| Plan Review Stops For Permit 23051185 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2023-07-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-07-06 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-07-06 |
Time |
10:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2023-07-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-07-05 |
Time |
10:18 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-07-05 |
Time |
10:08 |
Sent To |
|
|
| Notes |
| 2023-07-05 10:19:50 | RESIDENTIAL(R3) REROOF FIFTH BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #23051185 | | | 1827 PINEHURST DR | | | | | | PREVIOUS COMMENT: | | | 2-RAS 117 CALCULATIONS SUBMITTED: | | | REVISED CALCULATIONS STILL SHOW THE DESIGN PRESSURES | | | LOWER THAN THE DESIGN PRESSURES SHOWN ON THE FIRST | | | CALCULATIONS SUBMITTED WHEN THE BUILDING EXPOSURE WAS | | | ASSUMED TO BE EXPOSURE B. REVISE AS REQUIRED. | | | ENGINEER TO CLARIFY WHY THE DESIGN PRESSURES ARE SO LOW | | | COMPARED TO TABLE R301.2(2) AND TABLE R301.2(2) | | | FBC-RESIDENTIAL. | | | ALSO, ENGINEER TO PROVIDE THE DESIGN PRESSURES FOR ALL | | | FOUR ROOF ZONES. | | | SEC. R301.2.1 FBC-RESIDENTIAL. SEC. 107.2.1.2 CITY | | | AMENDMENTS. | | | | | | RESPONSE: | | | CALCULATIONS WERE REVISED AND FASTENER SPACING | | | SPECIFIED FOR ZONE 1' DOESN'T MATCH FASTENER SPACING | | | FOR FASTENING OPTION #2 FOR -52.5 PSF SHOWN ON NOA | | | 18-0919.12 AS SPECIFIED BY THE ENGINEER ON PAGE 2 OF | | | WIND UPLIFT CALCULATIONS SUBMITTED. REVISE AS REQUIRED | | | TO MATCH. NOTE: COORDINATE ENHANCED NAILING FOR THE | | | OTHER ZONES AS REQUIRED. | | | SEC. R301.2.1 FBC-RESIDENTIAL. SEC. 107.2.1.2 CITY | | | AMENDMENTS. | | | | | | 3- DIGITAL SIGNATURE REVIEW: | | | A)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. THE TEXT BOX LANGUAGE MUST BE | | | IDENTICAL TO THE SAMPLES PUBLISHED BY FBPE. SEE FBPE.OR | | | G/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCUMENTS/... | | | AND REVISE AS REQUIRED TO MATCH. | | | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. | | | | | | B)IT IS NOT CLEAR IF THE DOCUMENT IS DIGITALLY SIGNED | | | OR ELECTRONICALLY SIGNED. CHECK THE TEXT BOX LANGUAGE . | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | | MENTS/... | | | | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | 61G15-23.005 PROCEDURES FOR ELECTRONICALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2023-06-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-27 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-27 |
Time |
13:26 |
Sent To |
|
|
| Notes |
| 2023-06-27 15:36:41 | RESIDENTIAL(R3) REROOF FOURTH BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #23051185 | | | 1827 PINEHURST DR | | | | | | PREVIOUS COMMENT: | | | 2-RAS 117 CALCULATIONS SUBMITTED: | | | ENGINEER TO CLARIFY WHY THE DESIGN PRESSURES SHOWN ON | | | THE REVISED RAS 117 CALCULATIONS ARE LOWER FOR BUILDING | | | EXPOSURE "C" THAN THE DESIGN PRESSURES GIVEN FOR | | | EXPOSURE "B". DESIGN PRESSURES CAN NOT BE LOWER. | | | PROVIDE CALCULATIONS. | | | SEC. R301.2.1 FBC-RESIDENTIAL. SEC. 107.2.1.2 CITY | | | AMENDMENTS. | | | | | | RESPONSE: | | | REVISED CALCULATIONS STILL SHOW THE DESIGN PRESSURES | | | LOWER THAN THE DESIGN PRESSURES SHOWN ON THE FIRST | | | CALCULATIONS SUBMITTED WHEN THE BUILDING EXPOSURE WAS | | | ASSUMED TO BE EXPOSURE B. REVISE AS REQUIRED. | | | ENGINEER TO CLARIFY WHY THE DESIGN PRESSURES ARE SO LOW | | | COMPARED TO TABLE R301.2(2) AND TABLE R301.2(2) | | | FBC-RESIDENTIAL. | | | ALSO, ENGINEER TO PROVIDE THE DESIGN PRESSURES FOR ALL | | | FOUR ROOF ZONES. | | | SEC. R301.2.1 FBC-RESIDENTIAL. SEC. 107.2.1.2 CITY | | | AMENDMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-06-20 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-20 |
Time |
10:11 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-16 |
Time |
18:49 |
Sent To |
|
|
| Notes |
| 2023-06-20 10:12:03 | RESIDENTIAL(R3) REROOF THIRD BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #23051185 | | | 1827 PINEHURST DR | | | | | | 2- FLAT ROOF NOA 18-0919.12 SUBMITTED: SELECTED | | | ASSEMBLY SYSTEM TYPE E(4) ON PAGE 57 OF 67 DOESN'T MEET | | | THE DESIGN PRESSURES FOR ALL ROOF ZONES. PROVIDE SIGNED | | | AND SEALED RAS 117 CALCULATIONS FOR NAIL ENHANCING AT | | | PERIMETER AND CORNER AREAS AS REQUIRED BY GENERAL | | | LIMITATION #7 ON LAST PAGE OF NOA. NEED THE | | | CALCULATIONS TO MEET THE DESIGN PRESSURES REQUIRED BY | | | SEC. R301.2.1 FBC-RESIDENTIAL. | | | | | | PREVIOUS COMMENT: | | | 2-RAS 117 CALCULATIONS SUBMITTED: | | | A)THE BUILDING EXPOSURE IS "C" NOT "B". REVISE AS | | | REQUIRED AND REVISE THE DESIGN PRESSURES ACCORDINGLY. | | | SEC. R301.2.1.4 FBC-RESIDENTIAL. SEC. R301.2.1.2 | | | FBC-RESIDENTIAL. | | | | | | RESPONSE: | | | ENGINEER TO CLARIFY WHY THE DESIGN PRESSURES SHOWN ON | | | THE REVISED RAS 117 CALCULATIONS ARE LOWER FOR BUILDING | | | EXPOSURE "C" THAN THE DESIGN PRESSURES GIVEN FOR | | | EXPOSURE "B". DESIGN PRESSURES CAN NOT BE LOWER. | | | PROVIDE CALCULATIONS. | | | SEC. R301.2.1 FBC-RESIDENTIAL. SEC. 107.2.1.2 CITY | | | AMENDENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-05 |
Time |
13:01 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-02 |
Time |
18:05 |
Sent To |
|
|
| Notes |
| 2023-06-05 13:01:53 | RESIDENTIAL(R3) SECOND REROOF BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #23051185 | | | 1827 PINEHURST DR | | | | | | 2- FLAT ROOF NOA 18-0919.12 SUBMITTED: SELECTED | | | ASSEMBLY SYSTEM TYPE E(4) ON PAGE 57 OF 67 DOESN'T MEET | | | THE DESIGN PRESSURES FOR ALL ROOF ZONES. PROVIDE SIGNED | | | AND SEALED RAS 117 CALCULATIONS FOR NAIL ENHANCING AT | | | PERIMETER AND CORNER AREAS AS REQUIRED BY GENERAL | | | LIMITATION #7 ON LAST PAGE OF NOA. NEED THE | | | CALCULATIONS TO MEET THE DESIGN PRESSURES REQUIRED BY | | | SEC. R301.2.1 FBC-RESIDENTIAL. | | | | | | RESPONSE: | | | RAS 117 CALCULATIONS SUBMITTED: | | | A)THE BUILDING EXPOSURE IS "C" NOT "B". REVISE AS | | | REQUIRED AND REVISE THE DESIGN PRESSURES ACCORDINGLY. | | | SEC. R301.2.1.4 FBC-RESIDENTIAL. SEC. R301.2.1.2 | | | FBC-RESIDENTIAL. | | | | | | B)BASED ON CALCULATED DESIGN PRESSURES, THE SELECTED | | | ASSEMBLY CAN NOT BE USED BECAUSE ACCORDING TO SEC. 8.1 | | | OF RAS 117, THE DESIGN PRESSURES OF THE PRODUCT | | | APPROVAL SHOULD BE APPLICABLE TO ZONE 1' OR 1. REVISE | | | AS REQUIRED. | | | | | | C)ENGINEER OF RECORD TO PROVIDE SKETCH SHOWING THE | | | DIMENSIONS FOR ALL THE ROOF ZONES APPLICABLE TO THIS | | | PROJECT AS REQUIRED BY NEW ROOF ZONES ON FIGURE | | | R301.2(7) FBC-RESIDENTIAL. | | | | | | 3- ENGINEER'S SIGNATURE REVIEW: | | | A) ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. THE TEXT BOX LANGUAGE MUST BE | | | IDENTICAL TO THE SAMPLES PUBLISHED BY FBPE. SEE FBPE.OR | | | G/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCUMENTS/. AND | | | REVISE AS REQUIRED TO MATCH. | | | | | | B) IT IS NOT CLEAR IF THE DOCUMENT IS DIGITALLY SIGNED | | | OR ELECTRONICALLY SIGNED. CHECK THE TEXT BOX LANGUAGE . | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGIN | | | EERING-DOCUMENTS/ | | | | | | 61G15-23.005 PROCEDURES FOR ELECTRONICALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-05-25 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-05-25 |
Time |
15:31 |
Sent To |
|
|
| Notes |
| 2023-05-25 15:57:30 | RESIDENTIAL (R3) REROOF BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #23051185 | | | 1827 PINEHURST DR | | | | | | NOTE: | | | LEVEL 1 ALTERATION. SEC. 602 FBC-EXISTING BUILDING. | | | SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK SHALL | | | COMPLY WITH THE MATERIALS AND METHODS REQUIREMENTS IN | | | THE FLORIDA BUILDING CODE. | | | | | | 1- SHINGLES ROOFING UNDERLAYMENT | | | PROVIDE SPECIFICATIONS SHOWING HOW COMPLYING WITH THE | | | NEW 2020 CODE REQUIREMENT FOR ROOFING UNDERLAYMENT. | | | SEC. R905.1.1.1 FBC-RESIDENTIAL. | | | NOTE: CLEARLY SPECIFY WHICH METHOD OF SEC. R905.1.1.1 | | | FBC-RESIDENTIAL IS GOING TO BE USED. AND PROVIDE | | | PRODUCT APPROVAL AS REQUIRED BY F.A.C. 61G20-3.001 | | | | | | 2- FLAT ROOF NOA 18-0919.12 SUBMITTED: SELECTED | | | ASSEMBLY SYSTEM TYPE E(4) ON PAGE 57 OF 67 DOESN'T MEET | | | THE DESIGN PRESSURES FOR ALL ROOF ZONES. PROVIDE SIGNED | | | AND SEALED RAS 117 CALCULATIONS FOR NAIL ENHANCING AT | | | PERIMETER AND CORNER AREAS AS REQUIRED BY GENERAL | | | LIMITATION #7 ON LAST PAGE OF NOA. NEED THE | | | CALCULATIONS TO MEET THE DESIGN PRESSURES REQUIRED BY | | | SEC. R301.2.1 FBC-RESIDENTIAL. | | | | | | 3- CONTRACTOR REROOFING AFFIDAVIT IS NOT ACCEPTABLE AT | | | PLAN REVIEW. THIS IS SUPPOSED TO BE DONE AFTER THE WORK | | | IS DONE. COORDINATE WITH CHIEF BUILDING INSPECTOR | | | BEFORE DOING THE JOB FOR AFFIDAVIT REQUIREMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
F |
Date |
2023-07-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-07-06 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-07-06 |
Time |
10:35 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2023-07-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-07-05 |
Time |
10:20 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-07-05 |
Time |
10:08 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-06-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-27 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-27 |
Time |
13:26 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-06-20 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-20 |
Time |
10:12 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-12 |
Time |
09:04 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-05 |
Time |
13:01 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-02 |
Time |
18:05 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-05-25 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-05-23 |
Time |
12:18 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2023-07-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-07-06 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-07-06 |
Time |
11:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2023-07-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-07-05 |
Time |
10:20 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-07-05 |
Time |
10:19 |
Sent To |
|
|
| Notes |
| 2023-07-05 10:20:44 | DIGITAL SIGNATURE REVIEW: | | | 1- ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. THE TEXT BOX LANGUAGE MUST BE | | | IDENTICAL TO THE SAMPLES PUBLISHED BY FBPE. SEE FBPE.OR | | | G/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCUMENTS/... | | | AND REVISE AS REQUIRED TO MATCH. | | | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. | | | | | | 2- IT IS NOT CLEAR IF THE DOCUMENT IS DIGITALLY SIGNED | | | OR ELECTRONICALLY SIGNED. CHECK THE TEXT BOX LANGUAGE . | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | | MENTS/... | | | | | | | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | 61G15-23.005 PROCEDURES FOR ELECTRONICALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2023-06-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-27 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-27 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2023-06-27 16:00:40 | SIGNATURE REVIEW: | | | 1- ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. THE TEXT BOX LANGUAGE MUST BE | | | IDENTICAL TO THE SAMPLES PUBLISHED BY FBPE. SEE FBPE.OR | | | G/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCUMENTS/... | | | AND REVISE AS REQUIRED TO MATCH. | | | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. | | | | | | 2- IT IS NOT CLEAR IF THE DOCUMENT IS DIGITALLY SIGNED | | | OR ELECTRONICALLY SIGNED. CHECK THE TEXT BOX LANGUAGE . | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | | MENTS/... | | | | | | | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | 61G15-23.005 PROCEDURES FOR ELECTRONICALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-06-12 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-06-12 |
Time |
08:49 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-06-12 |
Time |
08:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-06-05 |
Time |
13:23 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-06-05 |
Time |
13:17 |
Sent To |
|
|
| Notes |
| 2023-06-05 13:23:48 | SIGNATURE REVIEW: | | | 1- ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. THE TEXT BOX LANGUAGE MUST BE | | | IDENTICAL TO THE SAMPLES PUBLISHED BY FBPE. SEE FBPE.OR | | | G/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCUMENTS/... | | | AND REVISE AS REQUIRED TO MATCH. | | | | | | 2- IT IS NOT CLEAR IF THE DOCUMENT IS DIGITALLY SIGNED | | | OR ELECTRONICALLY SIGNED. CHECK THE TEXT BOX LANGUAGE . | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | | MENTS/... | | | | | | 61G15-23.005 PROCEDURES FOR ELECTRONICALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | |
|
|