY W/STD.
 GAS CODE SEC.306.
  
 SUBMIT MANUF.SHEETS FOR GAS EQUIPMENT.
 COMPLY W/STD.GAS CODE SEC.402.1.
  
 SUPPLY CALCULATIONS FOR COMBUSTION AIR
 FOR WATER HEATER AND DRYERS.COMPLY W/
 STD.GAS CODE SEC.402.4.
  
 SIZE ALL SECTIONS OF THE WATER RISER.NO
 MORE THAN 2 FIXTURES SHALL BE CONNECTED
 TO A 1/2" C.W. LINE AND 4 FIXTURES TO A
 H.W.LINE PER COUNTYWIDE AMENDMENTS SEC.
 607.7.
  
 A VENT IS REQD.ON THE FLOOR DRAIN FOR
 THE WASHING MACHINES PER SPC SEC.901.2.
  
 INDICATE SLOPE OF SANITARY SYSTEM AND
 NOTE FIXTURE LOAD PER SPC TABLE 713.1
 FOOTNOTE #3 AND NOTE SIZE OF STANDPIPE.
 SPC 1001.9.1.
  
 FLOOR DRAINS ARE REQD.IN THE TOILET
 ROOMS PER SPC 409.4.1.1.
  
 WALLS IN TOILET ROOMS SHALL BE NON-
 ABSORBENT MATERIAL TO 4' PER SBC SEC.
 1204.2
  
 DRINKING FOUNTAIN SHALL COMPLY W/FACBC
 SEC.4.1.3(10)(A).
  
 `

Review Stop Z ZONING
Rev No 1 Status P Date 1999-10-04 Cont ID  
Sent By lmartine Date 1999-10-04 Time 12:55 Rev Time 0.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***