Plan Review Details - Permit 23051019
Plan Review Stops For Permit 23051019
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-07-28 Cont ID  
Sent By rmcphers Date 2023-07-28 Time 09:21 Rev Time 0.00
Received By rmcphers Date 2023-07-28 Time 09:21 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2023-06-26 Cont ID  
Sent By rmcphers Date 2023-06-26 Time 16:33 Rev Time 0.00
Received By rmcphers Date 2023-06-26 Time 16:33 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-08-09 Cont ID  
Sent By pleduc Date 2023-08-09 Time   Rev Time 0.00
Received By pleduc Date 2023-08-09 Time 11:17 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2023-05-24 Cont ID  
Sent By pleduc Date 2023-05-24 Time   Rev Time 0.00
Received By pleduc Date 2023-05-24 Time 11:01 Sent To  
Notes
2023-05-24 11:21:27THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE IS NO INDICATION OF THE LOCATION OF THE
 PROPOSED STRUCTURE WITHIN THE SITE PLAN INCLUIDNG
 DIMENSIONS TO ALL BUILDINGS AND PROPERTY LINES.
  
 PER NFPA 1
  
 1.7.12 PLANS AND SPECIFICATIONS.
  
 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH
 APPLICABLE CODES AND STANDARDS
  
 FOR THE OFFICIAL RECORD, PLEASE PROVIDE A DETAILED SITE
 PLAN.
  
  
 2) THERE IS NO INDICATION OF THE PROPOSED USE OF THE
 STRUCTURE.
  
 PER NFPA 1
  
 1.7.12 PLANS AND SPECIFICATIONS.
  
 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH
 APPLICABLE CODES AND STANDARDS
  
  
 FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE PROPOSED
 USE OF THE STRUCTURE.
  
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By amcgrego Date 2023-07-27 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-26 Cont ID  
Sent By rmcphers Date 2023-06-26 Time 16:34 Rev Time 0.00
Received By rmcphers Date 2023-05-23 Time 16:32 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2023-06-26 Cont ID  
Sent By rmcphers Date 2023-06-26 Time 16:33 Rev Time 0.00
Received By rmcphers Date 2023-06-26 Time 16:33 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2023-08-10 Cont ID  
Sent By llouie Date 2023-08-10 Time   Rev Time 0.00
Received By llouie Date 2023-08-10 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2023-06-26 Cont ID  
Sent By llouie Date 2023-06-26 Time   Rev Time  
Received By llouie Date 2023-06-26 Time   Sent To  
Notes
2023-06-26 10:04:15** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR IN ON THE PLANS WHERE
 APPLICABLE:
  
 1.) IT APPEARS THAT THE LOCATION OF THE CANOPY IS IN AN
 AREA WHERE THERE IS PARKING PROVIDED. IT IS NOT CLEAR
 IF THIS PARKING WILL BE ELIMINATED. IF PARKING IS TO BE
 ELIMINATED AS A RESULT OF THE SCOPE OF WORK, THEN
 PARKING CALCULATIONS FOR THE PROPERTY WILL NEED TO BE
 PROVIDED.
  
 2.) SECTIONAL DRAWINGS, SHOWING THE HEIGHT AND
 CLEARANCE OF THE PROPOSED CANOPY REQUIRED.
  
  
 NOTES:
  
 * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * CONTATC LINDA LOUIE @ 561.822.1458 IF THERE ARE
 QUESTIONS.
  
 * Z = GC/POR
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved