Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-07-21 Cont ID  
Sent By rmcphers Date 2023-07-21 Time 07:46 Rev Time 0.00
Received By rmcphers Date 2023-07-21 Time 07:43 Sent To  
Notes
2023-07-21 07:46:51CONCRETE SLAB
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWING C100 HAS AN AREA THAT IS SHADED AT THE NORTH
 END - UNABLE TO SEE THE SLAB ELEVATION MARKER ON THE
 SOUTH WEST CORNER - SLAB SHOULD SLOPE AWAY FROM THE
 ADJACENT PROPERTY - PLEASE CLARIFY THE SHADED AREA.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-06-07 Cont ID  
Sent By rmcphers Date 2023-06-07 Time 15:50 Rev Time 0.00
Received By rmcphers Date 2023-06-07 Time 15:26 Sent To  
Notes
2023-06-07 15:55:21CONCRETE SLAB
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE
 READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED
 TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop I INCOMING/PROCESSING
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By amcgrego Date 2023-07-12 Time 08:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-07 Cont ID  
Sent By rmcphers Date 2023-06-07 Time 15:56 Rev Time 0.00
Received By rmcphers Date 2023-05-15 Time 10:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-07-14 Cont ID  
Sent By rmcphers Date 2023-07-14 Time 13:40 Rev Time 0.00
Received By rmcphers Date 2023-07-14 Time 13:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-06-07 Cont ID  
Sent By rmcphers Date 2023-06-07 Time 15:55 Rev Time 0.00
Received By rmcphers Date 2023-06-07 Time 15:55 Sent To  
Notes
2023-06-07 15:56:05SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE
 READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED
 TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop Z ZONING
Rev No 2 Status F Date 2023-08-09 Cont ID  
Sent By jlswaby Date 2023-08-09 Time 13:16 Rev Time 0.00
Received By jlswaby Date 2023-08-09 Time 13:15 Sent To  
Notes
2023-08-09 13:15:551. SEPARATE PERMIT REQUIRED FOR WALL/FENCE
 2. TREES, SHRUBS, NATURAL GRASS, GROUND COVER, OR OTHER
 SUITABLE LIVE PLANT MATERIAL SHALL BE PLANTED OVER THE
 ENTIRE BUFFER STRIP AREA.
 - AT LEAST ONE SHADE OR FLOWERING TREE SHALL BE PLANTED
 IN A REQUIRED BUFFER STRIP FOR EACH 30 LINEAR FEET OR
 PORTION THEREOF. PAVED AREAS USED FOR PEDESTRIAN
 CIRCULATION AND VEHICULAR ACCESS SHALL BE INCLUDED WHEN
 CALCULATING THE LENGTH OF THE BUFFER STRIP. TREES MAY
 BE CLUSTERED OR PLANTED IRREGULARLY AS DEEMED
 APPROPRIATE. CLUSTERING OF REQUIRED TREES SHALL BE
 SUBJECT TO CITY APPROVAL.
 - TO DETERMINE THE AMOUNT OF REQUIRED PLANT MATERIAL,
 THE REQUIRED BUFFER STRIP LENGTH SHALL BE MEASURED
 ALONG THE CENTERLINE OF THE BUFFER.
 3. PROVIDE COMPLETE EASEMENT CONSENT FORM. FOR
 CONSTRUCTION OF FENCE BORDERING EASEMENT. ( FORM WILL
 BE EMAILED TO APPLICANT)
 JERMAINE SWABY
 SENIOR PLANNER
 561-822-1431
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2023-06-05 Cont ID  
Sent By jswaby Date 2023-06-05 Time 15:32 Rev Time 0.00
Received By jlswaby Date 2023-06-05 Time 15:32 Sent To  
Notes
2023-06-05 15:32:251. PROVIDE A CURRENT SURVEY OF PROPERTY
 2. SEPARATE PERMIT REQUIRED FOR WALL/FENCE
 3. FOR INDUSTRIAL DISTRICTS, THE BUFFER STRIP SHALL BE
 AT LEAST 10 FEET WIDE ALONG THE EDGE OF PROPERTY WHEN
 ADJACENT TO PUBLIC THOROUGHFARE.
 4. SEC. 94-443 (B) TREES, SHRUBS, NATURAL GRASS, GROUND
 COVER, OR OTHER SUITABLE LIVE PLANT MATERIAL SHALL BE
 PLANTED OVER THE ENTIRE BUFFER STRIP AREA.
 AT LEAST ONE SHADE OR FLOWERING TREE SHALL BE PLANTED
 IN A REQUIRED BUFFER STRIP FOR EACH 30 LINEAR FEET OR
 PORTION THEREOF. PAVED AREAS USED FOR PEDESTRIAN
 CIRCULATION AND VEHICULAR ACCESS SHALL BE INCLUDED WHEN
 CALCULATING THE LENGTH OF THE BUFFER STRIP. TREES MAY
 BE CLUSTERED OR PLANTED IRREGULARLY AS DEEMED
 APPROPRIATE. CLUSTERING OF REQUIRED TREES SHALL BE
 SUBJECT TO CITY APPROVAL.
 TO DETERMINE THE AMOUNT OF REQUIRED PLANT MATERIAL, THE
 REQUIRED BUFFER STRIP LENGTH SHALL BE MEASURED ALONG
 THE CENTERLINE OF THE BUFFER.
  
 JERMAINE SWABY
 SENIOR PLANNER
 561-822-1431
 [email protected]
  