Plan Review Details - Permit 23050885
Plan Review Stops For Permit 23050885
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-06-21 Cont ID  
Sent By rmcphers Date 2023-06-21 Time 15:30 Rev Time 0.00
Received By rmcphers Date 2023-06-21 Time 15:30 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-06-08 Cont ID  
Sent By rmcphers Date 2023-06-08 Time 14:50 Rev Time 0.00
Received By rmcphers Date 2023-06-08 Time 14:50 Sent To  
Notes
2023-06-08 15:00:58EXTERIOR RENOVATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE SHOW THE ADDED WOOD SIDING DETAILS WALL
 WEATHER RESISTANCE, SIDING ATTACHMENTS ETC. - FBC 1609
 AND 1403.2
  
 2) THE WINDOW AND DOOR ENGINEERING NEEDS TO BE SIGNED
 BY THOMAS TWOMEY P.E. - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-06-21 Cont ID  
Sent By pleduc Date 2023-06-21 Time   Rev Time 0.00
Received By pleduc Date 2023-06-21 Time 12:21 Sent To  
Notes
2023-06-21 12:22:16FIRE PROVISO:
  
 ACCESS CONTROL SHALL BE INSTALLED AND INSPECTED UNDER
 SEPARATE PERMIT AND SHOP DRAWINGS
  
 EXIT HARDWARE SHALL BE AS REQUIRED UNDER NFPA 101,
 MEANS OF EGRESS INCLUDING PUSH BAS, LOCKS & LATCHES.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2023-05-22 Cont ID  
Sent By pleduc Date 2023-05-22 Time   Rev Time 0.00
Received By pleduc Date 2023-05-22 Time 11:38 Sent To  
Notes
2023-05-22 11:48:00FIRE PROVISO:
  
 ACCESS CONTROL SHALL BE INSTALLED AND INSPECTED UNDER
 SEPARATE PERMIT AND SHOP DRAWINGS
  
 EXIT HARDWARE SHALL BE AS REQUIRED UNDER NFPA 101,
 MEANS OF EGRESS INCLUDING PUSH BAS, LOCKS & LATCHES.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-06-21 Cont ID  
Sent By rmcphers Date 2023-06-21 Time 15:30 Rev Time 0.00
Received By rmcphers Date 2023-06-16 Time 09:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-08 Cont ID  
Sent By rmcphers Date 2023-06-08 Time 15:03 Rev Time 0.00
Received By rmcphers Date 2023-05-18 Time 11:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-06-21 Cont ID  
Sent By rmcphers Date 2023-06-21 Time 15:30 Rev Time 0.00
Received By rmcphers Date 2023-06-21 Time 15:30 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-06-08 Cont ID  
Sent By rmcphers Date 2023-06-08 Time 15:01 Rev Time 0.00
Received By rmcphers Date 2023-06-08 Time 15:01 Sent To  
Notes
2023-06-08 15:02:00SIGNATURE REVI
  
 CORRECTIONS NEEDED -
  
 1) THE WINDOW AND DOOR ENGINEERING NEEDS TO BE SIGNED
 BY THOMAS TWOMEY P.E. - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).

Review Stop Z ZONING
Rev No 1 Status P Date 2023-06-27 Cont ID  
Sent By vbroglia Date 2023-06-27 Time 09:00 Rev Time 0.00
Received By vbroglia Date 2023-06-27 Time 09:00 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved