Plan Review Details - Permit 99071109
Plan Review Stops For Permit 99071109
Review Stop E ELECTRICAL
Rev No 1 Status P Date 1999-07-28 Cont ID  
Sent By dpalmer Date 1999-07-28 Time 14:51 Rev Time 0.00
Received By dpalmer Date 1999-07-28 Time 14:51 Sent To P
Notes
2001-01-08 00:00:00************PROVISO*******************
  
 NEED AIC RATING OF EQUIPMENT.
 MISSING REC.
 KITCHEN REC.
 110-9 215-5 210-52D 210-52E 210-8-A-6

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-01-21 Cont ID  
Sent By jleech Date 2000-01-21 Time 14:28 Rev Time 0.25
Received By jleech Date 2000-01-21 Time 14:28 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 1999-07-31 Cont ID  
Sent By jleech Date 1999-07-31 Time 09:35 Rev Time 0.50
Received By jleech Date 1999-07-31 Time 09:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 1999-09-10 Cont ID  
Sent By tlarge Date 1999-09-10 Time 09:18 Rev Time 0.50
Received By tlarge Date 1999-09-10 Time 09:18 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 1999-09-10 Cont ID  
Sent By dpalmer Date 1999-07-30 Time 14:51 Rev Time 0.50
Received By tlarge Date 1999-07-30 Time 07:30 Sent To  
Notes
2001-01-08 00:00:00SHOWER DIMENSIONS REQ'D.COMPLY W/COUNTY
 WIDE AMENDMENTS TO SPC.SEC.409.8.2.1.
  
 WET VENTS SHALL RECEIVE DISCHARGE FROM
 FIXTURE DRAINS ONLY.COUNTYWIDE AMENDMENT
 SEC.911.1.3.
  
 SHOWERS ARE NOT PROPERLY VENTED PER
 SPC 901.2.
  
 FIXTURES DOWNSTREAM OF WATER CLOSETS
 SHALL BE VENTED PER SPC SEC.913.2.
  
 MIN.SIZE DRAIN FOR W/M SHALL BE 2" PER
 SPC TABLE 713.1.
  
 CLEARLY SHOW AIR ADMITANCE VALVE ON KIT.
 SINK.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 1999-09-10 Cont ID  
Sent By jgomez Date 1999-09-10 Time 15:02 Rev Time 1.00
Received By jgomez Date 1999-09-10 Time 15:02 Sent To O
Notes
2001-01-08 00:00:00APPROVED WITH PROVISO:
 1-THIS PERMIT DOESN'T INCLUDE THE
 OPTIONAL REAR PORCH.
 2-PROVIDE THE DESIGN PRESSURES AT ALL
 EXTERIOR OPENINGS AS PER SEC.1606 SBC
 3-PROVIDE PRODUCT APPROVALS FOR: BUTT
 GLAZING,FIREPLACE,WINDOW AND DOOR
 MULLIONS, BBQ, ENTRY DOOR ASSEMBLY,
 FIXED WINDOW AT FAMILY AND LIVING ROOM,
 ROOF TILE, SLIDING GLASS DOORS.
 4-PROVIDE SPECIFICATIONS OF HOW
 COMPLYING WITH SECTION 402.7 SGC 1997
 REGARDING INSTALLATION OF GAS APPLIANCE
 IN GARAGE.
 5-PROVIDE COMPLETE INSTALLATION DETAIL
 FOR HUNG AHU. SPECIFY ALL FASTENERS.
 6-PROVIDE COMPLETE SPECIFICATIONS AND
 DETAILS FOR MULLIONS AT FRONT WINDOWS.
 7-PROVIDE ATTIC ACCESS. SEC. 2309.6 SBC
 8-PROVIDE COMPLETE DETAIL/SECTION THRU
 CHIMNEY. SPECIFY ALL CONNECTORS AND
 CLEARANCES. SEC. 104.2.2 CITY AMENDMENT
 9-PROVIDE COMPLETE COLUMN SCHEDULE. SEE
 SHEET S1. SEC. 104.2.2 CITY AMENDMENTS.
 10-PROVIDE COMPLETE SPECIFICATIONS FOR
 CONSTRUCTION AT CEILINGS OF FRONT AND
 BACK PORCHES SEC. 2504.2 SBC 1997 AS
 PER ASTM C926 AND ASTM C1063.
 11-DESIGN LOADS ON SHEET S2 AND DESIGN
 CERTIFICATION FOR WIND LOAD COMPLIANCE
 FORM DON'T MATCH. REVISE AS REQUIRED.
 12-PROVIDE CEILING FANS AS PER CREDIT
 TAKEN IN THE ENERGY CALCULATIONS.
 13-FOOTING F2 IS ENCROACHING INTO THE
 NEIGHBOR'S PROPERTY AT ZERO LOT LINE.
 REVISE AS REQUIRED.
 14-STORM PANELS: REVISE INSTALLATION
 SCHEDULE. SEE OPENINGS #1,2,5,6,7
 15-SEE FLOOR PLANS FOR ADDITIONAL
 COMMENTS.
 16-PROVIDE COMPLETE SPECIFICATIONS AND
 DETAILS FOR BUTT GLAZING AS PER SECTION
 2405.3 AND 2406 SBC 1997.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 1999-09-10 Cont ID  
Sent By jgomez Date 1999-09-04 Time 16:46 Rev Time 3.00
Received By jgomez Date   Time   Sent To O
Notes
2001-01-08 00:00:00CHECKLIST:
 1-PAY IMPACT FEES TO THE COUNTY.
 2-ALL DRAWINGS TO BE SIGNED AND SEALED
 BY ARCHITECT.SEC 104.2.1 OF CITY
 AMENDMENTS TO SBC 1997.
 3-SPECIFY IF THE OPTIONAL REAR PORCH IS
 GOING TO BE BUILT ON THIS HOUSE, IN
 ORDER TO PROPERLY ASSESS THE RADON FEE
 AND VALUATION OF PROJECT.
 ALSO PROVIDE COMPLETE SPECIFICATIONS
 AND CONSTRUCTION DETAILS.
 4-PROVIDE THE DESIGN PRESSURES AT ALL
 EXTERIOR OPENINGS.SEC 1606 SBC 1997.
 5-PROVIDE PRODUCT APPROVALS FOR:
 BUTT GLAZING,FIRE PLACE,WINDOW AND
 DOOR MULLIONS,BBQ,ENTRY DOOR ASSEMBLY,
 FIXED WINDOW AT FAMILY AND LIVING ROOM
 ROOF TILE,SLIDING GLASS DOORS.
 6-PROVIDE SPECIFICATIONS OF HOW TO
 COMPLY WITH SECTION 402.7 SGC 1997
 REGARDING INSTALLATION OF GAS
 APPLIANCES IN GARAGE.
 7-PROVIDE COMPLETE INSTALLATION DETAIL
 FOR HUNG AHU. SPECIFY ALL CONNECTORS.
 8-PROVIDE INSTALLATION DETAIL FOR
 MULLIONS AT FRONT WINDOWS.
 9-PROVIDE ATTIC ACCESS.SEC 2309.6 SBC/97
 10-PROVIDE COMPLETE DETAIL/SECTION FOR
 CHIMNEY CONSTRUCTION.
 11-PROVIDE COLUMN SCHEDULE.SEE SHEET S1.
 12-SPECIFY CEILING CONSTRUCTION AT FRONT
 AND REAR PORCHES. SEC 2504.2 SBC 1997.
 13-DESIGN LOADS ON SHEET S2 AND DESIGN
 CERTIFICATION FOR WIND LOAD COMPLIANCE
 FORM ARE DIFFERENT.REVISE AS REQUIRED.
 NOTE: THIS FORM NEED NOT TO BE FILLED
 UP SEPARATELY IF INFORMATION ON FORM
 IS SPECIFIED ON DRAWINGS.
 14-SPECIFY THE CEILING FANS AS PER
 CREDIT TAKEN IN ENERGY CALCULATIONS.
 15-FOOTING F2 IS ENCROACHING INTO THE
 NEIGHBORS'S PROPERTY AT ZERO LOT LINE.
 16-STORM PANELS: REVISE INSTALLATION
 SCHEDULE. SEE OPENINGS #1,2,5,6 AND 7.
  
 17-SEE FLOOR PLANS FOR ADDITIONAL
 COMMENTS.
 18-REVISE ENERGY CALCULATIONS.
 SEE COMMENTS.
 19-PROVIDE COMPLETE SPECIFICATIONS AND
 DRAWINGS FOR BUTT GLAZING INSTALLATION
  
  
 NOTE:
 PLEASE RETURN REVIEWED SET IN ORDER TO
 EXPEDITE THE REVIEW PROCESS.

Review Stop Z ZONING
Rev No 1 Status P Date 1999-07-19 Cont ID  
Sent By gjoyce Date 1999-07-19 Time 08:16 Rev Time 0.50
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved