|
 |
 |
 |
 |
 |
Plan Review Details - Permit 23051632
| Plan Review Stops For Permit 23051632 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2023-06-01 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-06-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-06-01 |
Time |
09:42 |
Sent To |
|
|
| Notes |
| 2023-06-01 10:07:43 | FIRE PROVISO: | | | | | | FIRE SPRINKLER PIPE INSPECTION ALSO REQUIRED | | | CODE: 603 | | | | | | CITY OF WEST PALM BEACH | | | | | | PERMIT # 23051632 | | | | | | TEST AT WORKING PRESSURE FOR 2 HOURS PER NFPA 13 | | | | | | CONTRACTOR TO PROVIDE FOR WORKING PRESSURE VERIFICATION | | | (I.E. PRESSURE GAUGE 2HRS) AND/OR SYSTEM IS CHARGED/ | | | DISCHARGED UNDER WORKING PRESSURE. (I.E. VISUAL FOR | | | LEAKS | | | & INSPECTOR DRAIN AFTER 2 HRS) | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-06-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-06 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-06 |
Time |
14:36 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-05 |
Time |
17:54 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-05-31 |
Time |
12:29 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-06-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-06 |
Time |
14:36 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-06 |
Time |
14:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-05 |
Time |
17:52 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-05 |
Time |
17:49 |
Sent To |
|
|
| Notes |
| 2023-06-05 17:53:54 | SIGNATURE REVIEW: | | | | | | 1- ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE | | | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY | | | FBPE. | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | | MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED. | | | | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |