| 2001-01-08 00:00:00 | **************DENIED******************* |
| | |
| | 1)NOTE:SHOW COMPLETE RISER DIAGRAM. |
| | TO INCLUDE ALL OF THE FOLLOWING: |
| | GROUNDING ELECTRODE CONDUCTOR TO GOT TO |
| | BLDG.STEEL ALSO 250-81 |
| | )INCLUDE GARAGE DOOR OPENER IN LOAD |
| | CALCULATIONS AS IT REQ`S A DEDICATED |
| | CIRCUT.ALSO INCLUDE ON PANEL SCHED. |
| | )INCLUDE BATHROOMS ON PANEL SCHEDULE AS |
| | THEY ALSO REQ,DEDICATED CIRCUTS AS PER |
| | ART:210-52D |
| | )NOTE:GENERAL LIGHTING SHOWS 20AMP |
| | OVERCURRENT PROTECTION TO FEED #14 AWG. |
| | PLEASE MATCH AS PER 310-16 |
| | )ONLY SHOW 15KW HEAT FIGURED IN THE LOAD |
| | CALCULATIONS,BUT SHOW OTHER HEAT STRIP |
| | AT 7.5 KW,,,,PLEASE FIGURE 7.5KW IN |
| | LOAD CALCULATIONS. |
| | 2)NOTE:HOT WATER HEATER,DRYER,WASHER |
| | SHOWN TO BE ALL GFI,,, |
| | 3)NOTE:AS PER 210-52G GFI RECEPT.REQ`D |
| | INSIDE GARAGE. |
| | 4)NOTE:POWDERROOM IN FRONT OF HOUSE |
| | REQ`S GFI REC.AS PER 210-52D |
| | 5)AS PER 1996 NFPA-72 2-2.1.1.1 REQ`S |
| | SMOKE DETECTORS INSIDE AND OUTSIDE |
| | BEDROOMS IN ALL NEW CONSTRUCTION HOMES. |
| | 6)AS PER ART:210-52E GFI RECEPT.REQ`D |
| | FRONT OF DWELLING. |
| | |
| | 7)PRINTS FROM WAUSAU HOMES SHOW FIRST |
| | FLOOR??? IF ADDITIONAL PANEL IS LOCATED |
| | IN SECOND FLOOR THEN IT MUST BE DRAWN |
| | ON RISER DIAGRAM ALSO.215-5 |
| | PLEASE SUBMIT PLANS MARKED AS SECOND |
| | FLOOR ELECTRICAL PLANS.NOTE CODE FOR |
| | SMOKE DETECTORS LISTED ON THESE NOTES |
| | ABOVE. |
| | 8)NOTE SUBMIT AIC RATING OF ALL EQUIP- |
| | -MENT AND BREAKERS BEING USED. AS PER |
| | ARTS:110-9 AND 215-5 |
| | |
| | PLEASE SUBMIT ALL OF THE FOLLOWING. |