Plan Review Details - Permit 23050036
Plan Review Stops For Permit 23050036
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2023-07-10 Cont ID  
Sent By jgomez Date 2023-07-10 Time 18:38 Rev Time 0.00
Received By jgomez Date 2023-07-10 Time 18:08 Sent To  
Notes
2023-07-10 18:39:00RE-ROOF FOURTH BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23050036
 2206 MERCER AVE
  
  
 PREVIOUS RESPONSE FOR TAS 105 TEST REPORT SUBMITTED:
 1- DIGITAL SIGNATURE COMMENTS:
 A)TESTING REPORT HAS A COPY OF THE ENGINEER???S DIGITAL
 SIGNATURE. DIGITAL SIGNATURES ARE NOT ALLOWED TO BE
 PRINTED. ALL DOCUMENTS PREPARED BY A LICENSED ENGINEER
 NEED TO HAVE THE ORIGINAL VERIFIABLE DIGITAL SIGNATURE
 OF THE ENGINEER AS REQUIRED BY SEC. 61G15-23.004 FAC
 AND CHAPTER 471 F.S.
  
 B)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 RESPONSE:
 NOT ADDRESSED.
  
  
  
  
 PREVIOUS RESPONSE FOR ROOF COVERINGS ATTACHMENT
 CALCULATIONS SUBMITTED:
 3- DIGITAL SIGNATURE COMMENTS:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 RESPONSE:
 CALCULATIONS SUBMITTED NOW HAVE A COPY OF THE
 ENGINEER???S SEAL AND SIGNATURE. NEED TO PROVIDE
 CALCULATIONS WITH ENGINEER'S ORIGINAL SEAL/SIGNATURE.
 SEC. 471 F.S.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2023-06-30 Cont ID  
Sent By jgomez Date 2023-06-30 Time 16:22 Rev Time 0.00
Received By jgomez Date 2023-06-30 Time 14:01 Sent To  
Notes
2023-06-30 16:23:09RE-ROOF THIRD BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23050036
 2206 MERCER AVE
  
 ORIGINAL COMMENT:
 1- PROVIDE FASTENER WITHDRAWAL RESISTANCE TEST TAS 105
 (SIGNED AND SEALED) AS REQUIRED BY LIMITATION #5.6.1.
 AND NOTE #11 OF PRODUCT APPROVAL FL14083-R28 SUBMITTED.
 FAC 61G20.3.001.
  
 RESPONSE:
 DIGITAL SIGNATURE COMMENTS:
 A)TESTING REPORT HAS A COPY OF THE ENGINEER???S DIGITAL
 SIGNATURE. DIGITAL SIGNATURES ARE NOT ALLOWED TO BE
 PRINTED. ALL DOCUMENTS PREPARED BY A LICENSED ENGINEER
 NEED TO HAVE THE ORIGINAL VERIFIABLE DIGITAL SIGNATURE
 OF THE ENGINEER AS REQUIRED BY SEC. 61G15-23.004 FAC
 AND CHAPTER 471 F.S.
  
 B)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
  
 ORIGINAL COMMENT:
 3- SIGNATURE ON ENGINEER ROOF COVERINGS ATTACHMENT
 CALCULATIONS:
 A)CALCULATIONS HAVE A COPY OF THE ENGINEER'S SIGNATURE
 AND SEAL. NEED ORIGINAL SEAL/SIGNATURE WHEN SUBMITTED
 FOR PUBLIC RECORDS. SEC. 471 F.S.
 NOTE: ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 RESPONSE:
 DIGITAL SIGNATURE COMMENTS:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-05-22 Cont ID  
Sent By jgomez Date 2023-05-22 Time 13:32 Rev Time 0.00
Received By jgomez Date 2023-05-22 Time 12:59 Sent To  
Notes
2023-05-22 13:32:15RE-ROOF SECOND BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23050036
 2206 MERCER AVE
  
 1- PROVIDE FASTENER WITHDRAWAL RESISTANCE TEST TAS 105
 (SIGNED AND SEALED) AS REQUIRED BY LIMITATION #5.6.1.
 AND NOTE #11 OF PRODUCT APPROVAL FL14083-R28 SUBMITTED.
 FAC 61G20.3.001.
  
 2- PROVIDE COMPLETE FLORIDA PRODUCT APPROVAL. PRODUCT
 APPROVAL SUBMITTED IS MISSING THE FLORIDA PRODUCT
 APPROVAL COVER PAGE. THIS PAGE IS REQUIRED BECAUSE IT
 SHOWS THE CURRENT CODE VERSION AND THE PRODUCT APPROVAL
 STATUS. CHAPTER 553 F.S. AND FAC 61G20-3.001.
  
 3- SIGNATURE ON ENGINEER ROOF COVERINGS ATTACHMENT
 CALCULATIONS:
 A)CALCULATIONS HAVE A COPY OF THE ENGINEER'S SIGNATURE
 AND SEAL. NEED ORIGINAL SEAL/SIGNATURE WHEN SUBMITTED
 FOR PUBLIC RECORDS. SEC. 471 F.S.
  
 NOTE: ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-05-16 Cont ID  
Sent By jgomez Date 2023-05-16 Time 18:02 Rev Time 0.00
Received By jgomez Date 2023-05-16 Time 17:00 Sent To  
Notes
2023-05-16 18:02:21RE-ROOF BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23050036
 2206 MERCER AVE
  
 NOTE:
 LEVEL 1 ALTERATION. SEC. 602 FBC-EXISTING BUILDING.
 SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK SHALL
 COMPLY WITH THE MATERIALS AND METHODS REQUIREMENTS IN
 THE FLORIDA BUILDING CODE.
  
 1- PROVIDE FASTENER WITHDRAWAL RESISTANCE TEST TAS 105
 (SIGNED AND SEALED) AS REQUIRED BY LIMITATION #5.6.1.
 AND NOTE #11 OF PRODUCT APPROVAL FL14083-R28 SUBMITTED.
 FAC 61G20.3.001.
  
 2- PROVIDE COMPLETE FLORIDA PRODUCT APPROVAL. PRODUCT
 APPROVAL SUBMITTED IS MISSING THE FLORIDA PRODUCT
 APPROVAL COVER PAGE. THIS PAGE IS REQUIRED BECAUSE IT
 SHOWS THE CURRENT CODE VERSION AND THE PRODUCT APPROVAL
 STATUS. CHAPTER 553 F.S. AND FAC 61G20-3.001.
  
 3- DIGITAL SIGNATURE ON ENGINEER ROOF COVERINGS
 ATTACHMENT CALCULATIONS:
 A)CALCULATIONS HAVE A COPY OF THE ENGINEER'S DIGITAL
 SIGNATURE. NEED ORIGINAL SEAL/SIGNATURE WHEN SUBMITTED
 FOR PUBLIC RECORDS. SEC. 471 F.S.
 NOTE: ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 B)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/... AND REVISE DIGITAL SIGNATURE AS REQUIRED.
  
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-07-10 Cont ID  
Sent By jgomez Date 2023-07-10 Time 18:39 Rev Time 0.00
Received By jgomez Date 2023-07-10 Time 18:08 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-06-30 Cont ID  
Sent By jgomez Date 2023-06-30 Time 16:23 Rev Time 0.00
Received By jgomez Date 2023-06-30 Time 14:00 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-05-22 Cont ID  
Sent By jgomez Date 2023-05-22 Time 13:32 Rev Time 0.00
Received By jgomez Date 2023-05-22 Time 12:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-05-16 Cont ID  
Sent By jgomez Date 2023-05-16 Time 18:03 Rev Time 0.00
Received By jgomez Date 2023-05-09 Time 12:14 Sent To I
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2023-07-10 Cont ID  
Sent By jgomez Date 2023-07-10 Time 18:39 Rev Time 0.00
Received By jgomez Date 2023-07-10 Time 18:39 Sent To  
Notes
2023-07-10 18:39:35SIGNATURE REVIEW
  
  
 PREVIOUS RESPONSE FOR TAS 105 TEST REPORT SUBMITTED:
 1- DIGITAL SIGNATURE COMMENTS:
 A)TESTING REPORT HAS A COPY OF THE ENGINEER???S DIGITAL
 SIGNATURE. DIGITAL SIGNATURES ARE NOT ALLOWED TO BE
 PRINTED. ALL DOCUMENTS PREPARED BY A LICENSED ENGINEER
 NEED TO HAVE THE ORIGINAL VERIFIABLE DIGITAL SIGNATURE
 OF THE ENGINEER AS REQUIRED BY SEC. 61G15-23.004 FAC
 AND CHAPTER 471 F.S.
  
 B)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 RESPONSE:
 NOT ADDRESSED.
  
  
  
  
 PREVIOUS RESPONSE FOR ROOF COVERINGS ATTACHMENT
 CALCULATIONS SUBMITTED:
 3- DIGITAL SIGNATURE COMMENTS:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 RESPONSE:
 CALCULATIONS SUBMITTED NOW HAVE A COPY OF THE
 ENGINEER???S SEAL AND SIGNATURE. NEED TO PROVIDE
 CALCULATIONS WITH ENGINEER'S ORIGINAL SEAL/SIGNATURE.
 SEC. 471 F.S.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2023-06-30 Cont ID  
Sent By jgomez Date 2023-06-30 Time 16:57 Rev Time 0.00
Received By jgomez Date 2023-06-30 Time 16:57 Sent To  
Notes
2023-06-30 16:58:00SEE BUILDING REVIEW COMMENTS. JG.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2023-05-22 Cont ID  
Sent By jgomez Date 2023-05-22 Time 13:59 Rev Time 0.00
Received By jgomez Date 2023-05-22 Time 13:59 Sent To  
Notes
2023-05-22 13:59:521- SIGNATURE ON ENGINEER ROOF COVERINGS ATTACHMENT
 CALCULATIONS:
 A)CALCULATIONS HAVE A COPY OF THE ENGINEER'S SIGNATURE
 AND SEAL. NEED ORIGINAL SEAL/SIGNATURE WHEN SUBMITTED
 FOR PUBLIC RECORDS. SEC. 471 F.S.
  
 NOTE: ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 ENGINEERS
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-05-16 Cont ID  
Sent By jgomez Date 2023-05-16 Time 18:02 Rev Time 0.00
Received By jgomez Date 2023-05-16 Time 17:12 Sent To  
Notes
2023-05-16 18:03:15DIGITAL SIGNATURE REVIEW:
  
 1- DIGITAL SIGNATURE ON ENGINEER ROOF COVERINGS
 ATTACHMENT CALCULATIONS:
 A)CALCULATIONS HAVE A COPY OF THE ENGINEER'S DIGITAL
 SIGNATURE. NEED ORIGINAL SEAL/SIGNATURE WHEN SUBMITTED
 FOR PUBLIC RECORDS. SEC. 471 F.S.
 NOTE: ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 B)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/??? AND REVISE DIGITAL SIGNATURE AS REQUIRED.
  
 61G15-23.004. F.A.C. PROCEDURES FOR DIGITALLY SIGNING
 AND SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved