| Plan Review Stops For Permit 23040318 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
P |
Date |
2023-07-14 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-07-14 |
Time |
10:26 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-07-14 |
Time |
10:26 |
Sent To |
|
|
| Notes |
| 2023-07-14 10:27:13 | UPDATED ADDRESS AND CREATED SUITE |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2023-05-31 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-05-31 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-05-31 |
Time |
14:24 |
Sent To |
|
|
| Notes |
| 2023-05-31 14:24:54 | SUITE 1525 IS NOT A RECOGNIZED SUITE NUMBER, PLEASE | | | PROVIDE A FLOOR PLAN SHOWING EVERY SUITE ON THAT FLOOR. | | | PLEASE EMAIL TO [email protected] FOR FURTHER | | | QUESTIONS YOU CAN ALSO CALL 561-805-6659 |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
F |
Date |
2023-07-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2023-07-17 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2023-07-17 |
Time |
14:44 |
Sent To |
|
|
| Notes |
| 2023-07-17 14:52:49 | COMMERCIAL ASBESTOS | | | TO THE BUILDING CONTRACTOR: | | | PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION | | | THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE. | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON THE CONTRACTOR???S LETTERHEAD, STATING | | | THAT THE INSTRUCTIONS ON THE WEBSITE OF ASBESTOS | | | PROGRAM COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM | | | BEACH COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION | | | WILL BE GIVEN TIMELY. | | | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | | CAN BE FOUND ON THEIR WEBSITE: | | | HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC | | | ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION | | | -RENOVATION.HTML | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | JAMES A. WITMER BN, PX, SFP, CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES | | | DEPARTMENT | | | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 | | | TEL: 561-805-6717 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2023-06-14 |
Time |
10:18 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2023-06-14 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2023-06-14 10:18:22 | COMMERCIAL ASBESTOS | | | TO THE BUILDING CONTRACTOR: | | | PALM BEACH COUNTY HEALTH DEPARTMENT NEEDS VERIFICATION | | | THE CONTRACTORS ARE AWARE OF THIS FL. STATE STATUTE. | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | | | | JAMES A. WITMER BN, PX, SFP, CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES | | | DEPARTMENT | | | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 | | | TEL: 561-805-6717 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-07-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2023-07-17 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2023-07-17 |
Time |
14:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2023-06-14 |
Time |
10:17 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2023-06-14 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2023-06-14 10:17:38 | WEST PALM BEACH DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 2020 FBC- BUILDING PLAN REVIEW | | | W. P. B. PERMIT: 23040318 | | | ADD: 250 S AUSTRALIAN AVE SUITE: 1525 | | | CONT: TBD/ TO BE DETERMINED | | | TEL: | | | E-MAIL: [email protected] | | | | | | 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH | | | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, | | | ADMINISTRATION | | | | | | 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW | | | CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES | | | SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA | | | BUILDING CODE, BUILDING. | | | | | | 1ST REVIEW | | | DATE: WED. JUNE 14TH/2023 | | | ACTION: DENIED | | | | | | 1) COVERSHEET LIST THE FLOOD ZONE ELEVATION DATA AS | | | FLOOD ZONE A. PLEASE UPDATE PLANS TO NEW MAPS USING | | | NAVD88 THIS BUILDING IS IN FLOOD ZONE X. BFE-9999. | | | | | | 2) SHEET A-201 DETAIL 1 AND A514DETAIL 4 BOTH SHOW WHAT | | | APPEARS TO BE A SHELF FOR A FUTURE MICROWAVE. SHEET | | | E401 LIST BREAKER BOX 15-LB2 CIRCUIT 9 AS OFFICE | | | CONVENIENCE RECEPTACLE, POSSIBLE MICROWAVE. PLEASE SHOW | | | COMPLIANCE WITH THE 2020 FBC-ACCESSIBILITY CODE | | | SECTIONS: | | | 308 REACH RANGES. 308.2 FORWARD REACH. / 308.2.1 | | | UNOBSTRUCTED/ 308.2.2 OBSTRUCTED HIGH REACH. 308.3 SIDE | | | REACH. / 308.3.1 UNOBSTRUCTED/ 308.3.2 OBSTRUCTED HIGH | | | REACH. | | | | | | 309 OPERABLE PARTS. 309.3 HEIGHT. OPERABLE PARTS SHALL | | | BE PLACED WITHIN ONE OR MORE OF THE REACH RANGES | | | SPECIFIED IN 308. 309.4 OPERATION. OPERABLE PARTS SHALL | | | BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT | | | GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE | | | REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS | | | MAXIMUM. | | | | | | 3) A TRANSMITTAL LETTER / NARRATIVE LISTING THE | | | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF | | | THE REVISION MADE, IDENTIFYING THE SHEET OR | | | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL | | | HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR | | | ANTICIPATED COOPERATION. | | | | | | PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS | | | REVIEW, SUBSEQUENT | | | REMARKS MAYBE MADE IN THE NEXT REVIEW CYCLE. | | | | | | MY WORK HOURS ARE USUALLY TUES. & WED. 7:30 AM- 4:30 PM | | | PART-TIME/ SEMI-RETIRED. | | | | | | IF YOU WISH TO SPEAK WITH A PLANS EXAMINER BEFORE I GET | | | BACK INTO THE OFFICE CALL | | | (561)805-6700 AND ASK FOR THE PLANS EXAMINER ON-CALL. | | | THANK YOU. | | | | | | JAMES A. WITMER BN, PX, SFP, CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES | | | DEPARTMENT | | | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 | | | TEL: 561-805-6717 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2023-06-02 |
|
|
Cont ID |
|
| Sent By |
rperdomo |
Date |
2023-06-02 |
Time |
16:24 |
Rev Time |
0.00 |
| Received By |
rperdomo |
Date |
2023-06-02 |
Time |
16:13 |
Sent To |
|
|
| Notes |
| 2023-06-02 16:25:22 | SEPARATE PERMIT REQUIRES FOR LOW VOLTAGE WIRING |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2023-07-12 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-07-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-07-12 |
Time |
11:13 |
Sent To |
|
|
| Notes |
| 2023-07-12 11:13:11 | FIRE PROVISO: | | | | | | ANY REMOVAL OR CONSTRUCTION OF WALLS/CEILINGS REQUIRES | | | AND EVALUATION OF THE FIRE SPRINKLER AND FIRE ALARM | | | SYSTEMS FOR CODE COMPLIANT COVERAGE | | | | | | THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE | | | MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS | | | | | | ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING | | | DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP | | | DRAWINGS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2023-05-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-05-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-05-22 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2023-05-22 14:57:08 | FIRE PROVISO: | | | | | | ANY REMOVAL OR CONSTRUCTION OF WALLS/CEILINGS REQUIRES | | | AND EVALUATION OF THE FIRE SPRINKLER AND FIRE ALARM | | | SYSTEMS FOR CODE COMPLIANT COVERAGE | | | | | | THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE | | | MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS | | | | | | ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING | | | DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP | | | DRAWINGS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2023-07-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
amcgrego |
Date |
2023-07-07 |
Time |
09:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2023-06-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
amcgrego |
Date |
2023-05-18 |
Time |
13:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2023-06-12 |
|
|
Cont ID |
|
| Sent By |
cmontell |
Date |
2023-06-12 |
Time |
14:28 |
Rev Time |
0.00 |
| Received By |
cmontell |
Date |
2023-06-12 |
Time |
14:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2023-07-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-07-13 |
Time |
12:18 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-07-13 |
Time |
12:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2023-05-25 |
Time |
12:10 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2023-05-25 |
Time |
11:46 |
Sent To |
|
|
| Notes |
| 2023-05-25 12:12:20 | 1ST REVIEW FBC-2020 PLUMBING | | | PERMIT- 23040318 | | | 5/25/23 | | | | | | CODES IN EFFECT: | | | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET P-001: PLEASE PROVIDE SANITARY AND WATER RISER | | | DRAWINGS AS REQUIRED BY SEC. 107.3.5.1.3 WPB. RISER | | | DRAWINGS WERE INCLUDED ON PLANS UNDER 23040315, | | | 23040316 & 23040317 AND INCLUDED PIPING CONNECTIONS TO | | | THE WATER HEATERS. | | | | | | 2) THE PLUMBING PLANS- SHEETS P-001, P-101, P-102, | | | P-201, P-501, & P-901 ARE NOT DIGITALLY SIGNED AND | | | SEALED BY THE ENGINEER OF RECORD AND CANNOT BE | | | APPROVED- FL. STATUTE 471.025 AND SEC. 61G15-23.005 | | | FLORIDA ADMINISTRATIVE CODE. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL/PLUMBING PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-07-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2023-07-17 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2023-07-17 |
Time |
14:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2023-06-14 |
Time |
10:22 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2023-06-14 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2023-06-14 10:21:55 | 6-14-23 ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE | | | PROTECTION DIGITAL SIGNATURE ARE GOOD. J WITMER | | 2023-05-25 12:05:03 | PLUMBING SIGNATURES FAILED- PLANS ARE NOT DIGITALLY | | | SIGNED AND SEALED. |
|
|