Plan Review Details - Permit 99080888
Plan Review Stops For Permit 99080888
Review Stop E ELECTRICAL
Rev No 2 Status P Date 1999-10-15 Cont ID  
Sent By dpalmer Date 1999-10-15 Time 06:41 Rev Time 0.00
Received By dpalmer Date 1999-10-15 Time 06:41 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 1999-10-15 Cont ID  
Sent By fknapp Date 1999-10-14 Time 11:26 Rev Time 0.00
Received By dpalmer Date 1999-09-28 Time 16:10 Sent To  
Notes
2001-01-08 00:00:00*************DENIED********************
  
 1)NOTE:AS PER ART;210-52G ALL RECEPTS.
 IN GARAGE ARE TO BE GFI/GFI PROTECTED.
 2)NOTE: AS PER 210-52E RECEPTS.REQ`D
 FRONT AND BACK OF DWELLING.
 3)NOTE:AS PER ART;210-70 LIVING ROOM
 HAS MEANS OF EGRESS INTO GARAGE, LIGHT
 SWITCH IS REQ`D NOTE 3-WAY.
 4)NOTE:AS PER ARTS;210-52C/210-8-A-6
 OUTLET SPACING IN KITCHEN ALONG
 COUNTER SPACE AND ALL RECEPTS.IN KITCHEN
 SERVING COUNTERSPACE ARE TO BE GFI/GFI
 PROTECTED.
 5)NOTE:AS PER NFPA-96 SMOKE DETECTORS
 ARE REQ`D INSDIE AND OUTSIDE ALL
 SLEEPING ROOMS IN NEW CONSTUCTION HARD
 WIRED 120V WITH BATTERY BACK-UP AND
 WIRED IN LINE.
 6)NOTE:AS PER ART:210-52D BATH CIRCUTS
 REQ` 20AMP DEDICATED CIRCUT.PLEASE LIST
 ON PANEL SCHEDULE.
 7)NOTE:AS PER ART;250-81 GROUNDING
 ELECTRODE CONDUCTOR IS REQ`D TO GO TO
 BLDG.STEEL ALSO.
 8)NOTE:AS PER ARTS;110-9/215-5 MUST
 HAVE AIC RATING OF ALL EQUIPMENT BEING
 USED.PLEASE HAVE ON PANEL SCHED.
  
 PLEASE SUBMIT ALL THE ABOVE FOR APPROVAL

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2000-10-04 Cont ID  
Sent By jleech Date 2000-10-04 Time 17:24 Rev Time 0.33
Received By jleech Date 2000-10-04 Time 17:24 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 1999-11-17 Cont ID  
Sent By fknapp Date 1999-11-17 Time 16:40 Rev Time 0.00
Received By fknapp Date   Time   Sent To  
Notes
2001-01-08 00:00:00APPROVED PER JOHN LEECH 10-15-99

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 1999-11-17 Cont ID  
Sent By jleech Date 1999-09-28 Time 07:53 Rev Time 0.00
Received By fknapp Date 1999-09-28 Time 07:53 Sent To  
Notes
2001-01-08 00:00:00DENIED;
 1. NO A/C DRAWINGS.
 2. NO FLORIDA ENERGY CALCULATIONS.

Review Stop P PLUMBING
Rev No 4 Status P Date 1999-11-16 Cont ID  
Sent By tlarge Date 1999-11-16 Time 14:13 Rev Time 0.33
Received By tlarge Date 1999-11-16 Time 14:13 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 1999-11-04 Cont ID  
Sent By tlarge Date 1999-11-04 Time 17:00 Rev Time 0.33
Received By tlarge Date 1999-11-04 Time 17:00 Sent To  
Notes
2001-01-08 00:00:00SUBMIT AN ISOMETRIC THAT MATCHES THE
 FLOOR PLAN. CITY OF WPB AMENDMENTS TO
 SPC SEC.104.2.1.
  
 FIXTURE BRANCH IN MASTER BATH SHALL
 CONNECT TO STACK BELOW WATER CLOSET PER
 SPC 913.3.

Review Stop P PLUMBING
Rev No 2 Status F Date 1999-10-18 Cont ID  
Sent By tlarge Date 1999-10-18 Time 07:20 Rev Time 0.33
Received By tlarge Date 1999-10-18 Time 07:20 Sent To  
Notes
2001-01-08 00:00:00SANITARY ISOMETRIC SHALL MATCH THE FLOOR
 PLAN. SPC 104.2.1.

Review Stop P PLUMBING
Rev No 1 Status F Date 1999-09-23 Cont ID  
Sent By tlarge Date 1999-09-23 Time 07:13 Rev Time 0.50
Received By tlarge Date 1999-09-23 Time 07:13 Sent To  
Notes
2001-01-08 00:00:00SANITARY ISOMETRIC SHALL CORRELATE W/THE
 FLOOR PLAN.SPC 104.2.1.
  
 SIZE OF SHOWER SHALL COMPLY W/COUNTYWIDE
 AMENDMENTS TO STD.PLBG.CODE SEC.409.8.2.
 (MIN.1024 SQ.IN.AND 30"WIDE).
  
 PIPING EMBEDDED IN CONCRETE SHALL COMPLY
 W/SBC SECS.1907.3,1907.3.3- 1907.3.5.
 (SEE 3"STACK IN TIE BEAM).
  
 SUBMIT SANITARY ISOMETRIC FOR 2-STORY
 HOUSE.SUBMITTED ISOMETRIC IS FOR SINGLE
 STORY STRUCTURE.SPC 104.2.1.
  
 MIN.SIZE OF DRAINAGE PIPE UNDERGROUND
 SHALL BE 2" PER SPC SEC.714.4.

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status P Date 1999-11-17 Cont ID  
Sent By fknapp Date 1999-11-17 Time 15:03 Rev Time 3.00
Received By fknapp Date 1999-11-17 Time 12:19 Sent To  
Notes
2001-01-08 00:00:00*************PROVISO********************
  
 SBC 104.2.2
  
 1)PROVIDE 2 COPIES OF CURRENT PRODUCT
 APPROVALS FOR:
 FRONT DOORS
 ARCH WINDOWS
 MULLIONS
 GARAGE DOOR
  
 2)PROVIDE DESIGN PRESSURES AT ALL
 EXTERIOR OPENINGS
  
 3)PROVIDE BUCK SIZE AND CONNECTION
 DETAILS
  
 4)SPECIFY APPROVED ANCHORS OF LEDGER
 INTO BEAM
  
 5)CLARIFY FLOOR TRUSS DETAIL WITH SIZE,
 TYPE AND LOCATION OF APPROVED ANCHORS
  
 6)CLARIFY TYPICAL END DETAIL LOCATION
  
 7)PROVIDE STORM PANEL INSALLATION
 SCHEDULE AND KEY PLAN WITH SPECIFIC
 MOUNTING AND ANCHORS TO BE USED UNDER
 SEPERATE PERMIT
  
 ****PLEASE SUBMIT PRIOR TO INSTALLATION*

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status F Date 1999-11-03 Cont ID  
Sent By jgomez Date 1999-11-03 Time 18:35 Rev Time 1.50
Received By jgomez Date 1999-11-03 Time 18:35 Sent To  
Notes
2001-01-08 00:00:00 
 CHECKLIST:
 1-FOUNDATION PLAN DOESN'T MATCH SECOND
 FLOOR FRAMING PLAN BY TRUSS ENGINEER.
 THERE ARE TWO BEARING WALLS THAT ARE
 NOT SHOWN ON FOUNDATION PLAN.
 -REVISE FOUNDATION PLAN AS REQUIRED.
 2-PROVIDE A COMPLETE INTERIOR WALL
 SECTION/DETAIL SHOWING ALL CONNECTORS
 AT TOP AND BOTTOM.
 -ALSO, INDICATE THE DEPTH OF THE
 INTERIOR FOOTER.
 -NOTE THE THE ADDITIONAL BEARING WALLS
 ARE LOCATED BETWEEN THE GARAGE AND THE
 LIVING AREA, THEREFORE, CONSIDERATION
 MUST BE TAKEN AT THE STEP.
 -ALSO, SPECIFY THE SIZE OF HEADERS AND
 QUANTITY OF HEADER STUDS AT INTERIOR
 BEARING WALLS.
 SEC. 104.2.2 CITY AMENDMENTS TO SBC/97
 3-BEDROOM WINDOWS IN SECOND FLOOR DON'T
 MEET THE MINIMUM REQUIREMENTS FOR
 EGRESS. SEC 1005.4.4 SBC 1997.
 4-TRUSS DRAWINGS:
 -PROVIDE TWO COPIES OF ENGINEERED TRUSS
 DRAWINGS, SIGNED, DATED AND SEALED.
 NOTE: DESIGN CRITERIA ACCEPTED WILL BE
 SBC 1997 OR ASCE 7-95 ONLY.
 -ROOF TRUSS CONNECTOR, H-6, SPECIFIED
 ON PLANS IS A WOOD TO WOOD CONNECTOR.
 THE ACTUAL CONNECTION IS CONCRETE BEAM
 TO WOOD TRUSS. REVISE CONNECTOR.
 SEC. 104.2.2 CITY AMENDMENTS.
 5-TWO STORY WALL SECTION DETAIL:
 -PROVIDE FIREBLOCKING AS REQUIRED BY
 SEC 2305 SBC 1997.
 -CLARIFY CONNECTION DETAIL AT BEARING
 OF SECOND FLOOR TRUSSES. CHECK SIZE
 OF LAG BOLT AND SPECIFY CONNECTION OF
 TRUSS TO LEDGER.
 -SPECIFY SIZE OF SECOND FLOOR TRUSSES.
 SEC. 104.2.2 CITY AMENDMENTS.
 6-PROVIDE THE DESIGN PRESSURES AT ALL
 EXTERIOR OPENINGS. SEC 1606 SBC 1997.
 7-PROVIDE DETAIL/SECTION SHOWING
 CONSTRUCTION OF ARCHED OPENINGS.
 -PROVIDE COMPLETE BUCK DETAILS FOR
 GARAGE DOOR, EXTERIOR DOORS AND
 WINDOWS.
 -SPECIFY/CLARIFY IF THE ENDS OF MASONRY
 OPENINGS ARE GOING TO BE REINFORCED
 WITH FILLED CELLS.
 8-PROVIDE COMPLETE CONSTRUCTION DETAILS
 AT ENTRY PORCH. INCLUDING ATTACHMENT
 TO MASONRY WALL.
 9-PROVIDE COMPLETE DETAIL/SECTION THRU
 SECOND FLOOR GUARDRAIL.
 10-PROVIDE COMPLETE SECTION/DETAIL FOR
 AHU SUPPORT.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 1999-10-14 Cont ID  
Sent By fknapp Date 1999-10-14 Time 11:26 Rev Time 2.00
Received By fknapp Date 1999-10-14 Time 11:26 Sent To E
Notes
2001-01-08 00:00:00DENIED:
  
 1)PROVIDE OWNER SIGNATURE ON ENERGY
 CALCULATION.
  
 2)PROVIDE COMPLETE DETAILS OF FLOOR
 TRUSS CONNECTION TO BEARING WALLS.
  
 3)PROVIDE SPECIFIC CONNECTORS TO BE
 USED ON FLOOR AND ROOF TRUSSES.
  
 4)PROVIDE COMPLETE THRU SECTION DETAILS
 OF STAIR CONSTRUCTION.
  
 5)PROVIDE DESIGN PRESSURES FOR ALL
 EXTERIOR OPENINGS.
  
 6)PROVIDE STORM PANEL INSTALLATION
 SCHEDULE AND KEY PLAN WITH SPECIFIC
 MOUNTING AND ANCHORS TO BE USED.
  
 7)PROVIDE 2 CURRENT COPIES OF PRODUCT
 APPROVAL FOR:
 GARAGE DOOR
 FRONT DOOR
 SLIDING GLASS DOOR
  
 SBC-1997 104.2
  
 NOTE: A ORIGINAL SHEET STAMPED BY PB CO.
 FOR IMPACT IS MISSING.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 1999-09-30 Cont ID  
Sent By fknapp Date 1999-09-30 Time 09:01 Rev Time 4.00
Received By fknapp Date 1999-09-29 Time 16:01 Sent To  
Notes
2001-01-08 00:00:00 
  
 DENIED:
  
 1)PROVIDE CURRENT SURVEY SIGN AND SEALED
  
 2)PROVIDE ENERGY CALCULATIONS INCLUDING
 MANUEL J.
  
 3)PROVIDE COMPLETE DETAILS OF FLOOR
 TRUSS CONNECTION TO BEARING WALLS.
  
  
 4)PROVIDE COMPLETE ROOF AND SECOND FLOOR
 FRAMING PLAN.SPECIFY ALL CONNECTORS.
  
 5)PROVIDE COMPLETE THRU SECTION DETAILS
 OF STAIR CONSTRUCTION.
  
 6)PROVIDE DESIGN PRESSURES FOR ALL
 EXTERIOR OPENINGS.
  
 7)PROVIDE STORM PANEL INSTALLATION
 SCHEDULE AND KEY PLAN WITH SPECIFIC
 MOUNTING AND ANCHORS TO BE USED.
  
 8)PROVIDE ADDITIONAL COPIES OF LEGIBLE
 PRODUCT APPROVALS.
  
 SBC-1997 SEC 104.2

Review Stop Z ZONING
Rev No 1 Status P Date 1999-09-17 Cont ID  
Sent By gjoyce Date 1999-09-17 Time 11:18 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved