| 2023-07-10 13:04:59 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) THERE IS AN INDICATION OF A NEW DDCV BUT NO TO |
| | CONFIRM THE PROPOSED MEET CITY STANDARDS. |
| | |
| | NFPA |
| | |
| | 1.7.12 PLANS AND SPECIFICATIONS. |
| | |
| | 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| | PLANS AND |
| | SPECIFICATIONS TO ENSURE COMPLIANCE WITH APPLICABLE |
| | CODES AND |
| | STANDARDS. |
| | |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE PRODUCT |
| | SPEC SHEETS OF THE PROPOSED DDCV. |
| | |
| | |
| | 2) THERE ARE MANY DDCV'S SHOWN ON THE SITE PLAN. |
| | |
| | PLEASE HIGHLIGHT OR CLOUD THE CORRECT #'D DDCV FOR EASY |
| | IDENTIFICATION OF THIS INSTALL AND ALL FUTURE INSTALLS. |
| | |
| | PER NFPA 1 |
| | |
| | 1.7.12 PLANS AND SPECIFICATIONS. |
| | |
| | 1.7.12.3 THE CONSTRUCTION DOCUMENTS FOR EACH PHASE |
| | SHALL BE COMPLETE IN THEMSELVES, SO THAT REVIEW AND |
| | INSPECTION CAN PROPERLY BE MADE. PRELIMINARY PLANS OF |
| | THE TOTAL BUILDING SHALL BE SUBMITTED WITH THE |
| | CONSTRUCTION DOCUMENTS, AND WITH SUFFICIENT DETAIL, SO |
| | THAT PROPER EVALUATION CAN BE MADE. AREAS AND ITEMS NOT |
| | INCLUDED IN THE PHASE TO BE PERMITTED SHALL BE SHOWN AS |
| | NOT INCLUDED. [5000:1.7.6.3.3.3] |
| | |
| | PLEASE HIGHLIGHT THE PROPOSED DDCV UNDER THIS PERMIT. |
| | |
| | |
| | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |