Plan Review Details - Permit 23041442
Plan Review Stops For Permit 23041442
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2023-05-30 Cont ID  
Sent By cpuell Date 2023-05-30 Time 16:46 Rev Time 0.00
Received By cpuell Date 2023-05-30 Time 16:46 Sent To  
Notes
2023-05-30 16:46:56ADDRESS APPROPRIATE FOR PROJECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-07-21 Cont ID  
Sent By jgomez Date 2023-07-21 Time 13:13 Rev Time 0.00
Received By jgomez Date 2023-07-20 Time 18:49 Sent To  
Notes
2023-07-20 18:57:2107/20/23 COMMENTS REVISED BASED ON:
 **PERMIT DESCRIPTION AND PHASING AGREED BETWEEN DON
 JOHNSON AND ROBERT BROWN ON 7/20/23. RB**
  
 NOTE:
 THIS PERMIT IS FOR THE CONSTRUCTION OF FOUNDATION FOR
 RELOCATED EXISTING HOUSE ONLY. THE PROPOSED ADDITION
 WILL BE DONE AS PHASE TWO UNDER A SEPARATE PERMIT. THE
 ADDITION SHOWN IN THIS PLAN IS FOR REFERENCE ONLY.
  
  
 RESIDENTIAL(R3)FOUNDATION BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23041442
 3140 WASHINGTON RD
  
 (1)-THE PROPOSED ALTERATION/ADDITION IS GOING TO BE
 BUILT IN A AE FLOOD ZONE WITH A BASE FLOOD ELEVATION
 (BFE) OF 6, 7 AND 8 FEET BASED ON NAVD 88.
 THE PROPOSED WORK IS CONSIDERED A SUBSTANTIAL
 IMPROVEMENT. THE ADDITION AND THE EXISTING HOUSE SHALL
 HAVE THE LOWEST FLOOR FINISHED ELEVATION ELEVATED TO OR
 ABOVE THE BASE FLOOD ELEVATION PLUS TWO FEET.
 NOTE: PLANS (INCLUDING FOUNDATION PLAN) NEED TO SHOW
 THE PROPOSED FINISHED FLOOR ELEVATIONS FOR MAIN HOUSE
 AND GARAGES.
 IMPORTANT: NEED TO PROVIDE THE CONSTRUCTION DRAWINGS
 ELEVATION CERTIFICATE AND SURVEY SHOWING THE FINISH
 FLOOR ELEVATIONS FOR REVIEW/ELEVATIONS VERIFICATION.
 CITY ORDINANCE 4729-17.
 SEC. 18-33 TECHNICAL AMENDMENTS TO FLORIDA BUILDING
 CODE.
 SEC. 107.3.5.3 CITY AMENDMENTS.
  
 DURING THE CONSTRUCTION OF THIS STRUCTURE THREE
 DIFFERENT FLOOD ELEVATION CERTIFICATES WILL BE
 REQUIRED:
 (A)CONSTRUCTION DRAWINGS.
 (B)BUILDING UNDER CONSTRUCTION.
 (C)FINISHED CONSTRUCTION.
  
 IMPORTANT NOTE:
 SECTION R322.1 FBC-RESIDENTIAL STATES THAT
 BUILDINGS/STRUCTURES THAT ARE LOCATED IN MORE THAN ONE
 FLOOD HAZARD AREA SHALL COMPLY WITH THE PROVISIONS
 ASSOCIATED WITH THE MOST RESTRICTIVE FLOOD HAZARD AREA.
 KEEP THIS IN MIND IF THE PROPOSED ADDITION WILL TOUCH
 THE CONTOUR OF THE FLOOD HARD AREA WITH THE 8 FEET
 BASED FLOOD ELEVATION. ALSO PROPOSED OUTDOOR KITCHEN
 WILL BE LOCATED IN THE 8 FT BFE.
  
 (2)- PROPOSED WORK AFFECTS THE LOT DRAINAGE. PROVIDE
 DRAINAGE PLAN SHOWING HOW THE SURFACE DRAINAGE IS KEPT
 WITHIN THE LOT AND NOT DIVERTED TO ADJACENT PROPERTIES.
 PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH THE
 FOLLOWING SECTIONS: R401.3 FBC-RESIDENTIAL. SEC.
 107.2.5 CITY AMENDMENTS AND SEC. 110.9 CITY AMENDMENTS.
 NOTE: DRAINAGE PLAN TO SHOW THE EXISTING AND PROPOSED
 GRADE ELEVATIONS SHOWING HOW KEEPING WATER AWAY FROM
 ADJACENT PROPERTIES.
 COORDINATE WITH ITEM #1 ABOVE TO AVOID
 CONFLICTS/DELAYS.
  
 (3)STRUCTURAL PLANS:
 (A)PROVIDE INFORMATION FOR ENCLOSED AREAS BELOW THE
 DESIGN FLOOD ELEVATION AS REQUIRED BY SEC. R322.2.2
 FBC-RESIDENTIAL. PROVIDE COMPLETE INFORMATION FOR FLOOD
 OPENINGS. SPECIFY LOCATION, TYPE AND SIZE. AND PROVIDE
 PRODUCT APPROVAL IF USING ENGINEERED FLOOD VENTS.
  
 (A)DESIGN CRITERIA ON SHEET S100: ENGINEER TO SPECIFY
 THE WIND SPEED CONVERSION. SEC. R301.2.1.3
 FBC-RESIDENTIAL.
  
 (3)DIGITAL SIGNATURE REVIEW.
 (A)GEOTECHNICAL REPORT:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (B)PLUMBING PLANS SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (C)ELECTRICAL PLAN E1.1 SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND
 HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE
 REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-07-19 Cont ID  
Sent By jgomez Date 2023-07-19 Time 14:04 Rev Time 0.00
Received By jgomez Date 2023-07-19 Time 13:51 Sent To  
Notes
2023-07-19 14:05:14RESIDENTIAL (R3) FOUNDATION BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23041442
 3140 WASHINGTON RD
  
 (1)-THE PROPOSED ALTERATION/ADDITION IS GOING TO BE
 BUILT IN A AE FLOOD ZONE WITH A BASE FLOOD ELEVATION
 (BFE) OF 6, 7 AND 8 FEET BASED ON NAVD 88.
 THE PROPOSED WORK IS CONSIDERED A SUBSTANTIAL
 IMPROVEMENT. THE ADDITION AND THE EXISTING HOUSE SHALL
 HAVE THE LOWEST FLOOR FINISHED ELEVATION ELEVATED TO OR
 ABOVE THE BASE FLOOD ELEVATION PLUS TWO FEET.
 NOTE: PLANS (INCLUDING THE FOUNDATION PLAN) NEED TO
 SHOW THE PROPOSED FINISHED FLOOR ELEVATIONS FOR MAIN
 HOUSE AND GARAGES. ALSO, NEED TO PROVIDE THE
 CONSTRUCTION DRAWINGS ELEVATION CERTIFICATE AND SURVEY
 SHOWING THE FINISH FLOOR ELEVATIONS FOR REVIEW.
 CITY ORDINANCE 4729-17.
 SEC. 18-33 TECHNICAL AMENDMENTS TO FLORIDA BUILDING
 CODE.
 SEC. 107.3.5.3 CITY AMENDMENTS.
  
 DURING THE CONSTRUCTION OF THIS STRUCTURE THREE
 DIFFERENT FLOOD ELEVATION CERTIFICATES WILL BE
 REQUIRED:
 (A)CONSTRUCTION DRAWINGS.
 (B)BUILDING UNDER CONSTRUCTION.
 (C)FINISHED CONSTRUCTION.
  
 (2)- PROPOSED WORK AFFECTS THE LOT DRAINAGE. PROVIDE
 DRAINAGE PLAN SHOWING HOW THE SURFACE DRAINAGE IS KEPT
 WITHIN THE LOT AND NOT DIVERTED TO ADJACENT PROPERTIES.
 PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH THE
 FOLLOWING SECTIONS: R401.3 FBC-RESIDENTIAL. SEC.
 107.2.5 CITY AMENDMENTS AND SEC. 110.9 CITY AMENDMENTS.
 NOTE: DRAINAGE PLAN TO SHOW THE EXISTING AND PROPOSED
 GRADE ELEVATIONS SHOWING HOW KEEPING WATER AWAY FROM
 ADJACENT PROPERTIES.
 COORDINATE WITH ITEM #1 ABOVE TO AVOID
 CONFLICTS/DELAYS.
  
 (3)STRUCTURAL PLANS ARE INCOMPLETE:
 (A) THEY DON'T SHOW THE PROPOSED ADDITION. ONLY
 EXISTING HOUSE IS PROVIDED. PROVIDE COMPLETE PLANS AND
 SHOW FINISH FLOOR ELEVATIONS. COORDINATE WITH ITEM #1
 ABOVE.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 (B)DESIGN CRITERIA ON SHEET S100: ENGINEER TO SPECIFY
 THE WIND SPEED CONVERSION. SEC. R301.2.1.3
 FBC-RESIDENTIAL.
  
 (3)SEPARATE PERMIT REQUIRED FOR DEMOLITION OF CABANA,
 EXTERIOR WALLS OF MAIN HOUSE, POOL & DECK. SEC. 105.1
 CITY AMENDMENTS.
  
 (4) DIGITAL SIGNATURE REVIEW.
 (A)GEOTECHNICAL REPORT:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (B)PLUMBING PLANS SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (C)ELECTRICAL PLAN E1.1 SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND
 HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE
 REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2023-06-05 Cont ID  
Sent By jleahy Date 2023-06-05 Time 14:48 Rev Time 0.00
Received By jleahy Date 2023-06-05 Time 10:54 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-06-02 Cont ID  
Sent By lquinone Date 2023-06-02 Time 13:19 Rev Time 0.00
Received By lquinone Date 2023-06-02 Time 13:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-21 Cont ID  
Sent By jgomez Date 2023-07-21 Time 13:34 Rev Time 0.00
Received By jgomez Date 2023-07-20 Time 18:47 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-07-19 Cont ID  
Sent By jgomez Date 2023-07-19 Time 14:07 Rev Time 0.00
Received By jgomez Date 2023-05-19 Time 09:26 Sent To I
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status N Date 2023-07-21 Cont ID  
Sent By jgomez Date 2023-07-21 Time 13:30 Rev Time 0.00
Received By jgomez Date 2023-07-21 Time 13:30 Sent To  
Notes
2023-07-21 13:30:5507/20/23 COMMENTS REVISED BASED ON:
 **PERMIT DESCRIPTION AND PHASING AGREED BETWEEN DON
 JOHNSON AND ROBERT BROWN ON 7/20/23. RB**
  
 NOTE:
 THIS PERMIT IS FOR THE CONSTRUCTION OF FOUNDATION FOR
 RELOCATED EXISTING HOUSE ONLY. THE PROPOSED ADDITION
 WILL BE DONE AS PHASE TWO UNDER A SEPARATE PERMIT. THE
 ADDITION SHOWN IN THIS PLAN IS FOR REFERENCE ONLY.
  
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2023-07-19 Cont ID  
Sent By jgomez Date 2023-07-19 Time 13:55 Rev Time 0.00
Received By jgomez Date 2023-07-19 Time 13:52 Sent To  
Notes
2023-07-19 13:55:41NOTE:
 COORDINATE WITH MASTER PERMIT
  
  
 IMPACT FEES
 PLANS NEED TO BE REVIEWED BY PALM BEACH COUNTY FOR
 IMPACT FEE ASSESSMENT.
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON
 APPROVAL AND FEE PAYMENT (IF ANY), PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 2 Status F Date 2023-07-21 Cont ID  
Sent By jgomez Date 2023-07-21 Time 13:32 Rev Time 0.00
Received By jgomez Date 2023-07-21 Time 13:32 Sent To  
Notes
2023-07-21 13:32:16NFIP REVIEW:
  
 (1)-THE PROPOSED ALTERATION/ADDITION IS GOING TO BE
 BUILT IN A AE FLOOD ZONE WITH A BASE FLOOD ELEVATION
 (BFE) OF 6, 7 AND 8 FEET BASED ON NAVD 88.
 THE PROPOSED WORK IS CONSIDERED A SUBSTANTIAL
 IMPROVEMENT. THE ADDITION AND THE EXISTING HOUSE SHALL
 HAVE THE LOWEST FLOOR FINISHED ELEVATION ELEVATED TO OR
 ABOVE THE BASE FLOOD ELEVATION PLUS TWO FEET.
 NOTE: PLANS (INCLUDING FOUNDATION PLAN) NEED TO SHOW
 THE PROPOSED FINISHED FLOOR ELEVATIONS FOR MAIN HOUSE
 AND GARAGES.
 IMPORTANT: NEED TO PROVIDE THE CONSTRUCTION DRAWINGS
 ELEVATION CERTIFICATE AND SURVEY SHOWING THE FINISH
 FLOOR ELEVATIONS FOR REVIEW/ELEVATIONS VERIFICATION.
 CITY ORDINANCE 4729-17.
 SEC. 18-33 TECHNICAL AMENDMENTS TO FLORIDA BUILDING
 CODE.
 SEC. 107.3.5.3 CITY AMENDMENTS.
  
 DURING THE CONSTRUCTION OF THIS STRUCTURE THREE
 DIFFERENT FLOOD ELEVATION CERTIFICATES WILL BE
 REQUIRED:
 (A)CONSTRUCTION DRAWINGS.
 (B)BUILDING UNDER CONSTRUCTION.
 (C)FINISHED CONSTRUCTION.
  
 IMPORTANT NOTE:
 SECTION R322.1 FBC-RESIDENTIAL STATES THAT
 BUILDINGS/STRUCTURES THAT ARE LOCATED IN MORE THAN ONE
 FLOOD HAZARD AREA SHALL COMPLY WITH THE PROVISIONS
 ASSOCIATED WITH THE MOST RESTRICTIVE FLOOD HAZARD AREA.
 KEEP THIS IN MIND IF THE PROPOSED ADDITION WILL TOUCH
 THE CONTOUR OF THE FLOOD HARD AREA WITH THE 8 FEET
 BASED FLOOD ELEVATION. ALSO PROPOSED OUTDOOR KITCHEN
 WILL BE LOCATED IN THE 8 FT BFE.
  
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status F Date 2023-07-19 Cont ID  
Sent By jgomez Date 2023-07-19 Time 14:07 Rev Time 0.00
Received By jgomez Date 2023-07-19 Time 14:06 Sent To  
Notes
2023-07-19 14:07:51NFIP REVIEW:
  
 (1)-THE PROPOSED ALTERATION/ADDITION IS GOING TO BE
 BUILT IN A AE FLOOD ZONE WITH A BASE FLOOD ELEVATION
 (BFE) OF 6, 7 AND 8 FEET BASED ON NAVD 88.
 THE PROPOSED WORK IS CONSIDERED A SUBSTANTIAL
 IMPROVEMENT. THE ADDITION AND THE EXISTING HOUSE SHALL
 HAVE THE LOWEST FLOOR FINISHED ELEVATION ELEVATED TO OR
 ABOVE THE BASE FLOOD ELEVATION PLUS TWO FEET.
 NOTE: PLANS (INCLUDING THE FOUNDATION PLAN) NEED TO
 SHOW THE PROPOSED FINISHED FLOOR ELEVATIONS FOR MAIN
 HOUSE AND GARAGES. ALSO, NEED TO PROVIDE THE
 CONSTRUCTION DRAWINGS ELEVATION CERTIFICATE AND SURVEY
 SHOWING THE FINISH FLOOR ELEVATIONS FOR REVIEW.
 CITY ORDINANCE 4729-17.
 SEC. 18-33 TECHNICAL AMENDMENTS TO FLORIDA BUILDING
 CODE.
 SEC. 107.3.5.3 CITY AMENDMENTS.
  
 DURING THE CONSTRUCTION OF THIS STRUCTURE THREE
 DIFFERENT FLOOD ELEVATION CERTIFICATES WILL BE
 REQUIRED:
 (A)CONSTRUCTION DRAWINGS.
 (B)BUILDING UNDER CONSTRUCTION.
 (C)FINISHED CONSTRUCTION.
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2023-07-21 Cont ID  
Sent By ccole Date 2023-07-21 Time 14:58 Rev Time 0.00
Received By ccole Date 2023-07-21 Time 14:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2023-05-26 Cont ID  
Sent By ccole Date 2023-05-26 Time 11:58 Rev Time 0.00
Received By ccole Date 2023-05-26 Time 10:20 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2023-07-21 Cont ID  
Sent By jgomez Date 2023-07-21 Time 13:33 Rev Time 0.00
Received By jgomez Date 2023-07-21 Time 13:33 Sent To  
Notes
2023-07-21 13:33:57(1) DIGITAL SIGNATURE REVIEW.
 (A)GEOTECHNICAL REPORT:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (B)PLUMBING PLANS SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (C)ELECTRICAL PLAN E1.1 SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-07-19 Cont ID  
Sent By jleahy Date 2023-06-05 Time 14:48 Rev Time 0.00
Received By jgomez Date 2023-06-05 Time 10:54 Sent To  
Notes
2023-07-19 14:06:31(1) DIGITAL SIGNATURE REVIEW.
 (A)GEOTECHNICAL REPORT:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (B)PLUMBING PLANS SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 (C)ELECTRICAL PLAN E1.1 SUBMITTED:
 ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE
 REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE
 TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY
 FBPE.
 SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU
 MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED.
 NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR.
  
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
2023-05-26 12:03:20PLUMBING SIGNATURES PASSED.

Review Stop Z ZONING
Rev No 1 Status P Date 2023-06-14 Cont ID  
Sent By lgelman Date 2023-06-14 Time 08:20 Rev Time 0.00
Received By fmittner Date 2023-06-14 Time 08:20 Sent To  
Notes
***NONE***