| 2023-05-19 15:41:34 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE IS NO INDICATION OF A MANUFACTURER'S |
| | SPECIFICATION SHEET NOR A PRODUCT NAME FOR THE PROPOSED |
| | VINYL FLOORING. |
| | |
| | VINYL FLOORING IS MANUFACTURED AROUND THE WORLD BUT NOT |
| | ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS. |
| | |
| | PER NFPA 101, CH 30 |
| | |
| | 30.3.3.3 INTERIOR FLOOR FINISH. |
| | 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN |
| | ACCORDANCE WITH |
| | SECTION 10.2. |
| | |
| | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH |
| | 10.2.2.2 |
| | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL |
| | HAVE A |
| | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE VINYL |
| | FLOORING NAME AND THE PRODUCT SPEC SHEETS INDICATING |
| | THE FIRE BEHAVIOR RATING. |
| | |
| | IF THE PROPOSED FLOORING IS PORCELAIN/CERAMIC TILE, |
| | NATURAL STONE TILE, CONCRETE TILES, PRODUCT SPEC SHEETS |
| | WOULD NOT BE REQUIRED. |
| | |
| | PRODUCT SPEC SHEETS ARE REQUIRED FOR LVT, VINYL |
| | FLOORING, WOOD/VINYL LAMINATES, ETC. |
| | |
| | |
| | |
| | 2) THERE IS AN INDICATION OF A DROP CEILING BUT NO |
| | CALL-OUT FOR THE CEILING STRUCTURE |
| | |
| | PER NFPA 1 |
| | |
| | 1.7.12 PLANS AND SPECIFICATIONS. |
| | |
| | 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| | PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH |
| | APPLICABLE CODES AND STANDARDS |
| | |
| | PLEASE PROVIDE CEILING DETAILS. |
| | |
| | |
| | |
| | 3) THERE IS AN INDICATION OF A DROP CEILING BUT NO |
| | CALL-OUT FOR FIRE SPRINKLER MODIFICATIONS |
| | |
| | PER NFPA 1 |
| | |
| | 1.7.12 PLANS AND SPECIFICATIONS. |
| | |
| | 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| | PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH |
| | APPLICABLE CODES AND STANDARDS |
| | |
| | PLEASE PROVIDE A NOTE TO MODIFY FIRE SPRINKLER HEADS |
| | UNDER SEPARATE PERMIT & SHOP DRAWINGS. |
| | |
| | |
| | |
| | 4) THERE IS AN INDICATION OF INSTALL A DOOR BUT NO DOOR |
| | SCHEDULE INCLUDING SIZE AND HARDWARE. |
| | |
| | ALSO INCLUDE THE EXACT LOCATION ON THE FLOOR PLAN |
| | |
| | PER NFPA 1 |
| | |
| | 1.7.12 PLANS AND SPECIFICATIONS. |
| | |
| | 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| | PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH |
| | APPLICABLE CODES AND STANDARDS |
| | |
| | PLEASE PROVIDE DOOR DETAILS |
| | |
| | |
| | |
| | 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |