Plan Review Details - Permit 23050508
Plan Review Stops For Permit 23050508
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2023-06-28 Cont ID  
Sent By rmcphers Date 2023-06-28 Time 09:27 Rev Time 0.00
Received By rmcphers Date 2023-06-28 Time 09:27 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2023-06-23 Cont ID  
Sent By rmcphers Date 2023-06-23 Time 15:38 Rev Time 0.00
Received By rmcphers Date 2023-06-23 Time 15:38 Sent To  
Notes
2023-06-23 15:41:28REPLACE WALKWAY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 PLEASE SHOW ON THE DRAWING THE ACCESSIBLE PATH FROM THE
 ACCESSIBLE PARKING SPACE TO THE INTERIOR OF THE
 BUILDING (WHERE A WHEEL CHAIR CAN GET FROM THE PARKING
 SPACE TO THE INTERIOR OF THE BUILDING)
  
 1) IS THIS NEW WALKWAY LEVEL WITH THE BUILDING ENTRY ?
 - PLEASE SHOW THE ACCESSIBLE ENTRY TO THE BUILDING -
 FBC A 202.3.3 BARRIERS AT COMMON OR EMERGENCY ENTRANCES
 AND EXITS.
 BARRIERS AT COMMON OR EMERGENCY ENTRANCES AND EXITS OF
 BUSINESS ESTABLISHMENTS CONDUCTING BUSINESS WITH THE
 GENERAL PUBLIC THAT ARE EXISTING, UNDER CONSTRUCTION,
 OR UNDER CONTRACT FOR CONSTRUCTION WHICH WOULD PREVENT
 A PERSON FROM USING SUCH ENTRANCES OR EXITS SHALL BE
 REMOVED.
  
 PLEASE EMAIL ME WITH ANY QUESTIONS.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-06-02 Cont ID  
Sent By rmcphers Date 2023-06-02 Time 15:39 Rev Time 0.00
Received By rmcphers Date 2023-06-02 Time 15:39 Sent To  
Notes
2023-06-02 15:39:45REPLACE WALKWAY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) IS THIS NEW WALKWAY LEVEL WITH THE BUILDING ENTRY ?
 - PLEASE SHOW THE ACCESSIBLE ENTRY TO THE BUILDING -
 FBC A 202.3.3 BARRIERS AT COMMON OR EMERGENCY ENTRANCES
 AND EXITS.
 BARRIERS AT COMMON OR EMERGENCY ENTRANCES AND EXITS OF
 BUSINESS ESTABLISHMENTS CONDUCTING BUSINESS WITH THE
 GENERAL PUBLIC THAT ARE EXISTING, UNDER CONSTRUCTION,
 OR UNDER CONTRACT FOR CONSTRUCTION WHICH WOULD PREVENT
 A PERSON FROM USING SUCH ENTRANCES OR EXITS SHALL BE
 REMOVED.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-05-30 Cont ID  
Sent By rmcphers Date 2023-05-30 Time 14:30 Rev Time 0.00
Received By rmcphers Date 2023-05-30 Time 14:25 Sent To  
Notes
2023-05-30 14:30:08REPLACE WALKWAY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) IS THIS NEW WALKWAY LEVEL WITH THE BUILDING ENTRY ?
 - PLEASE SHOW THE ACCESSIBLE ENTRY TO THE BUILDING -
 FBC A 202.3.3 BARRIERS AT COMMON OR EMERGENCY ENTRANCES
 AND EXITS.
 BARRIERS AT COMMON OR EMERGENCY ENTRANCES AND EXITS OF
 BUSINESS ESTABLISHMENTS CONDUCTING BUSINESS WITH THE
 GENERAL PUBLIC THAT ARE EXISTING, UNDER CONSTRUCTION,
 OR UNDER CONTRACT FOR CONSTRUCTION WHICH WOULD PREVENT
 A PERSON FROM USING SUCH ENTRANCES OR EXITS SHALL BE
 REMOVED.
  
 2) SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-07-03 Cont ID  
Sent By cseifer Date 2023-07-03 Time 12:23 Rev Time 0.00
Received By cseifer Date 2023-07-03 Time 12:23 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-06-09 Cont ID  
Sent By lquinone Date 2023-06-09 Time 07:38 Rev Time 0.00
Received By lquinone Date 2023-06-09 Time 07:38 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-05-19 Cont ID  
Sent By lquinone Date 2023-05-19 Time 15:18 Rev Time 0.00
Received By lquinone Date 2023-05-19 Time 15:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-07-05 Cont ID  
Sent By aoliver Date 2023-07-05 Time 08:12 Rev Time 0.00
Received By aoliver Date 2023-06-27 Time 10:20 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-06-23 Cont ID  
Sent By rmcphers Date 2023-06-23 Time 15:42 Rev Time 0.00
Received By rmcphers Date 2023-06-22 Time 07:57 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-06-21 Cont ID  
Sent By aoliver Date 2023-06-21 Time 08:08 Rev Time 0.00
Received By aoliver Date 2023-06-01 Time 09:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-05-30 Cont ID  
Sent By rmcphers Date 2023-05-30 Time 14:33 Rev Time 0.00
Received By rmcphers Date 2023-05-12 Time 06:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-06-02 Cont ID  
Sent By rmcphers Date 2023-06-02 Time 15:39 Rev Time 0.00
Received By rmcphers Date 2023-06-02 Time 15:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-05-30 Cont ID  
Sent By rmcphers Date 2023-05-30 Time 14:31 Rev Time 0.00
Received By rmcphers Date 2023-05-30 Time 14:31 Sent To  
Notes
2023-05-30 14:33:01SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) THE SIGNED AND SEALED DRAWINGS DO NOT SHOW AS
 DIGITALLY SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop Z ZONING
Rev No 3 Status P Date 2023-07-03 Cont ID  
Sent By cibaven Date 2023-07-03 Time 16:48 Rev Time 0.00
Received By cibaven Date 2023-07-03 Time 16:47 Sent To  
Notes
2023-07-03 16:48:07PROVISO: ONLY SIDEWALK REPAIR WORK IS APPROVED, A
 DIFFERENT PERMIT APPLICATION WILL NEED TO BE SUBMITTED
 FOR ANY TEMPORARY CONSTRUCTION FENCE PROPOSED.

Review Stop Z ZONING
Rev No 2 Status P Date 2023-06-16 Cont ID  
Sent By cibaven Date 2023-06-16 Time 08:12 Rev Time 0.00
Received By cibaven Date 2023-06-16 Time 08:12 Sent To  
Notes
2023-06-16 08:12:33PROVISO: ONLY SIDEWALK REPAIR WORK IS APPROVED, A
 DIFFERENT PERMIT APPLICATION WILL NEED TO BE SUBMITTED
 FOR ANY TEMPORARY CONSTRUCTION FENCE PROPOSED.

Review Stop Z ZONING
Rev No 1 Status P Date 2023-05-26 Cont ID  
Sent By cibaven Date 2023-05-26 Time 13:52 Rev Time 0.00
Received By cibaven Date 2023-05-26 Time 13:52 Sent To  
Notes
2023-05-26 13:52:39PROVISO: ONLY SIDEWALK REPAIR WORK IS APPROVED, A
 DIFFERENT PERMIT APPLICATION WILL NEED TO BE SUBMITTED
 FOR ANY TEMPORARY CONSTRUCTION FENCE PROPOSED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved