|
 |
 |
 |
 |
 |
Plan Review Details - Permit 23041200
| Plan Review Stops For Permit 23041200 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2023-06-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-06-22 |
Time |
19:21 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-06-22 |
Time |
19:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2023-06-07 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-06-07 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-06-07 |
Time |
13:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2023-05-26 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-05-26 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-05-26 |
Time |
10:02 |
Sent To |
|
|
| Notes |
| 2023-05-26 10:06:27 | FIRE PROVISO: | | | | | | THE FIRE SUPPRESSION SYSTEM REQUIRES AN | | | EVALUATION TO ENSURE CODE COMPLIANT COVERAGE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2023-07-25 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-07-25 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-07-25 |
Time |
10:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2023-06-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-06-01 |
Time |
08:40 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-06-01 |
Time |
07:42 |
Sent To |
|
|
| Notes |
| 2023-06-01 08:47:15 | 1ST REVIEW FBC-2020 FUEL GAS | | | PERMIT- 23041200 | | | 6/1/23 | | | | | | CODES IN EFFECT: | | | FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEETS P-1 & P-2: TO HELP EXPEDITE THE REVIEW PLEASE | | | SHOW THE NEW GAS PIPING POINT OF CONNECTION TO THE | | | EXISTING- SEC. 402.3 FBC FG. | | | | | | 2) P-1 & P-2: LABEL THE REGULATORS AT THE APPLIANCES AS | | | NEW OR EXISTING AND CLARIFY IF THEY ARE EQUIPPED WITH | | | LEAK LIMITING DEVICES OR WILL REQUIRE VENTS TO THE | | | OUTDOORS- SEC. 410.2 (4) FBC FG. PROVIDE DETAILS FOR | | | VENTS IF REQUIRED- SEC. 410.3 & 410.3.1. | | | | | | 3) P-1 & P-2: PROVIDE COMBUSTION AIR CALCULATIONS FOR | | | THE NEW APPLIANCES USING ONE OF THE METHODS PRESCRIBED | | | IN SECS. 305.5- 304.9 FBC FG. PLEASE NOTE IF USING THE | | | STANDARD METHOD THE MINIMUM REQUIRED VOLUME SHALL BE 50 | | | CU. FT. PER 1,000 BTUH OF THE APPLIANCE INPUT RATINGS. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL/PLUMBING PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2023-07-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
amcgrego |
Date |
2023-07-24 |
Time |
13:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-06-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-06-22 |
Time |
19:22 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-05-25 |
Time |
10:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
N |
Date |
2023-07-25 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-07-25 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-07-25 |
Time |
10:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2023-06-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-06-01 |
Time |
08:47 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-06-01 |
Time |
07:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-07-25 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-07-25 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-07-25 |
Time |
10:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2023-06-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-06-22 |
Time |
19:22 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-06-22 |
Time |
19:22 |
Sent To |
|
|
| Notes |
| 2023-06-07 13:22:15 | ELECTRIC PLAN PASSED SIGNATURE | | 2023-06-01 08:48:16 | PLUMB/GAS SIGS ON P-1 & P-2 PASSED. |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |