Plan Review Details - Permit 23060433
Plan Review Stops For Permit 23060433
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2023-06-13 Cont ID  
Sent By cpuell Date 2023-06-13 Time 16:49 Rev Time 0.00
Received By cpuell Date 2023-06-13 Time 16:49 Sent To  
Notes
2023-06-13 16:49:59ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2023-07-11 Cont ID  
Sent By pvalenti Date 2023-07-11 Time 16:29 Rev Time 0.00
Received By pvalenti Date 2023-07-11 Time 16:19 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2023-06-20 Cont ID  
Sent By pvalenti Date 2023-06-20 Time 14:53 Rev Time 0.00
Received By pvalenti Date 2023-06-20 Time 14:25 Sent To  
Notes
2023-06-20 14:55:05PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 ASBESTOS REVIEW DENIED:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION
 -RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-07-17 Cont ID  
Sent By pvalenti Date 2023-07-17 Time 13:58 Rev Time 0.00
Received By pvalenti Date 2023-07-17 Time 13:51 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-07-11 Cont ID  
Sent By pvalenti Date 2023-07-11 Time 16:30 Rev Time 0.00
Received By pvalenti Date 2023-07-11 Time 16:19 Sent To  
Notes
2023-07-11 16:30:55PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
  
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 6. COMPLETE THE DEMO DEBRIS FORM. THE CUBIC YARD
 ESTIMATE SECTION OF THE FORM HAS NOT BEEN COMPLETED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-06-20 Cont ID  
Sent By pvalenti Date 2023-06-20 Time 14:45 Rev Time 0.00
Received By pvalenti Date 2023-06-20 Time 14:25 Sent To  
Notes
2023-06-20 14:53:06PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT & FINAL PLUMBING
 INSPECTION FOR THE SEWER LATERAL CAPPING PERMIT ARE
 REQUIRED.
 SCHEDULE A FINAL PLUMBING #703 INSPECTION FOR PERMIT #
 23050586 AND LET ME KNOW WHEN THIS INSPECTION HAS BEEN
 APPROVED.
 6. COMPLETE THE DEMO DEBRIS FORM (CUBIC YARD ESTIMATE)
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-06-23 Cont ID  
Sent By cseifer Date 2023-06-23 Time 13:35 Rev Time 0.00
Received By cseifer Date 2023-06-23 Time 13:35 Sent To  
Notes
2023-06-23 13:35:34PASSED WITH PROVISO: ADDRESS OUTSTANDING BUILDING
 DEPARTMENT COMMENTS AND PER EMAIL WITH APPLICANT, SILT
 FENCE AND A TEMPORARY CHAIN LINK FENCE WILL BE
 CONSTRUCTED.
  
 THANKS,
 CHLOE SEIFER, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2023-06-22 Cont ID  
Sent By amhamilt Date 2023-06-22 Time 15:28 Rev Time 0.00
Received By amhamilt Date 2023-06-22 Time 15:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-07-17 Cont ID  
Sent By pvalenti Date 2023-07-17 Time 13:58 Rev Time 0.00
Received By pvalenti Date 2023-07-17 Time 13:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-11 Cont ID  
Sent By pvalenti Date 2023-07-11 Time 16:41 Rev Time 0.00
Received By pvalenti Date 2023-07-10 Time 17:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-26 Cont ID  
Sent By aoliver Date 2023-06-26 Time 09:33 Rev Time 0.00
Received By aoliver Date 2023-06-09 Time 07:53 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2023-06-20 Cont ID  
Sent By pvalenti Date 2023-06-20 Time 14:55 Rev Time 0.00
Received By pvalenti Date 2023-06-20 Time 14:25 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2023-06-22 Cont ID  
Sent By amhamilt Date 2023-06-22 Time 15:28 Rev Time 0.00
Received By amhamilt Date 2023-06-22 Time 15:28 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved